AECOM
Traffic Modelling and Intersection Analysis Commercial-in-Confidence
DRAFT
Appendix B
Intersection Results – Ultimate Scenario – Reference Case
P:\60313908\6. Draft Docs\6.1 Reports\2014-08-27 Draft Report.docx Revision B – 27-Aug-2014 Prepared for – City of Whittlesea – ABN: 72 431 091 058
B
1 TO WALLAN
Reference Case Design Year Scenario: AM Peak - Intersection Turn Movement Analysis Summary (Total LV and HV Vehicles)
R #N/A
N T #N/A
L #N/A
#N/A
#N/A
#N/A
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
L
R #N/A
L #N/A W T #N/A R #N/A #N/A
R #N/A
N T 1256
L
#N/A 458 44 108
L
631
E
W
L T R
W
#N/A
L
20 469 31
R
N T #N/A
L
L #N/A
#N/A
T S
W
L 71
R 20 69 R #N/A T 129 L
620
E
W
L T R
20 31 20
T 124
#N/A
L
29
56
20
R
L 139 29 52 20
L
48
T S
R T E L
W
L T R
L #N/A W T #N/A R #N/A
48 R #N/A T 57 L
19 #N/A
L
628
T S
W E
R #N/A
61
R
W
L T R
#N/A
#N/A
#N/A
T S
R 78
W
91 85 96
20 44
T S
#N/A
T S
L WT R
#N/A #N/A #N/A
69
R
L
#N/A
L
R 241
L WT R
20
T S
116 650 92
N T 40
L
29
T S
KOUKOURA DRIVE L 95 W T 33 R 142 100
L
L 194
R T E L
R
153
L
E
W
L T R
#N/A
#N/A
L 129
328
T S
#N/A
T S
E
W
L T R
20 414 34 51
L
Two traffic lane Arterial Road (one lane in each direction) Two traffic lane Collector Road (one lane in each direction)
84
29
N T #N/A
64
L
L #N/A
R 46
R
R
N T 302
L 30 W T #N/A R 168
L #N/A
R T E L
11
#N/A
77
R
L
N T #N/A
L #N/A
50
#N/A
T S
R 46 #N/A R #N/A T E #N/A L
#N/A
L
#N/A
L
R
R T L
L
T S
T
37
Education Facility
L
#N/A
T S
R
N T 425
L 21 W T #N/A R 199
L #N/A #N/A R #N/A T E #N/A L
10
#N/A
73
R
#N/A
R
L
#N/A
T S N T #N/A
#N/A
#N/A
T S
54 543 20
L
R
L
L #N/A
92
T S
#N/A
#N/A
#N/A
R
R #N/A
L WT R
E
T S
R T E L
R
N T #N/A
#N/A
L #N/A
#N/A
L #N/A
L
#N/A
T S
L WT R
#N/A
R
L
L WT R
N T 50
64 507 59
L 163
3 41
L
61
T S
52
R
N T 75
R 73 75 503 29
R T L
E
CRAIGIEBURN ROAD
L WT R
37 624 61
L 206
75
38
T S
R 265 25 459 81
2 L
West Approach - Left Turn 398 West Approach - Through 308 West Approach - Right Turn 192
82 East Approach - Right Turn 500 East Approach - Through 0 East Approach - Left Turn
5 143 308
0
20 20 62
R L T E WT L R
L 20
7 158
R T E L
20
R
N T 1350
49 37 172
60 20 20
L 208
367
T S
R 27 #N/A R #N/A T E #N/A L
#N/A
R
49
L
R T E L
R
8
#N/A
96 384 986 328
N T 1304
26 20 73
R
N T #N/A
68
T S
R 53
L WT R
L 199
9 L
#N/A #N/A #N/A
N T 412
50 602 162
R
T S
Education Facility
L WT R
58
#N/A R #N/A T E #N/A L
L
L #N/A
R T E L
32
#N/A #N/A #N/A
R
R 50 62 336 38
20
T S
R #N/A
L WT R
L 157
26 23
#N/A R #N/A T E #N/A L
L
L WT R
#N/A
#N/A #N/A #N/A
N T 28
R 87 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A
L WT R
E
R
#N/A
#N/A
N T
R
L 26 R 419 T E W T R #N/A L
R #N/A 27 22 93
#N/A R #N/A T #N/A L #N/A
L 76
24
BOUNDARY ROAD S
#N/A #N/A #N/A
#N/A
N T #N/A
L 20
124
N T #N/A
W
60 514 #N/A #N/A
R
T S
R #N/A
L #N/A R #N/A T E WT R #N/A L
E
L T R
107
28
35
R 188 #N/A R 340 T 361 L
N T 286
R 20
R
#N/A #N/A #N/A
T S
T S
20 20 42
118
292 1040 96 Bus Priority Routes (different colour represent different bus services)
L 20
#N/A
R 159 41 508 153
North Approach - Left Turn
Four traffic lane Arterial Road (two lanes in each direction)
North Approach - Through
Six traffic lane Arterial Road (three lanes in each direction)
T S
368
T S
120
R
R #N/A
N T #N/A
L #N/A
#N/A
#N/A
#N/A
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
L
93
R
R T E L
L WT R
N T 1273
186 397 351
T S
R
L 57
152
L
385
T S
28 74 229 50
1 50
R
TO EPPING North Approach - Right Turn
Intersection with 20 pedestrians at each approach
L
L 97
LEGEND Intersection with 50 pedestrians at each approach
#N/A
#N/A
4
50
R
L #N/A
#N/A #N/A #N/A
R
N T 200
R 60
R T L
#N/A
T S
R #N/A
L WT R
#N/A R #N/A T E #N/A L
L
87 532 50
106
L 20 R #N/A T E WT R 21 L
L #N/A
23
Major Town Centre, and Community Centre
T S
N T #N/A
#N/A 472 161
R
27 L
R L T E WT L R
20
N T 24
R #N/A
L
L #N/A
T S
R #N/A 157 290 50
42
#N/A #N/A #N/A
#N/A
#N/A #N/A #N/A
93
5
110
R T L
R
N T 1107
L 424 W T 328 R 204
R #N/A 41 60 95
646
T S
R 311 79 783 132
L 45
21
58
R
6 162
R 215 20 R #N/A T E 61 L
N T #N/A
L 192
22
R #N/A
L 20
30
29 442 235
320
L WT R N T 1281
N T 129
R 45
R T E L
EDGARS ROAD
R #N/A
L WT R
N T 22
T S
L
R T E L
51
#N/A
L WT R
Town Centre, Community Centre and Education Facility
#N/A
N T #N/A
50 251 75
50
R
TRAIN STATION
L
451
L #N/A #N/A R #N/A T E #N/A L
L
L #N/A
L 218 147 51 275
R
R
L 50
12
#N/A R #N/A T E #N/A L #N/A
L T R
N T #N/A
#N/A #N/A #N/A #N/A
#N/A #N/A #N/A
L N T 1209
N T #N/A
#N/A
L
50 323 156 50
#N/A R #N/A T E #N/A L
#N/A
L #N/A
L
L 38
R #N/A
L WT R
55
#N/A #N/A #N/A
R
N T #N/A
#N/A
T S
R 50 #N/A R 234 T E 23 L
ANDREW ROAD
R #N/A
L #N/A
#N/A R #N/A T E #N/A L
20
L T R
61
L WT R
L #N/A
16 L
R #N/A
R #N/A N T 1449
#N/A
T S
#N/A 405 65
R
#N/A #N/A #N/A
R
L WT R
#N/A R #N/A T E #N/A L
#N/A
R
R T E L
20
#N/A #N/A #N/A
Town Centre, Community Centre and Education Facility N
N T 1358
N T #N/A
R #N/A 20 294 20
20
T S
R #N/A
L T R
L 20
13 69
#N/A R #N/A T E #N/A L
58
L T R
44
#N/A #N/A #N/A
R
T S
#N/A
T S
R #N/A 148 R #N/A T 134 L
#N/A R 346 T E 20 L
14
L 149
18 #N/A
L T R
R
T S
L #N/A W T #N/A R #N/A
W
50
17 L
E
R
N T 117
EPPING ROAD
T S
R T L
T S
EPPING ROAD
L
532
R 20
SUMMERHILL ROAD 82 371 50
N T #N/A
ANDREW ROAD
244
KOUKOURA DRIVE
L 275
15
N T 20
BODYCOATS
R 543
L 133 W T 224 R 162
N T 1241
R T E L
60 344 33
20
52 130 229 64
31 57
23
73
South Approach - Right Turn
South Approach - Through
South Approach - Left Turn
2 TO WALLAN
Reference Case Design Year Scenario: AM Peak - Intersection Turn Movement Analysis Summary (Light Vehicle)
R #N/A
N T #N/A
L #N/A
#N/A
#N/A
#N/A
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
L
R #N/A
L #N/A W T #N/A R #N/A
593
T S
R #N/A
L #N/A W T #N/A R #N/A
L
L 140
W
W
L
2 440 29
R
N T #N/A
L
L #N/A
#N/A
T
W
583
T S
E
W
L T R
2 31 5
N T 124
#N/A
L
29
53
0
R
L 139 29 52 15
L
48
T S
R T E L
W
L T R
T S
L #N/A W T #N/A R #N/A
45 R #N/A T 53 L
19 #N/A
L
590
T S
W
L 35
E
R #N/A
57
R
W
L T R
#N/A
#N/A
T S
L T R
86 79 90 41
#N/A #N/A #N/A
N T 22
#N/A
L
R 227
L WT R
1
T S
109 611 87
N T 38
153
27
T S
E
94
L
L 183
E
607
T S
R 292
R T L
L
143
L
R T L
E
W
L T R
#N/A
L
#N/A
T S
R T L
E
W
L T R
8 391 32 48
L
Bus Priority Routes (different colour represent different bus services)
143 308
0 South Approach - Right Turn
Two traffic lane Collector Road (one lane in each direction)
L 0
T S N T #N/A
T S
T S
64
R
L
L #N/A
R
R
R
N T 272
L #N/A
R T E L
11 69
L
N T #N/A
L #N/A
32
T S
R 41 #N/A R #N/A T E #N/A L
#N/A
L
R
L
T S
L 71
#N/A
T
R T L
37
Education Facility
L
#N/A
T S
#N/A
R
N T 382
L 19 W T #N/A R 179
L #N/A #N/A R #N/A T E #N/A L
10
#N/A
66
R
#N/A
R
L
#N/A
T S N T #N/A
L
#N/A
T S
51 511 17
L
R
L
L #N/A
82
T S
L
#N/A
R
L #N/A
R #N/A
L WT R
E
79
T S
R T E L
L WT R
60 478 55
#N/A
#N/A
44
L
L #N/A
#N/A
#N/A
T S
L 153
#N/A
L
38
L
57
T S
49
R
R T L
E
CRAIGIEBURN ROAD
L WT R
35 588 57
L 193
331
T S
70
36
T S
R 238 23 431 76
2 L
R T E L
0 14 56
R L T E WT L R
R
L 0
7 142
54 10 0 0
N T 1237
44 34 155
R
N T 70
R 69 70 473 28
330
T S
R 24
L WT R
R T E L
L 187
8
#N/A
87 346 909 295
R
N T 1196
23 18 65
R
N T #N/A
61
T S
R 48
#N/A R #N/A T E #N/A L
L
3
111
R
L #N/A
L WT R
L 180
9 L
#N/A #N/A #N/A
R
N T 47
R 149 38 478 144
N T #N/A
N T 370
1 542 146
R
T S
Education Facility
L WT R
52
#N/A R #N/A T E #N/A L #N/A
R
R T E L
30
#N/A #N/A #N/A
#N/A
R 11 58 316 35
17
T S
R #N/A
L WT R
L 148
26 21
#N/A R #N/A T E #N/A L #N/A
L WT R
#N/A
#N/A #N/A #N/A
N T 26
R 81 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A
L WT R
E
N T
R
L 25 R 393 T E W T R #N/A L
R #N/A 27 22 93
R
#N/A
N T #N/A
24 L
#N/A R #N/A T #N/A L #N/A
57 483 #N/A
BOUNDARY ROAD S
#N/A #N/A #N/A
#N/A
L T R
L 17
124
N T #N/A
W
#N/A
R
T S
R #N/A
E
101
28
35
R 176 #N/A R 320 T 345 L
N T 286
R 0
L #N/A R #N/A T E WT R #N/A L #N/A
#N/A
0 13 42
L 91
82 East Approach - Right Turn 500 East Approach - Through 0 East Approach - Left Turn
5 South Approach - Through
Two traffic lane Arterial Road (one lane in each direction)
#N/A
#N/A
292 1040 96 398 308 192 South Approach - Left Turn
Four traffic lane Arterial Road (two lanes in each direction)
R 42
L 27 W T #N/A R 152
#N/A
#N/A #N/A #N/A
R
North Approach - Left Turn
Intersection with 50 pedestrians at each approach
North Approach - Through
North Approach - Right Turn
A minimum total vehicle of 50 vehicles (LV + HV). If the total volumes less than 50 vehicles, an additional LV of up to 50 will be added to the turn movement to meet the minimum total vehicles. eg. 3 input = 50 total volumes (LV & HV)
Six traffic lane Arterial Road (three lanes in each direction)
L #N/A
T S
108
R
R #N/A
N T #N/A
L #N/A
#N/A
#N/A
#N/A
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
L
88
R
R T E L
L WT R
N T 1170
167 358 316
T S
R
L 51
137
L
347
T S
28 67 206 41
1 28
R
TO EPPING
A minimum total vehicle of 20 vehicles (LV + HV). If the total volumes less than 20 vehicles, an additional LV of up to 20 will be added to the turn movement to meet the minimum total vehicles. eg. 3 input = 20 total volumes (LV & HV)
West Approach - Left Turn West Approach - Through West Approach - Right Turn
L
#N/A #N/A #N/A
L
LEGEND
Intersection with 20 pedestrians at each approach
100
R L 0 #N/A T E WT R 21 L
L #N/A
23
Major Town Centre, and Community Centre
29
N T #N/A
#N/A 444 151
R
27 L
R L T E WT L R
0
N T 24
#N/A #N/A #N/A #N/A
L #N/A
4
0
R
T S
R #N/A 147 272 0
40
R #N/A
L WT R
#N/A
N T 188
R 57 82 500 0
T S
R #N/A
L WT R
#N/A R #N/A T E #N/A L
L 123
308
T S
N T #N/A
#N/A #N/A #N/A
88
5
104
R #N/A 39 56 90
R
N T 1040
L 398 W T 308 R 192
R
L 42
21
58
74 736 124
65
R
L 180
22
303
KOUKOURA DRIVE L 89 W T 31 R 133
R
6 L
R 202
R 7 #N/A T 61 L
N T 126
27 415 226
R #N/A
L 14
30
L WT R
L WT R N T 1205
T S
L
R T E L
46
#N/A
R T E L
EDGARS ROAD
R #N/A
L WT R
Town Centre, Community Centre and Education Facility
T S
#N/A
#N/A
0 226 68
0
R
TRAIN STATION
L
424
#N/A
T S
R 42 138 48 258
L #N/A #N/A R #N/A T E #N/A L
L
L 205
20
R
N T #N/A
L 1
12
#N/A R #N/A T E #N/A L #N/A
W
N T #N/A
#N/A #N/A #N/A
L #N/A
#N/A
0 291 141
R
R
N T 105
13
#N/A R #N/A T E #N/A L
L
#N/A
#N/A
#N/A #N/A #N/A
L N T 1139
R 73
N T #N/A
R #N/A
R
L #N/A
L
T S
L WT R
51
#N/A #N/A #N/A
#N/A
N T #N/A
#N/A R 220 T E 22 L
#N/A
T S R 2
ANDREW ROAD
R #N/A
L #N/A
#N/A R #N/A T E #N/A L
9
L T R
L
R #N/A
R #N/A N T 1364
#N/A
L #N/A
16 57
L WT R
N T #N/A
#N/A 381 61
R
#N/A #N/A #N/A
R
L WT R
#N/A R #N/A T E #N/A L
#N/A
R
R 5 65 R #N/A T 121 L
N T #N/A
R T E L
0
#N/A #N/A #N/A
TownSCentre, Community Centre and Education Facility L 67
7
T S
R #N/A
L T R
1 276 0
13 65
#N/A R #N/A T E #N/A L #N/A
L T R
41
#N/A #N/A #N/A
54
18 L
E
L T R
#N/A
T S
R #N/A 140 R #N/A T 126 L
#N/A R 325 T E 19 L
14 101
R
N T 1279
#N/A
#N/A 430 41
3
17 L
L T R
R
N T 1181
#N/A
W
R #N/A
EPPING ROAD
T S
E
L 2
EPPING ROAD
L
500
R T L
N T 16
R 3
SUMMERHILL ROAD 77 349 2
15 229
KOUKOURA DRIVE
L 258
ANDREW ROAD
L 125 W T 210 R 152
N T 1167
BODYCOATS
R 525
R T E L
60 344 33
10
52 130 229 64
31 57
23
73
3 TO WALLAN
Reference Case Design Year Scenario: AM Peak - Intersection Turn Movement Analysis Summary (Heavy Vehicle)
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
### R ### T E ### L #N/A #N/A #N/A
L
R #N/A
L #N/A W T #N/A R #N/A
N T 75
#N/A
38
T S
R #N/A
L #N/A W T #N/A R #N/A
N T 79
L 9
L
37
T S
#N/A
T S
R #N/A
R 0
SUMMERHILL ROAD
#N/A R 21 T E 1 L
W
#N/A
L
0 28 2 4
L
N T L #N/A #N/A
W
#N/A
L
Town Centre, Community Centre and Education Facility L 4
N T 5
R 0 4 R #N/A T E 8 L
L WT R
0 2 0 0
R
L 9 2 3 1
29
3
L
3
T S
R T E L
W
L T R
R #N/A
L #N/A W T #N/A R #N/A
3 R #N/A T E 3 L
19 #N/A
L
38
T S
W
L 2 R #N/A
#N/A R #N/A T E #N/A L
R
#N/A
R 5
W
L T R
5 5 6
20 3
#N/A
L
0
T S
7 39 6
L
2
T S
6 2 9 6
L
L 12
R T E L
L WT R
25 20 12
N T 66
9
L
20
T S
R #N/A 2 4 6
R T E L
3
T S
0
#N/A
L 0
#N/A
L
L 6
L WT R
1 23 2
L
#N/A
R
T S
L 2 W T #N/A R 20
N T 42
### R ### T E ### L
10 7
R
L #N/A
L
9
T S
#N/A
R
0 1 3
N T 18
4
L
N T #N/A
L 5
24 #N/A
L
L
#N/A #N/A
#N/A #N/A #N/A
L
R
T S
L WT R
3 33 1
R T L
L #N/A W T #N/A R #N/A
E
2
Education Facility
R
L
#N/A R #N/A T #N/A L
L #N/A W T #N/A R #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
L
R
N R T L #N/A #N/A #N/A
L
L
L
R
T S
5
T S
L WT R
R
N T 3
4 29 4
L 10
T S
2
L
4
T S
3
R
R T L
L WT R
E
CRAIGIEBURN ROAD
2 36 4
R 3
6 R 1 T E 0 L 0
R
N T 112
37
T S
N R T L #N/A #N/A #N/A
L 0
L #N/A 0 R 2 T E W T #N/A R #N/A 6 L
7 16
L
L 12
4
2
T S
R 26 1 28 5
2 L
L 21
37
T S
5 4 17
R
N T 4
R 4 4 30 2
3
7
R
5
L WT R
33
8 L
#N/A R #N/A T E #N/A L
10 R 38 T E 77 L
R
N T 108
3 2 7
R
#N/A #N/A #N/A
R 10
R T E L
T S
7
T S
R 5
L WT R
L 20
9 6
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
T S
0 60 16
L
L #N/A W T #N/A R #N/A
E
L WT R
2
L
T S
R T E L
R
#N/A #N/A #N/A
L 6 2 30 9
1
T S
N T 41
R 1 4 20 2
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
Education Facility
N R T L #N/A #N/A #N/A
L 9
26 1
R
N R T L #N/A #N/A #N/A 2 1 6
N T 2
R 5 #N/A R #N/A T E #N/A L
T
BOUNDARY ROAD S
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
N T
R
L #N/A 2 R 25 T E W T #N/A R #N/A #N/A L
L 1
8
T S
W
4 31 #N/A
6
R
28
2
R
E
L T R
12
Two traffic lane Arterial Road (one lane in each direction) Two traffic lane Collector Road (one lane in each direction) Bus Priority Routes (different colour represent different bus services)
North Approach - Left Turn
Four traffic lane Arterial Road (two lanes in each direction)
North Approach - Through
Six traffic lane Arterial Road (three lanes in each direction)
North Approach - Right Turn
Intersection with 20 pedestrians at each approach
19 66 6 25 20 12
5 East Approach - Right Turn 32 East Approach - Through 0 East Approach - Left Turn
5 9 20 0
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
R
L
R T E L
L WT R
T S
R
15
L
7 R 23 T E 5 L
39
T S
N R T 2 1
L 6
1
6
R
N T 104
19 40 35
3
R
TO EPPING
Intersection with 50 pedestrians at each approach
South Approach - Through
South Approach - Right Turn
South Approach - Left Turn
Heavy Vehicle Assumptions: 10% of LV are HV on Epping Road applied on all approaches 6% of LV are HV on all other roads applied on all approaches
N T 12
3
LEGEND
West Approach - Left Turn West Approach - Through West Approach - Right Turn
R
4
0
R
#N/A #N/A #N/A
L
#N/A #N/A
T S
R 4
R T E L
#N/A #N/A
T S
#N/A R #N/A T E #N/A L
6
5 32 0
#N/A
T S
R 0
L 0 R #N/A T E WT R 1 L
2
T S
6
L
R 11 #N/A R 20 T 16 L
23
Major Town Centre, and Community Centre
27 L
R L #N/A T E WT 28 L R 10
R
N T 2
R #N/A
L #N/A W T #N/A R #N/A
N T L #N/A #N/A
L #N/A W T #N/A R #N/A
R
5
7
R
39
T S
R 19 5 47 8
4
L
L 3
21
4
6 10
L WT R
R
N T 2
R 14
L W T R
R 13 0 R #N/A T E 4 L
9 17 0
22
17
R
N R T L #N/A #N/A #N/A
L 11
L #N/A W T #N/A R #N/A
L 1
30
4
T S
R 5 #N/A R #N/A T E #N/A L
ANDREW ROAD
### ### ###
E
2 26 9
EDGARS ROAD
R #N/A
L W T R
N T 3
R 3
L WT R
N R T L #N/A #N/A #N/A
N T 77
L
R
KOUKOURA DRIVE
Town Centre, Community Centre and Education Facility N T 1
27
T S
8
R
L #N/A W T #N/A R #N/A
R
R T E L
#N/A #N/A
T S
TRAIN STATION
L
#N/A
L #N/A
11
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L
L 13 9 R 3 T 16 L
N T L #N/A #N/A
N T 30
R 5
L 3 W T #N/A R 17
5
R
#N/A R #N/A T E #N/A L
L N T 70
R
T S
0 R 25 T E 8 L
0
T S
N R T L #N/A #N/A #N/A
#N/A #N/A #N/A
T S
1
#N/A R #N/A T E #N/A L
L 0
12 L
L
#N/A #N/A
0 32 16
3
L #N/A W T #N/A R #N/A
R
#N/A
L WT R
R
#N/A #N/A
#N/A #N/A #N/A
N T L #N/A #N/A
L #N/A W T #N/A R #N/A
4
#N/A
T S
T S
N T L #N/A #N/A
L
L T R
N T L #N/A #N/A
R #N/A
R #N/A N T 85
4
L
R 0 #N/A R 14 T E 1 L
16
0
#N/A #N/A #N/A
1
R
L #N/A W T 24 R 4
R
#N/A #N/A #N/A
R
R T E L
#N/A R #N/A T E #N/A L
#N/A #N/A
T S
0 18 0
0
T S
R #N/A
L T R
L 0
13
3
#N/A R #N/A T E #N/A L
3
L T R
R
L #N/A W T #N/A R #N/A
R
18 #N/A
6
L
9 R #N/A T E 8 L
L
14
0
R
17 L
L #N/A W T 27 R 3
R N T 12
EPPING ROAD
32
T S
R T E L
T S
N R T L #N/A #N/A #N/A
EPPING ROAD
15
R 5 22 0
15 L
KOUKOURA DRIVE
L 16
N T 1
ANDREW ROAD
8 13 10
N T
BODYCOATS
R 18
L WT R
N T 74
L 4 W T 22 R 2
L 3 8 15 4
31 4
1
5
L T R S
R T E L
4
Reference Case Design Year Scenario: AM Peak - Degree of Saturation (DOS) Summary
TO WALLAN #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
0.16 0.06 0.06 0.31 0.44 0.05
0 0.37 0.09
0.24 0.63 0.18
0
KOUKOURA DRIVE
0
0.08
0.68 0.13
17
0 0.28 0.02
14 0
0.03 0.3 0.26
0.09
#N/A #N/A #N/A
0.33 0.12
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
18 0
0.13 0.16 0 0.13
0.12 0.12 0.13
0.33 0.12
0.46
0.13
0.13
#N/A #N/A #N/A
0.13
#N/A #N/A #N/A
#N/A #N/A #N/A
0
0.77 0.03
0
0.34 0.14
19
#N/A #N/A #N/A
#N/A #N/A #N/A
0.11
0.04 0.19 0.2 0.07
12 0.04
0.05
0.47
0.1
0.37
0
0.03 0 0.37
#N/A #N/A #N/A #N/A #N/A #N/A
0.11 0 0.06
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A 0.18 0.12 0.02
0.11
#N/A #N/A #N/A
#N/A #N/A #N/A
0.46
29
0
0.04 0.25 0.63
#N/A #N/A #N/A #N/A #N/A #N/A
BODYCOATS
0.74 0.24
0 0.02 0.02
16 0.05
Town Centre, Community Centre and Education Facility 0
0 0.38 0.11
0.13 0.13 0.16
#N/A #N/A #N/A 0.35 0 0.14
0.42
0.16 0.19 0.03
13
11 0.08
0.04
0
0.1
0.51
0
EPPING ROAD
0.2
15
ANDREW ROAD
0.53 0.81 0.12 0.22 0.51
SUMMERHILL ROAD
#N/A #N/A #N/A
0.02 0 0.44
#N/A #N/A #N/A
10 0.08
0.11
0
0.09
0.69
0.22
#N/A #N/A #N/A #N/A #N/A #N/A
0.157 0.558 0.558 0.36
0.767
0.167
0.667
0.25 0.56 0.56 0.393 0.088 0.268
20 0.092
#N/A #N/A #N/A
0 1 1
0.745
0.2
0.2
0.4 0.39 0.39 0.36
22
0 0.1 0.32
0.12
0 0.51 0.27
23 0.13
0
0.05 0.55 0
0
24
0.07
0.55 0.28 0.28 0.06 0.45 0
#N/A #N/A #N/A
0.22
#N/A #N/A #N/A
0.07 0.58 0.16
26
#N/A #N/A #N/A
0.47 0.17 0.05
0.04 0.69 0.68
0.07 0.07 0.21
0.41 0.44 0.59
9 0.05
0.05
0.58
0.56
0.85
0.21
0.06 0.02
27 0
0.13 0.58 0.58 0.05 0 0.02
0.09 0.09 0.26
0.06 0.06
28
#N/A #N/A #N/A 0.17 0.21 0.21
#N/A #N/A #N/A
#N/A #N/A #N/A
0.11 0.11 0.76
#N/A #N/A #N/A
0.64 0.1 0.1
8 0.04
0.22
0.21
0.17
0.83
0.02
Education Facility Education Facility #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
0.33 0.33 0.78
#N/A #N/A #N/A
#N/A #N/A #N/A 0.05 0.22 0.22
7 0.16
0.25
0.76
0.21
0.75
0.05
#N/A #N/A #N/A
#N/A #N/A #N/A
21
0.11 0.33 0.33
#N/A #N/A #N/A #N/A #N/A #N/A
EDGARS ROAD
0.14 0.38 0.32
#N/A #N/A #N/A
#N/A #N/A #N/A
0.56 0.78 0.09 0.404 0.818 0.177
0.286 0.286 0.329
0.36 0.39 0.78
5
0.39 0.33 0.63 0.06
0.43
0.03 0.35 0.29
0.16 0.39 0.18
0.19
0.19
LEGEND
Degree of Saturation between 0.85 and 0.95 Degree of Saturation less than 0.85 Intersection not analysed Six traffic lane Arterial Road (three lanes in each direction) Four traffic lane Arterial Road (two lanes in each direction) Two traffic lane Arterial Road (one lane in each direction)
West Approach - Left Turn West Approach - Through West Approach - Right Turn
East Approach - Right Turn East Approach - Through East Approach - Left Turn
39
South Approach - Through
South Approach - Left Turn
South Approach - Right Turn
Two traffic lane Collector Road (one lane in each direction) Bus Priority Routes (different colour represent different bus services)
North Approach - Left Turn
Degree of Saturation between 0.95 and 1.00
0.54 0.08 0.13 0.34 0.43 0.23
0.19
0.05 0.54 0.43
3 0.16 0.16 0.18
0.37 0.41 0.41 0.53 0.54 0.04
CRAIGIEBURN ROAD
0.05 0.5 0.44
2 0.17 0.17 0.48
0.17 0.37 0.11
0.18 0.53 0.74 0.13
0.65
0.19 0.11 0.11 0.36 0.35 0.09
1
TO EPPING North Approach - Through
North Approach - Right Turn
Degree of Saturation greater than 1.00
0.43
4
EPPING ROAD
0.27 0.27 0.37
0.048 0.099
6
#N/A #N/A #N/A
0.74 0.77 0.06 0.05 0 0.053
0.711 0.358 0.358 0.155 0.679 0.476
#N/A #N/A #N/A #N/A #N/A #N/A
0.34 0.34 0.23
#N/A #N/A #N/A
0.053 0.021
30 0
0
ANDREW ROAD
0
KOUKOURA DRIVE
Town Centre, Community Centre and Education Facility
TRAIN STATION
BOUNDARY ROAD Major Town Centre, and Community Centre
0.3
0.11 0.39 0.13
31 0.13 0.13 0.49
0.5 0.26 0.12
5
SITE LAYOUT Site: Intersection 1 AM Reference New Site Signals - Fixed Time
1
2
MOVEMENT SUMMARY Site: Intersection 1 AM Reference New Site Signals - Fixed Time
Site: Intersection 1 AM Reference New Site Signals - Fixed Time
Cycle Time = 110 seconds (User-Given Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Epping Rd 1 L2 2 T1 3 R2
152 386 53
9.9 10.1 5.7
0.134 0.645 0.304
8.9 47.8 53.8
LOS A LOS D LOS D
1.2 10.0 2.6
9.4 76.0 19.4
0.23 0.99 0.95
0.66 0.82 0.74
61.0 39.5 35.4
Approach
591
9.6
0.645
38.3
LOS D
10.0
76.0
0.79
0.77
42.9
East: Lehmanns Rd 4 L2 5 T1 6 R2
55 229 74
9.1 10.0 9.5
0.088 0.353 0.360
19.7 49.7 57.4
LOS B LOS D LOS E
1.4 3.9 3.8
10.6 29.6 28.7
0.54 0.96 0.96
0.71 0.74 0.77
51.9 38.5 34.0
Approach
358
9.8
0.360
46.7
LOS D
3.9
29.6
0.90
0.74
39.0
North: Epping Rd 7 L2 8 T1 9 R2
57 1274 264
10.5 8.2 9.8
0.046 0.754 0.209
8.9 24.9 33.4
LOS A LOS C LOS C
0.5 27.9 4.9
3.5 208.9 36.8
0.22 0.87 0.73
0.65 0.78 0.76
60.8 52.1 43.7
Approach
1595
8.5
0.754
25.8
LOS C
27.9
208.9
0.82
0.77
50.7
West: Craigieburn Rd East 10 L2 186 11 T1 398 12 R2 351
10.2 10.1 10.0
0.184 0.532 0.742
10.2 49.2 60.6
LOS B LOS D LOS E
2.2 6.8 9.7
16.9 52.1 73.8
0.30 0.98 1.00
0.68 0.78 0.86
59.7 38.8 32.9
Approach
935
10.1
0.742
45.7
LOS D
9.7
73.8
0.85
0.79
38.9
3479
9.3
0.754
35.4
LOS D
27.9
208.9
0.83
0.77
44.4
All Vehicles
3
PHASING SUMMARY
Cycle Time = 110 seconds (User-Given Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A1, A2, B, C, D Output Sequence: A1, A2, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A1 Yes 0 6 4 2 12 11 %
A2 No 12 6 4 2 12 11 %
B No 24 40 4 2 46 42 %
C No 70 15 4 2 21 19 %
D No 91 13 4 2 19 17 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians
Created: Friday, 22 August 2014 3:27:17 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 1 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Mov ID
Description
P11 P12 P21 P22 P31 P32 P41 P42
South Stage 1 South Stage 2 East Stage 1 East Stage 2 North Stage 1 North Stage 2 West Stage 1 West Stage 2
All Pedestrians
Demand Flow ped/h 50 50 50 50 50 50 50 50
Average Delay sec 49.3 46.5 28.4 27.0 49.3 44.6 49.3 44.6
Level of Service
400
42.4
LOS E
LOS E LOS E LOS C LOS C LOS E LOS E LOS E LOS E
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Friday, 22 August 2014 3:27:18 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 1 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.95 0.92 0.72 0.70 0.95 0.90 0.95 0.90
Effective Stop Rate per ped 0.95 0.92 0.72 0.70 0.95 0.90 0.95 0.90
0.87
0.87
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Friday, 22 August 2014 3:27:18 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 1 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
6
4
Site: Intersection 2 AM Reference
SITE LAYOUT Site: Intersection 2 AM Reference
5
MOVEMENT SUMMARY New Site Signals - Fixed Time
Site: Intersection 2 AM Reference New Site Signals - Fixed Time
Cycle Time = 90 seconds (Practical Cycle Time)
New Site Signals - Fixed Time Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Collector Rd 1 2 3
L2 T1 R2
Approach
74 38 94
5.4 5.3 6.4
0.170 0.170 0.476
25.3 20.7 47.1
LOS C LOS C LOS D
3.3 3.3 4.1
24.3 24.3 30.1
0.71 0.71 0.98
0.68 0.68 0.77
41.5 37.8 32.9
206
5.8
0.476
34.4
LOS C
4.1
30.1
0.83
0.72
36.5
East: Craigieburn Rd East 4 L2 81 5 T1 459 6 R2 24
6.2 6.1 4.2
0.114 0.367 0.171
25.2 32.5 51.3
LOS C LOS C LOS D
2.2 5.8 1.0
16.4 42.7 7.6
0.66 0.89 0.97
0.74 0.72 0.71
42.9 46.7 33.0
Approach
564
6.0
0.367
32.3
LOS C
5.8
42.7
0.86
0.73
45.3
North: Collector Rd 7 L2 8 T1 9 R2
205 74 73
5.9 5.4 5.5
0.411 0.411 0.368
26.9 22.3 46.5
LOS C LOS C LOS D
9.1 9.1 3.1
66.6 66.6 22.9
0.78 0.78 0.97
0.75 0.75 0.76
40.5 37.1 33.2
Approach
352
5.7
0.411
30.0
LOS C
9.1
66.6
0.82
0.75
38.0
West: Craigieburn Rd East 10 L2 37 11 T1 624 12 R2 61
5.4 5.8 6.6
0.052 0.498 0.442
24.6 33.7 52.9
LOS C LOS C LOS D
1.0 8.2 2.7
7.2 59.9 20.3
0.64 0.92 0.99
0.71 0.76 0.75
43.2 46.0 32.5
Approach
722
5.8
0.498
34.8
LOS C
8.2
59.9
0.92
0.76
44.3
1844
5.9
0.498
33.1
LOS C
9.1
66.6
0.87
0.74
42.3
All Vehicles
6
PHASING SUMMARY
Cycle Time = 90 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Split Phasing Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 10 4 2 16 18 %
B No 16 29 4 2 35 39 %
C No 51 7 4 2 13 14 %
D No 64 20 4 2 26 29 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
P1 P2 P3 P4
South Full Crossing East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20 20
Average Delay sec 34.7 39.2 34.7 39.2
Level of Service
80
37.0
LOS D
LOS D LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements. Created: Tuesday, 22 July 2014 4:57:56 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Ultimate 2046 \Intersection 2 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Processed: Tuesday, 22 July 2014 4:53:00 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Ultimate 2046 \Intersection 2 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.88 0.93 0.88 0.93
Effective Stop Rate per ped 0.88 0.93 0.88 0.93
0.91
0.91
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Tuesday, 22 July 2014 4:53:00 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Ultimate 2046 \Intersection 2 2046.sip6 8000907, AECOM, NETWORK / Enterprise
7
SITE LAYOUT
7
Site: Intersection 3 AM Reference New Site Signals - Fixed Time
8
MOVEMENT SUMMARY Site: Intersection 3 AM Reference New Site Signals - Fixed Time
Site: Intersection 3 AM Reference New Site Signals - Fixed Time
Cycle Time = 90 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Collector Rd 1 2 3
L2 T1 R2
Approach
40 61 52
5.0 6.6 5.8
0.163 0.163 0.202
26.7 22.1 42.2
LOS C LOS C LOS D
3.1 3.1 2.1
22.7 22.7 15.3
0.73 0.73 0.92
0.64 0.64 0.73
41.5 37.8 34.5
153
5.9
0.202
30.1
LOS C
3.1
22.7
0.79
0.67
37.4
East: Craigieburn Rd East 4 L2 30 5 T1 503 6 R2 74
6.7 6.0 5.4
0.041 0.447 0.621
23.9 34.9 55.6
LOS C LOS C LOS E
0.8 6.6 3.5
5.8 48.7 25.4
0.62 0.93 1.00
0.70 0.75 0.79
43.6 45.4 31.9
Approach
607
5.9
0.621
36.9
LOS D
6.6
48.7
0.92
0.76
43.1
North: Collector Rd 7 L2 8 T1 9 R2
163 50 159
6.1 6.0 6.3
0.201 0.083 0.619
20.3 22.8 45.5
LOS C LOS C LOS D
4.3 1.5 6.9
31.4 11.2 50.9
0.63 0.73 0.99
0.72 0.56 0.82
43.0 38.3 33.4
Approach
372
6.2
0.619
31.4
LOS C
6.9
50.9
0.80
0.74
37.8
West: Craigieburn Rd East 10 L2 64 11 T1 507 12 R2 59
6.3 5.7 6.8
0.049 0.449 0.500
8.4 34.9 54.5
LOS A LOS C LOS D
0.4 6.7 2.7
2.6 49.1 20.1
0.21 0.93 1.00
0.65 0.75 0.75
54.3 45.4 32.1
Approach
630
5.9
0.500
34.0
LOS C
6.7
49.1
0.86
0.74
44.4
1762
6.0
0.621
34.1
LOS C
6.9
50.9
0.86
0.74
41.7
All Vehicles
9
PHASING SUMMARY
Cycle Time = 90 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Leading Right Turn Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 13 4 2 19 21 %
B No 19 29 4 2 35 39 %
C No 54 6 4 2 12 13 %
D No 66 18 4 2 24 27 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
P1 P2 P3 P4
South Full Crossing East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20 20
Average Delay sec 36.5 39.2 39.2 36.5
Level of Service
80
37.9
LOS D
LOS D LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements. Created: Wednesday, 20 August 2014 2:54:49 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 3 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Processed: Wednesday, 20 August 2014 2:54:50 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 3 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.90 0.93 0.93 0.90
Effective Stop Rate per ped 0.90 0.93 0.93 0.90
0.92
0.92
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 2:54:50 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 3 2046.sip6 8000907, AECOM, NETWORK / Enterprise
8
10
11
12
9
13
14
15
10
16
17
18
11
19
20
21
12
SITE LAYOUT
22
Site: Intersection 8 AM Referencee New Site Signals - Fixed Time
23
MOVEMENT SUMMARY Site: Intersection 8 AM Referencee New Site Signals - Fixed Time
Site: Intersection 8 AM Referencee New Site Signals - Fixed Time
Cycle Time = 110 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Epping Road 1 2 3
L2 T1 R2
Approach East: Collector Rd 4 L2 5 T1 6 R2 Approach
49 367 21
10.2 10.1 4.8
0.049 0.216 0.214
16.5 18.7 62.7
LOS B LOS B LOS E
1.1 5.8 1.2
8.6 44.1 8.4
0.46 0.63 0.99
0.67 0.53 0.70
43.4 45.9 28.0
437
9.8
0.216
20.6
LOS C
5.8
44.1
0.63
0.55
44.2
21 20 60
4.8 5.0 10.0
0.098 0.098 0.635
40.0 35.4 64.7
LOS D LOS D LOS E
1.7 1.7 3.5
12.6 12.6 26.2
0.81 0.81 1.00
0.67 0.67 0.80
34.3 33.0 27.4
101
7.9
0.635
53.8
LOS D
3.5
26.2
0.92
0.75
29.7
North: Epping Road 7 L2 8 T1 9 R2
208 1304 53
10.1 8.3 9.4
0.210 0.847 0.558
17.7 32.7 65.0
LOS B LOS C LOS E
5.3 34.9 3.0
40.6 261.7 22.8
0.52 0.90 1.00
0.72 0.89 0.76
42.7 39.0 27.5
Approach
1565
8.6
0.847
31.8
LOS C
34.9
261.7
0.85
0.86
38.9
26 20 72
11.5 10.0 9.7
0.112 0.112 0.760
40.2 35.5 66.8
LOS D LOS D LOS E
1.9 1.9 4.3
14.9 14.9 32.3
0.82 0.82 1.00
0.68 0.68 0.88
34.0 32.9 27.0
118
10.2
0.760
55.6
LOS E
4.3
32.3
0.93
0.80
29.2
2221
8.9
0.847
31.8
LOS C
34.9
261.7
0.81
0.79
38.6
West: Collector Rd 10 L2 11 T1 12 R2 Approach All Vehicles
24
PHASING SUMMARY
Cycle Time = 110 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 6 4 2 12 11 %
B No 12 51 4 2 57 52 %
C No 69 6 4 2 12 11 %
D No 81 23 4 2 29 26 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians
Created: Wednesday, 20 August 2014 2:58:24 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 8 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Mov ID
Description
P1 P2 P3 P4
South Full Crossing East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20 20
Average Delay sec 49.2 21.0 49.2 21.0
Level of Service
80
35.1
LOS D
LOS E LOS C LOS E LOS C
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.0 0.0 0.1 0.1 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 2:58:26 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 8 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.95 0.62 0.95 0.62
Effective Stop Rate per ped 0.95 0.62 0.95 0.62
0.78
0.78
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 2:58:26 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 8 2046.sip6 8000907, AECOM, NETWORK / Enterprise
13
SITE LAYOUT Site: Intersection 9 AM Reference New Site Signals - Fixed Time
25
26
MOVEMENT SUMMARY Site: Intersection 9 AM Reference New Site Signals - Fixed Time
Site: Intersection 9 AM Reference New Site Signals - Fixed Time
Cycle Time = 80 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Epping Rd 1 L2 2 T1 3 R2
58 68 328
10.3 10.3 10.1
0.053 0.047 0.582
7.3 15.7 40.7
LOS A LOS B LOS D
0.4 0.8 6.2
3.1 6.1 47.2
0.27 0.64 0.97
0.61 0.48 0.81
52.6 47.8 36.9
Approach
454
10.1
0.582
32.6
LOS C
6.2
47.2
0.83
0.73
39.8
East: Boundary Rd 4 L2 5 T1 6 R2
986 384 97
7.8 9.9 10.3
0.590 0.441 0.408
24.0 31.0 43.0
LOS C LOS C LOS D
14.1 6.5 3.6
105.4 49.7 27.7
0.78 0.90 0.96
0.82 0.77 0.78
46.8 43.7 37.6
Approach
1467
8.5
0.590
27.1
LOS C
14.1
105.4
0.82
0.81
45.2
North: Epping Rd 7 L2 8 T1 9 R2
200 411 50
10.0 10.0 2.0
0.205 0.691 0.091
11.1 36.6 21.8
LOS B LOS D LOS C
3.0 8.1 1.2
22.7 61.5 8.7
0.48 0.99 0.65
0.68 0.86 0.70
52.2 37.6 43.7
Approach
661
9.4
0.691
27.8
LOS C
8.1
61.5
0.81
0.80
41.6
West: Boundary Rd 10 L2 11 T1 12 R2
50 602 162
2.0 10.0 9.9
0.040 0.692 0.679
6.7 36.4 44.1
LOS A LOS D LOS D
0.3 11.3 6.5
2.0 85.6 49.3
0.23 0.97 1.00
0.60 0.88 0.86
53.3 43.2 34.6
814
9.5
0.692
36.1
LOS D
11.3
85.6
0.93
0.86
41.7
3396
9.1
0.692
30.1
LOS C
14.1
105.4
0.85
0.81
42.8
Approach All Vehicles
27
PHASING SUMMARY
Cycle Time = 80 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Leading Right Turn (phase reduction applied) Movement Class: All Movement Classes Input Sequence: A, B, C, ?, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 13 4 2 19 24 %
B No 19 13 4 2 19 24 %
C No 38 11 4 2 17 21 %
D No 55 19 4 2 25 31 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians
Created: Friday, 22 August 2014 3:36:20 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd www.sidrasolutions.com SIDRA INTERSECTION 6.0.22.4722 Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 9 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Mov ID
Description
P11 P12 P21 P22 P31 P32 P41 P42
South Stage 1 South Stage 2 East Stage 1 East Stage 2 North Stage 1 North Stage 2 West Stage 1 West Stage 2
All Pedestrians
Demand Flow ped/h 20 20 20 20 20 20 20 20
Average Delay sec 30.7 26.4 34.3 31.5 28.9 26.4 34.3 31.5
Level of Service
160
30.5
LOS D
LOS D LOS C LOS D LOS D LOS C LOS C LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Friday, 22 August 2014 3:36:22 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 9 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.88 0.81 0.93 0.89 0.85 0.81 0.93 0.89
Effective Stop Rate per ped 0.88 0.81 0.93 0.89 0.85 0.81 0.93 0.89
0.87
0.87
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Friday, 22 August 2014 3:36:22 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 9 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
14
SITE LAYOUT
28
Site: Intersection 10 AM Reference New Site Signals - Fixed Time
29
MOVEMENT SUMMARY Site: Intersection 10 AM Reference New Site Signals - Fixed Time
Site: Intersection 10 AM Reference New Site Signals - Fixed Time
Cycle Time = 80 seconds (User-Given Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
South: Epping Rd 1 L2 2 T1 Approach
Demand Flows Total HV veh/h %
30
PHASING SUMMARY
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
73 91
9.6 9.9
0.075 0.110
16.2 26.9
LOS B LOS C
1.3 1.4
9.7 10.9
0.48 0.83
0.67 0.62
40.4 33.3
164
9.8
0.110
22.1
LOS C
1.4
10.9
0.67
0.64
36.0
North: Epping Rd 8 T1 9 R2
423 47
9.7 10.6
0.512 0.095
30.0 30.3
LOS C LOS C
7.4 1.4
56.4 10.3
0.93 0.76
0.77 0.71
31.6 31.8
Approach
470
9.8
0.512
30.1
LOS C
7.4
56.4
0.91
0.76
31.6
West: Collector Rd 10 L2 12 R2
21 199
9.5 10.1
0.019 0.437
14.1 35.1
LOS B LOS D
6.6 6.6
50.1 50.3
0.39 0.88
0.62 0.79
39.1 28.8
Approach
220
10.0
0.437
33.1
LOS C
6.6
50.3
0.83
0.78
29.6
All Vehicles
854
9.8
0.512
29.3
LOS C
7.4
56.4
0.84
0.74
31.8
Cycle Time = 80 seconds (User-Given Cycle Time)
Phase times determined by the program Sequence: Leading Right Turn Movement Class: All Movement Classes Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 21 4 2 27 34 %
B No 27 18 4 2 24 30 %
C No 51 23 4 2 29 36 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID P1 P3 P4
Description South Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20
Average Delay sec 34.3 34.3 31.5
Level of Service
60
33.3
LOS D
LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Friday, 22 August 2014 1:51:43 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 10 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Created: Friday, 22 August 2014 3:40:51 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 10 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.93 0.93 0.89
Effective Stop Rate per ped 0.93 0.93 0.89
0.91
0.91
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Friday, 22 August 2014 1:51:43 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 10 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
15
SITE LAYOUT
31
Site: Intersection 11 AM Reference New Site Signals - Fixed Time
32
MOVEMENT SUMMARY Site: Intersection 11 AM Reference
Site: Intersection 11 AM Reference
New Site Signals - Fixed Time Cycle Time = 80 seconds (Practical Cycle Time) Variable Sequence Analysis applied. The results are given for the selected output sequence.
New Site Signals - Fixed Time Cycle Time = 80 seconds (Practical Cycle Time) Variable Sequence Analysis applied. The results are given for the selected output sequence.
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Epping Rd 1 2
L2 T1
33
PHASING SUMMARY
77 36
10.4 11.1
0.079 0.044
16.2 26.3
LOS B LOS C
1.4 1.4
10.4 10.4
0.48 0.81
0.67 0.58
40.4 33.6
Approach
113
10.6
0.079
19.4
LOS B
1.4
10.4
0.59
0.64
37.8
North: Epping Rd 8 T1 9 R2
302 47
9.9 10.6
0.366 0.095
28.9 30.3
LOS C LOS C
5.1 1.4
38.8 10.3
0.89 0.76
0.72 0.71
32.2 31.8
Approach
349
10.0
0.366
29.1
LOS C
5.1
38.8
0.87
0.72
32.2
West: Collector Rd 10 L2 12 R2
30 169
10.0 10.1
0.028 0.372
14.1 34.6
LOS B LOS C
5.5 5.5
41.9 41.9
0.40 0.86
0.62 0.78
39.1 29.0
Approach
199
10.1
0.372
31.5
LOS C
5.5
41.9
0.79
0.76
30.2
All Vehicles
661
10.1
0.372
28.1
LOS C
5.5
41.9
0.80
0.72
32.3
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A No 0 21 4 2 27 34 %
B Yes 27 18 4 2 24 30 %
C No 51 23 4 2 29 36 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID P1 P3 P4
Description South Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20
Average Delay sec 34.3 34.3 31.5
Level of Service
60
33.3
LOS D
LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Friday, 22 August 2014 1:53:25 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 11 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Created: Friday, 22 August 2014 3:42:46 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 11 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.93 0.93 0.89
Effective Stop Rate per ped 0.93 0.93 0.89
0.91
0.91
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Friday, 22 August 2014 1:53:25 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 11 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
16
SITE LAYOUT
34
Site: Intersection 12 AM Reference New Site Signals - Fixed Time
35
MOVEMENT SUMMARY Site: Intersection 12 AM Reference New Site Signals - Fixed Time
Site: Intersection 12 AM Reference New Site Signals - Fixed Time
Cycle Time = 90 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
South: Epping Rd 1 L2 2 T1 3 R2
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
51 51 55
2.0 2.0 9.1
0.039 0.046 0.473
10.3 24.7 55.9
LOS B LOS C LOS E
0.4 2.5 2.5
2.8 17.9 19.0
0.25 0.75 1.00
0.66 0.55 0.75
47.2 34.6 24.5
Approach
157
4.5
0.473
30.9
LOS C
2.5
19.0
0.68
0.65
32.7
East: Summerhill Rd 4 L2 5 T1 6 R2
76 251 51
10.5 10.0 2.0
0.065 0.196 0.193
10.4 30.2 46.3
LOS B LOS C LOS D
0.6 3.0 2.0
4.5 22.7 14.5
0.26 0.84 0.92
0.59 0.66 0.74
47.2 31.7 27.3
Approach
378
9.0
0.196
28.4
LOS C
3.0
22.7
0.73
0.66
33.2
North: Epping Rd 7 L2 8 T1 9 R2
51 117 51
2.0 10.3 2.0
0.039 0.111 0.418
10.5 25.3 55.4
LOS B LOS C LOS E
0.4 2.3 2.3
3.0 17.6 16.5
0.26 0.77 1.00
0.66 0.59 0.74
47.0 34.2 24.6
Approach
219
6.4
0.418
28.9
LOS C
2.3
17.6
0.70
0.64
33.3
West: Summerhill Rd 10 L2 11 T1 12 R2
51 323 157
2.0 9.9 10.2
0.037 0.252 0.628
9.4 30.7 49.9
LOS A LOS C LOS D
0.2 6.8 6.8
1.6 52.0 52.1
0.18 0.86 0.99
0.65 0.68 0.82
48.1 31.5 26.1
531
9.2
0.628
34.3
LOS C
6.8
52.1
0.83
0.72
30.6
1285
8.1
0.628
31.2
LOS C
6.8
52.1
0.76
0.68
32.0
Approach All Vehicles
36
PHASING SUMMARY
Cycle Time = 90 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 6 4 2 12 13 %
B No 12 26 4 2 32 36 %
C No 44 13 4 2 19 21 %
D No 63 21 4 2 27 30 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
P1 P2 P3 P4
South Full Crossing East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Created: Friday, 22 August 2014 3:47:06 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 12 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Demand Flow ped/h 20 20 20 20
Average Delay sec 39.2 39.2 39.2 39.2
Level of Service
80
39.2
LOS D
LOS D LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Friday, 22 August 2014 1:56:01 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 12 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.93 0.93 0.93 0.93
Effective Stop Rate per ped 0.93 0.93 0.93 0.93
0.93
0.93
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Friday, 22 August 2014 1:56:01 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 12 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
17
37
38
39
18
SITE LAYOUT
40
Site: Intersection 14 AM 2046 New Site Signals - Fixed Time
41
MOVEMENT SUMMARY Site: Intersection 14 AM 2046 New Site Signals - Fixed Time
Site: Intersection 14 AM 2046 New Site Signals - Fixed Time
Cycle Time = 90 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Collector Rd 1 3
L2 R2
Approach
107 44
5.6 6.8
0.088 0.086
9.9 29.7
LOS A LOS C
1.6 1.4
11.6 10.4
0.36 0.76
0.63 0.70
49.2 38.8
151
6.0
0.088
15.6
LOS B
1.6
11.6
0.48
0.65
45.6
East: Summerhill Rd 4 L2 5 T1
21 346
4.8 6.1
0.021 0.325
17.0 34.8
LOS B LOS C
0.4 4.5
3.0 33.0
0.48 0.91
0.68 0.72
47.5 45.4
Approach
367
6.0
0.325
33.7
LOS C
4.5
33.0
0.88
0.72
45.5
West: Summerhill Rd 11 T1 12 R2
457 44
5.9 6.8
0.429 0.077
35.6 29.9
LOS D LOS C
6.1 1.3
44.6 9.9
0.93 0.73
0.75 0.72
44.9 40.9
Approach
501
6.0
0.429
35.1
LOS D
6.1
44.6
0.91
0.75
44.5
1019
6.0
0.429
31.7
LOS C
6.1
44.6
0.84
0.72
45.0
All Vehicles
42
PHASING SUMMARY
Cycle Time = 90 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 26 4 2 32 36 %
B No 32 17 4 2 23 26 %
C No 55 29 4 2 35 39 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID Created: Wednesday, 20 August 2014 3:01:21 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 14 2046.sip6 8000907, AECOM, NETWORK / Enterprise
P1 P2 P4
Description South Full Crossing East Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20
Average Delay sec 37.4 39.2 39.2
Level of Service
60
38.6
LOS D
LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 3:01:23 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 14 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.91 0.93 0.93
Effective Stop Rate per ped 0.91 0.93 0.93
0.93
0.93
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 3:01:23 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 14 2046.sip6 8000907, AECOM, NETWORK / Enterprise
19
43
44
45
20
46
47
48
21
49
50
51
22
SITE LAYOUT
52
Site: Intersection 18 AM Reference New Site Signals - Fixed Time
53
MOVEMENT SUMMARY Site: Intersection 18 AM Reference New Site Signals - Fixed Time
Site: Intersection 18 AM Reference New Site Signals - Fixed Time
Cycle Time = 100 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Koukoura Dr 2 3
T1 R2
Approach
54
PHASING SUMMARY
620 56
6.0 5.4
0.367 0.120
29.8 37.7
LOS C LOS D
8.0 2.1
58.6 15.3
0.83 0.80
0.69 0.74
48.4 37.6
676
5.9
0.367
30.4
LOS C
8.0
58.6
0.83
0.70
47.3
East: Collector Rd 4 L2 6 R2
129 69
6.2 5.8
0.125 0.149
14.7 35.4
LOS B LOS D
2.8 2.6
20.6 19.1
0.48 0.81
0.67 0.73
46.1 36.8
Approach
198
6.1
0.149
21.9
LOS C
2.8
20.6
0.59
0.69
42.3
North: Koukoura Dr 7 L2 8 T1
188 1344
64.4 4.8
0.181 0.817
9.0 39.6
LOS A LOS D
0.9 22.9
9.5 166.9
0.18 0.98
0.64 0.93
53.6 42.8
Approach
1532
12.1
0.817
35.8
LOS D
22.9
166.9
0.88
0.89
43.9
All Vehicles
2406
9.9
0.817
33.2
LOS C
22.9
166.9
0.84
0.82
44.7
Cycle Time = 100 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C Output Sequence: A, B, C Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 26 4 2 32 32 %
B No 32 30 4 2 36 36 %
C No 68 26 4 2 32 32 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID P1 P2 P3
Description South Full Crossing East Full Crossing North Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20
Average Delay sec 44.2 31.2 44.2
Level of Service
60
39.9
LOS D
LOS E LOS D LOS E
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.0 0.0 0.1 0.1
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 3:03:14 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 18 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Created: Wednesday, 20 August 2014 3:03:12 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 18 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.94 0.79 0.94
Effective Stop Rate per ped 0.94 0.79 0.94
0.89
0.89
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 3:03:14 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 18 2046.sip6 8000907, AECOM, NETWORK / Enterprise
23
SITE LAYOUT
55
Site: Intersection 19 AM Reference New Site Signals - Fixed Time
56
MOVEMENT SUMMARY Site: Intersection 19 AM Reference New Site Signals - Fixed Time
Site: Intersection 19 AM Reference New Site Signals - Fixed Time
Cycle Time = 105 seconds (User-Given Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Koukoura Rd 2 3
T1 R2
Approach East: Collector Rd 4 L2 6 R2
628 61
6.1 6.6
0.366 0.124
30.8 37.8
LOS C LOS D
8.4 2.3
61.9 17.3
0.83 0.78
0.69 0.74
47.7 37.6
689
6.1
0.366
31.4
LOS C
8.4
61.9
0.83
0.70
46.6
56 48
5.4 6.3
0.054 0.109
14.6 37.5
LOS B LOS D
1.2 1.9
8.9 14.0
0.45 0.81
0.64 0.71
46.3 35.9
104
5.8
0.109
25.2
LOS C
1.9
14.0
0.62
0.68
40.8
North: Koukoura Rd 7 L2 8 T1
37 1449
5.4 5.9
0.034 0.851
15.6 44.4
LOS B LOS D
0.7 26.5
5.4 194.5
0.42 1.00
0.69 0.98
48.4 40.5
Approach
1486
5.9
0.851
43.7
LOS D
26.5
194.5
0.98
0.97
40.7
All Vehicles
2279
5.9
0.851
39.1
LOS D
26.5
194.5
0.92
0.87
42.3
Approach
57
PHASING SUMMARY
Cycle Time = 105 seconds (User-Given Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, D Output Sequence: A, B, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 26 4 2 32 30 %
B No 32 32 4 2 38 36 %
D No 70 29 4 2 35 33 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID P1 P2 P3
Description South Full Crossing East Full Crossing North Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20
Average Delay sec 46.7 32.0 46.7
Level of Service
60
41.8
LOS E
LOS E LOS D LOS E
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.0 0.0 0.1 0.1
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 3:20:05 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 19 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Created: Wednesday, 20 August 2014 3:20:03 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 19 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.94 0.78 0.94
Effective Stop Rate per ped 0.94 0.78 0.94
0.89
0.89
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 3:20:05 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 19 2046.sip6 8000907, AECOM, NETWORK / Enterprise
24
SITE LAYOUT
58
Site: Intersection 20 AM Reference New Site Signals - Fixed Time
59
MOVEMENT SUMMARY Site: Intersection 20 AM Reference New Site Signals - Fixed Time
Site: Intersection 20 AM Reference New Site Signals - Fixed Time
Cycle Time = 110 seconds (User-Given Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Koukoura Dr 1 2 3
L2 T1 R2
44 451 320
6.8 6.0 5.3
0.088 0.678 0.757
23.3 52.9 62.6
LOS C LOS D LOS E
1.0 8.2 9.0
7.3 60.0 65.8
0.77 1.00 1.00
0.72 0.83 0.87
43.9 37.2 31.4
Approach
815
5.8
0.757
55.1
LOS E
9.0
65.8
0.99
0.84
35.0
East: Boundary Rd 4 L2 5 T1 6 R2
274 51 147
5.8 5.9 6.1
0.735 0.089 0.395
51.9 39.0 46.6
LOS D LOS D LOS D
14.4 1.5 6.9
105.9 11.1 50.9
0.99 0.83 0.91
0.87 0.64 0.79
33.2 34.8 35.2
Approach
472
5.9
0.735
48.8
LOS D
14.4
105.9
0.95
0.82
33.9
North: Koukoura Dr 7 L2 8 T1 9 R2
218 1209 78
6.0 5.8 6.4
0.421 0.762 0.151
41.1 40.0 38.2
LOS D LOS D LOS D
9.5 21.2 3.1
69.9 155.4 22.9
0.86 0.96 0.78
0.81 0.87 0.75
38.0 42.8 37.4
Approach
1505
5.8
0.762
40.0
LOS D
21.2
155.4
0.94
0.85
41.7
91 84 96
5.5 6.0 6.3
0.523 0.523 0.330
48.6 44.5 49.2
LOS D LOS D LOS D
8.6 8.6 4.7
63.3 63.3 34.3
0.95 0.95 0.93
0.80 0.80 0.77
33.1 32.4 32.5
271
5.9
0.523
47.5
LOS D
8.6
63.3
0.94
0.79
32.7
3063
5.8
0.762
46.1
LOS D
21.2
155.4
0.95
0.84
37.6
West: Boundary Rd 10 L2 11 T1 12 R2 Approach All Vehicles
60
PHASING SUMMARY
Cycle Time = 110 seconds (User-Given Cycle Time)
Phase times determined by the program Sequence: Split Phasing Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 13 4 2 19 17 %
B No 19 32 4 2 38 35 %
C No 57 18 4 2 24 22 %
D No 81 23 4 2 29 26 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians
Created: Wednesday, 20 August 2014 3:30:00 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 20 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Mov ID
Description
P11 P12 P21 P22 P31 P32 P41 P42
South Stage 1 South Stage 2 East Stage 1 East Stage 2 North Stage 1 North Stage 2 West Stage 1 West Stage 2
All Pedestrians
Demand Flow ped/h 20 20 20 20 20 20 20 20
Average Delay sec 47.3 40.2 34.4 30.6 49.2 44.6 46.4 46.4
Level of Service
160
42.4
LOS E
LOS E LOS E LOS D LOS D LOS E LOS E LOS E LOS E
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 3:30:01 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 20 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.93 0.86 0.79 0.75 0.95 0.90 0.92 0.92
Effective Stop Rate per ped 0.93 0.86 0.79 0.75 0.95 0.90 0.92 0.92
0.88
0.88
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 3:30:01 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 20 2046.sip6 8000907, AECOM, NETWORK / Enterprise
25
61
62
63
26
64
65
MOVEMENT SUMMARY
Site: Intersection 22 AM Reference
Site: Intersection 22 AM Reference New Site Signals - Fixed Time
New Site Signals - Fixed Time
Cycle Time = 80 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
South: Collector Rd 1 L2 2 T1 3 R2
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
69 43 21
5.8 7.0 4.8
0.197 0.197 0.117
24.6 21.7 40.3
LOS C LOS C LOS D
3.2 3.2 0.8
23.4 23.4 5.7
0.76 0.76 0.94
0.69 0.69 0.69
36.0 34.6 31.0
Approach
133
6.0
0.197
26.1
LOS C
3.2
23.4
0.79
0.69
34.7
East: Boundary Rd 4 L2 5 T1 6 R2
51 289 156
2.0 5.9 5.8
0.139 0.385 0.389
34.5 30.7 20.9
LOS C LOS C LOS C
1.7 5.0 3.0
11.9 37.0 22.1
0.86 0.91 0.89
0.73 0.73 0.78
33.2 39.9 41.3
Approach
496
5.4
0.389
28.0
LOS C
5.0
37.0
0.90
0.75
39.5
North: Collector Rd 7 L2 8 T1 9 R2
191 129 45
5.8 2.3 6.7
0.561 0.561 0.254
29.7 26.5 42.5
LOS C LOS C LOS D
10.6 10.6 1.7
76.9 76.9 12.7
0.89 0.89 0.96
0.80 0.80 0.73
37.5 33.1 32.9
Approach
365
4.7
0.561
30.1
LOS C
10.6
76.9
0.90
0.79
35.3
West: Boundary Rd 10 L2 11 T1 12 R2
29 441 235
6.9 5.9 3.8
0.082 0.587 0.578
34.1 32.2 21.6
LOS C LOS C LOS C
0.9 8.1 4.8
6.9 59.3 34.5
0.84 0.96 0.94
0.71 0.79 0.81
35.9 39.2 37.6
705
5.2
0.587
28.8
LOS C
8.1
59.3
0.95
0.79
38.5
1699
5.2
0.587
28.6
LOS C
10.6
76.9
0.91
0.77
37.7
Approach All Vehicles
66
PHASING SUMMARY Cycle Time = 80 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 8 4 2 14 18 %
B No 14 22 4 2 28 35 %
C No 42 10 4 2 16 20 %
D No 58 16 4 2 22 28 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
P1 P2 P3 P4
South Full Crossing East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 50 50 50 50
Average Delay sec 33.4 35.2 33.4 35.2
Level of Service
200
34.3
LOS D
LOS D LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 27 August 2014 1:00:13 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 22 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.91 0.94 0.91 0.94
Effective Stop Rate per ped 0.91 0.94 0.91 0.94
0.93
0.93
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 27 August 2014 1:00:13 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 22 2046.sip6 8000907, AECOM, NETWORK / Enterprise
27
67
68
Site: Intersection 23 AM Reference
MOVEMENT SUMMARY
New Site Signals - Fixed Time
Site: Intersection 23 AM Reference New Site Signals - Fixed Time
OD Mov
Cycle Time = 80 seconds (Practical Cycle Time)
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Collector Rd 1 L2 3 R2
106 107
5.7 5.6
0.095 0.228
11.0 29.9
LOS B LOS C
1.6 3.3
11.9 24.4
0.42 0.82
0.65 0.75
45.7 37.0
Approach
213
5.6
0.228
20.5
LOS C
3.3
24.4
0.62
0.70
40.8
East: Boundary Rd 4 L2 5 T1
361 340
4.4 5.9
0.356 0.402
15.9 29.1
LOS B LOS C
7.7 5.8
55.8 42.6
0.59 0.90
0.75 0.73
43.8 40.6
Approach
701
5.1
0.402
22.3
LOS C
7.7
55.8
0.74
0.74
42.1
West: Boundary Rd 11 T1 12 R2
472 161
5.9 6.2
0.559 0.315
30.4 30.0
LOS C LOS C
8.4 5.0
61.7 36.9
0.94 0.83
0.78 0.78
40.0 37.4
Approach
633
6.0
0.559
30.3
LOS C
8.4
61.7
0.91
0.78
39.3
1547
5.6
0.559
25.3
LOS C
8.4
61.7
0.79
0.75
40.8
All Vehicles
Cycle Time = 80 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C Output Sequence: A, B, C
Movement Performance - Vehicles Mov ID
69
PHASING SUMMARY
Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 21 4 2 27 34 %
B No 27 18 4 2 24 30 %
C No 51 23 4 2 29 36 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
P1 P2 P4
South Full Crossing East Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 50 50 50
Average Delay sec 31.6 34.3 34.3
150
33.4
Level of Average Back of Queue Service Pedestrian Distance ped m LOS D 0.1 0.1 LOS D 0.1 0.1 LOS D 0.1 0.1 LOS D
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 27 August 2014 1:05:56 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 23 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.89 0.93 0.93
Effective Stop Rate per ped 0.89 0.93 0.93
0.91
0.91
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 27 August 2014 1:05:56 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 23 2046.sip6 8000907, AECOM, NETWORK / Enterprise
28
SITE LAYOUT
70
Site: Intersection 24 AM Reference New Site Signals - Fixed Time
71
MOVEMENT SUMMARY Site: Intersection 24 AM Reference New Site Signals - Fixed Time
Site: Intersection 24 AM Reference New Site Signals - Fixed Time
Cycle Time = 80 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
East: Boundary Rd 5 6
T1 R2
418 27
6.0 7.4
0.495 0.053
29.9 27.9
LOS C LOS C
7.3 0.8
53.7 5.7
0.92 0.75
0.76 0.70
40.2 38.2
Approach
445
6.1
0.495
29.7
LOS C
7.3
53.7
0.91
0.76
40.1
North: Bodycoats Rd 7 L2 9 R2
76 187
6.6 5.9
0.069 0.400
10.8 31.3
LOS B LOS C
1.1 6.1
8.5 45.2
0.41 0.87
0.64 0.78
45.7 36.4
Approach
263
6.1
0.400
25.4
LOS C
6.1
45.2
0.74
0.74
38.7
West: Boundary Rd 10 L2 11 T1
61 514
6.6 6.0
0.061 0.609
14.0 30.8
LOS B LOS C
1.1 9.3
7.9 68.2
0.48 0.95
0.67 0.79
44.7 39.8
Approach
575
6.1
0.609
29.0
LOS C
9.3
68.2
0.90
0.78
40.3
1283
6.1
0.609
28.5
LOS C
9.3
68.2
0.87
0.76
39.9
All Vehicles
72
PHASING SUMMARY
Cycle Time = 80 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, D Output Sequence: A, B, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 21 4 2 27 34 %
B No 27 18 4 2 24 30 %
D No 51 23 4 2 29 36 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Created: Wednesday, 20 August 2014 4:31:14 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 24 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Movement Performance - Pedestrians Mov ID P2 P3 P4
Description East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Demand Flow ped/h 20 20 20
Average Delay sec 34.3 31.5 34.3
Level of Service
60
33.3
LOS D
LOS D LOS D LOS D
Average Back of Queue Pedestrian Distance ped m 0.0 0.0 0.0 0.0 0.0 0.0
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 3:39:12 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 24 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.93 0.89 0.93
Effective Stop Rate per ped 0.93 0.89 0.93
0.91
0.91
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 3:39:12 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 24 2046.sip6 8000907, AECOM, NETWORK / Enterprise
29
73
74
75
30
76
77
78
31
79
80
81
32
SITE LAYOUT
82
Site: Intersection 29 AM Reference New Site Signals - Fixed Time
83
MOVEMENT SUMMARY Site: Intersection 29 AM Reference New Site Signals - Fixed Time
Site: Intersection 29 AM Reference New Site Signals - Fixed Time
Cycle Time = 70 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Collector Rd 1 2 3
L2 T1 R2
20 48 20
0.0 0.0 0.0
0.014 0.091 0.126
3.9 21.6 37.2
LOS A LOS C LOS D
0.1 1.2 0.7
0.6 8.6 4.7
0.21 0.78 0.95
0.47 0.64 0.69
42.3 35.5 30.4
Approach
88
0.0
0.126
21.2
LOS C
1.2
8.6
0.69
0.62
35.4
East: Collector Rd 4 L2 5 T1 6 R2
20 52 29
0.0 0.0 0.0
0.028 0.124 0.182
18.8 24.4 38.7
LOS B LOS C LOS D
0.4 1.5 1.0
2.9 10.2 6.9
0.64 0.84 0.96
0.65 0.64 0.71
36.3 37.5 32.4
Approach
101
0.0
0.182
27.4
LOS C
1.5
10.2
0.84
0.66
35.7
North: Collector Rd 7 L2 8 T1 9 R2
139 124 20
0.0 0.0 0.0
0.460 0.460 0.126
25.7 22.4 38.4
LOS C LOS C LOS D
7.4 7.4 0.7
51.5 51.5 4.7
0.85 0.85 0.95
0.77 0.77 0.69
37.3 34.4 32.4
Approach
283
0.0
0.460
25.2
LOS C
7.4
51.5
0.86
0.77
35.6
20 31 20
0.0 0.0 0.0
0.115 0.115 0.126
27.2 22.6 38.4
LOS C LOS C LOS D
1.4 1.4 0.7
9.7 9.7 4.7
0.81 0.81 0.95
0.66 0.66 0.69
37.2 37.5 30.5
West: Collector Rd 10 L2 11 T1 12 R2 Approach All Vehicles
84
PHASING SUMMARY
71
0.0
0.126
28.3
LOS C
1.4
9.7
0.85
0.67
35.1
543
0.0
0.460
25.3
LOS C
7.4
51.5
0.83
0.71
35.5
Cycle Time = 70 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 6 4 2 12 17 %
B No 12 19 4 2 25 36 %
C No 37 6 4 2 12 17 %
D No 49 15 4 2 21 30 %
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
P1 P2 P3 P4
South Full Crossing East Full Crossing North Full Crossing West Full Crossing
All Pedestrians
Created: Wednesday, 20 August 2014 3:41:45 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 29 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Demand Flow ped/h 50 50 50 50
Average Delay sec 29.3 28.4 29.3 25.8
Level of Service
200
28.2
LOS C
LOS C LOS C LOS C LOS C
Average Back of Queue Pedestrian Distance ped m 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Wednesday, 20 August 2014 3:41:46 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 29 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued 0.92 0.90 0.92 0.86
Effective Stop Rate per ped 0.92 0.90 0.92 0.86
0.90
0.90
Normal Movement
Permitted/Opposed
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 3:41:46 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 29 2046.sip6 8000907, AECOM, NETWORK / Enterprise
33
85
86
87
34
88
89
90
TO WALLAN
Reference Case Design Year Scenario: PM Peak - Intersection Turn Movement Analysis Summary (Total LV and HV Vehicles)
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
L
188
983
T S
E
W
L #N/A T #N/A R #N/A
50
#N/A
R
L
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
E
W
KOUKOURA DRIVE
T S
#N/A
R
L
R #N/A
W
L #N/A W T #N/A R #N/A
#N/A R #N/A T #N/A L
E
W
L
T S
R #N/A
N T L #N/A #N/A
#N/A
#N/A #N/A
#N/A R #N/A T E #N/A L
R
L
T S
W
E
R #N/A
#N/A #N/A #N/A
T S
R
W
94 72 49
20 112
L
889
T S
N R T L #N/A #N/A #N/A
R T E L
392
R
L #N/A W T #N/A R #N/A
N R T L #N/A #N/A #N/A #N/A R L #N/A #N/A T E WT #N/A R #N/A #N/A L
#N/A #N/A #N/A
L
T S
L
L WT R
R 206 220 860 179
T S
N T 44
6 139
L
37
T S
135
R
R #N/A
21
R T L
E
W
L
213 R 916 T 125 L
E
L 566 W T 366 R 172
R 272
T S
R
N T 426
L 106
5 249
L
864
T S
E
W
50
R
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
R
L #N/A W T #N/A R #N/A
L
R
#N/A R #N/A T E #N/A L
L
T S
R
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
#N/A #N/A #N/A
#N/A #N/A
T S
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
R
L
#N/A R #N/A T E #N/A L
L
S
T S
L #N/A W T #N/A R #N/A
T S
T S
L #N/A W T #N/A R #N/A
E
Education Facility
R
R
#N/A
E
R 27
L 20 T 403 R 52
R
N T 115
L 62
4 L
46
176
T S
119 R 761 T E 123 L
155
R
#N/A #N/A #N/A
T S
L WT R
N T 73
R 117 124 447 50
L 108
3 L
83
T S
72
R
45
169 R 803 T 61 L
E
CRAIGIEBURN ROAD
L #N/A W T #N/A R #N/A
R
L #N/A W T #N/A R #N/A L
T S
L
#N/A #N/A #N/A
T S
R
#N/A R #N/A T E #N/A L
L WT R
R 423
N T 525
254 320 222
L 81
1 387
L
1139
T S
R
52
TO EPPING
Four traffic lane Arterial Road (two lanes in each direction) Two traffic lane Arterial Road (one lane in each direction) Two traffic lane Collector Road (one lane in each direction) Bus Priority Routes (different colour represent different bus services) West Approach - Left Turn West Approach - Through West Approach - Right Turn
North Approach - Through
Six traffic lane Arterial Road (three lanes in each direction)
North Approach - Left Turn
North Approach - Right Turn
Intersection with 20 pedestrians at each approach
292 1040 96 398 308 192
82 East Approach - Right Turn 500 East Approach - Through 0 East Approach - Left Turn
5 143
308
0
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
R
LEGEND Intersection with 50 pedestrians at each approach
N R T L #N/A #N/A #N/A #N/A R L #N/A #N/A T E W T #N/A R #N/A #N/A L
#N/A #N/A #N/A
R
N R T L #N/A #N/A #N/A
L
T S
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L
823
R
#N/A R #N/A T E #N/A L
L
#N/A #N/A #N/A
R
425
T S
N R T L #N/A #N/A #N/A
R
L #N/A W T #N/A R #N/A
#N/A #N/A
T S
T S
185 R 519 T E 608 L
L #N/A W T #N/A R #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
T S
L
#N/A R #N/A T E #N/A L
L
L 125
9 188
R
N R T L #N/A #N/A #N/A
R
N T 123
50 591 84
N R T L #N/A #N/A #N/A
#N/A R #N/A T #N/A L
L
L WT R
Education Facility
N R T L #N/A #N/A #N/A
R
T S
L #N/A W T #N/A R #N/A
#N/A #N/A #N/A
T S
#N/A R #N/A T E #N/A L
L
#N/A R #N/A T E #N/A L
L
R 50
#N/A #N/A #N/A
R
N R T L #N/A #N/A #N/A #N/A R #N/A T #N/A L
L
N R T L #N/A #N/A #N/A
#N/A #N/A #N/A
L TROAD R BOUNDARY
#N/A #N/A #N/A
R
#N/A #N/A #N/A
T S
W
N R T L #N/A #N/A #N/A #N/A R L #N/A #N/A T E W T #N/A R #N/A #N/A L
#N/A #N/A #N/A #N/A
R
#N/A R L #N/A #N/A T E WT #N/A R #N/A #N/A L
L
E
L T R
N T L #N/A #N/A
#N/A R #N/A T E #N/A L
L
100 R 733 T 50 L
N T L #N/A #N/A
L #N/A T #N/A R #N/A
167 1181 183
R
L 110
L 51 49 46 59
T S
L #N/A W T #N/A R #N/A
ANDREW ROAD
#N/A #N/A #N/A
L
N T 626
#N/A R #N/A T E #N/A L
79
R
N R T L #N/A #N/A #N/A
N R T L #N/A #N/A #N/A
N R T L #N/A #N/A #N/A
EDGARS ROAD
E
T S
L #N/A W T #N/A R #N/A
L 164 W T 62 R 119
T S
#N/A R L #N/A #N/A T E WT #N/A R #N/A #N/A L
N R T L #N/A #N/A #N/A
R 151 #N/A R #N/A T #N/A L
#N/A R #N/A T #N/A L
Major Town Centre, and Community Centre
N R T L #N/A #N/A #N/A
L
KOUKOURA DRIVE
N R T L #N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A
R #N/A
#N/A #N/A #N/A
R
#N/A #N/A #N/A
L WT R
#N/A
#N/A #N/A #N/A
222
T S
R
L #N/A W T #N/A R #N/A
Town Centre, Community Centre and Education Facility
R
N T L #N/A #N/A
T S
50 R 354 T E 52 L
#N/A #N/A
T S
L 163 186 104 237
T S
R #N/A
L
#N/A #N/A #N/A
L
L 50
12 54
R
#N/A R #N/A T E #N/A L
#N/A R #N/A T E #N/A L
L
TRAIN STATION
W
L T R
#N/A #N/A
50 266 37
#N/A R #N/A T E #N/A L #N/A
R 99
L T R
N T L #N/A #N/A
L #N/A T #N/A R #N/A L
N T 543
#N/A
T S
L #N/A W T #N/A R #N/A
R
N T L #N/A #N/A
L WT R
N R T L #N/A #N/A #N/A
#N/A #N/A
T S
R #N/A
L
W #N/A R #N/A T #N/A L
N T L #N/A #N/A
#N/A #N/A #N/A
R
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
L T R
L
N T 50
R 50 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
R
#N/A R #N/A T E #N/A L #N/A
R
L #N/A W T #N/A R #N/A
#N/A #N/A
T S
#N/A #N/A #N/A
#N/A #N/A
T S
L #N/A T #N/A R #N/A
#N/A #N/A #N/A
L
L T R
Town Centre, Community Centre and Education Facility
N R T L #N/A #N/A #N/A
L
#N/A
N T L #N/A #N/A
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L
#N/A R #N/A T E #N/A L
N T L #N/A #N/A
#N/A #N/A #N/A
R
L #N/A T #N/A R #N/A
#N/A #N/A #N/A
L
W
L T R
#N/A #N/A
T S
R #N/A #N/A R #N/A T #N/A L
R #N/A
#N/A R #N/A T E #N/A L
T S
R
EPPING ROAD
15 L
SUMMERHILL ROAD 111 R 385 T 50 L
R
EPPING ROAD
N L 165
ANDREW ROAD
N T 673
BODYCOATS ROAD
R 85
L 464 W T 327 R 230
T S
78 R 398 T E 45 L
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
South Approach - Left Turn
South Approach - Through
South Approach - Right Turn
TO WALLAN
Reference Case Design Year Scenario: PM Peak - Intersection Turn Movement Analysis Summary (Light Vehicle)
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
L
L
924
T S
E
W
L #N/A T #N/A R #N/A
#N/A R #N/A T E #N/A L
1
#N/A
R
L
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
E
W
KOUKOURA DRIVE
L
T S
R
L
W
L
E
W
T L #N/A #N/A #N/A R #N/A T E #N/A L
#N/A
R
L
W
R
L #N/A W T #N/A R #N/A
#N/A R #N/A T #N/A L
E
R #N/A
#N/A #N/A #N/A
L
T S
R
W
#N/A
L T R
W
88 67 46 106
L
836
T S
N R T L #N/A #N/A #N/A 175 R 98 T E 223 L
L #N/A W T #N/A R #N/A
368
R
KOUKOURA DRIVE
#N/A #N/A #N/A
#N/A #N/A #N/A
L
L
T S
R
N R T L #N/A #N/A #N/A
#N/A ### ###
L
R 194
L WT R
206 809 168
T S
L
N T L 41 103
L
35 126
T S
R 256 201 R 861 T 118 L
6 130
R
21 157 1110
R
E
L 48
T S
L
W
#N/A
L
E
W
L 15 T 379 R 49
N T 109
R
T S
E
W
T S
R
L #N/A W T #N/A R #N/A
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
#N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
T S
L
L
R
N T L #N/A #N/A
L #N/A T #N/A R #N/A
N R T L #N/A #N/A #N/A
L #N/A #N/A R #N/A T E W T #N/A R #N/A #N/A L #N/A
R
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
#N/A #N/A
L T R BOUNDARY SROAD
T S
R
#N/A #N/A #N/A
L
L
T S
R
T S
#N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
T S
#N/A #N/A #N/A
L
L
T S
R
Education Facility
43
L
165
T S
R
R
L #N/A W T #N/A R #N/A
L
383
167 R 467 T E 547 L
T S
741
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
L
L
L
T S
R
T S
R
L #N/A W T #N/A R #N/A
E
L 112
9 169
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
N T 111
9 532 76
N R T L #N/A #N/A #N/A
#N/A R #N/A T #N/A L
T S
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
N R T L #N/A #N/A #N/A
L #N/A #N/A R #N/A T E W T #N/A R #N/A #N/A L
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
L
L
L
L
T S
R
T S
R
T S
R
N T 68
L 116 WT 420 R 47
159 R 755 T 58 L
3 78
L
68
T S
N R T L #N/A #N/A #N/A
L 102
42
R
L #N/A W T #N/A R #N/A
E
CRAIGIEBURN ROAD
R 381 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
L
T S
R
T S
R
L WT R
N T 472
229 288 200
North Approach - Through
Intersection with 20 pedestrians at each approach
North Approach - Left Turn
North Approach - Right Turn
Intersection with 50 pedestrians at each approach
292 1040 96 West Approach - Left Turn West Approach - Through West Approach - Right Turn
Six traffic lane Arterial Road (three lanes in each direction)
Bus Priority Routes (different colour represent different bus services)
0 South Approach - Right Turn
Two traffic lane Collector Road (one lane in each direction)
143 308 South Approach - Through
Two traffic lane Arterial Road (one lane in each direction)
82 East Approach - Right Turn 500 East Approach - Through 0 East Approach - Left Turn
5 South Approach - Left Turn
Four traffic lane Arterial Road (two lanes in each direction)
398 308 192
R
348
L
1025
T S
#N/A #N/A #N/A 70 R 358 T E 40 L
47
R
TO EPPING
A minimum total vehicle of 50 vehicles (LV + HV). If the total volumes less than 50 vehicles, an additional LV of up to 50 will be added to the turn movement to meet the minimum total vehicles. eg. 3 input = 50 total volumes (LV & HV)
T S
L 73
1
LEGEND A minimum total vehicle of 20 vehicles (LV + HV). If the total volumes less than 20 vehicles, an additional LV of up to 20 will be added to the turn movement to meet the minimum total vehicles. eg. 3 input = 20 total volumes (LV & HV)
#N/A R #N/A T E #N/A L
L
146
R
T S
L WT R
Education Facility
N R T L #N/A #N/A #N/A
R 110 112 R 715 T E 115 L
R 1 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
L #N/A W T #N/A R #N/A
E
R
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
N R T L #N/A #N/A #N/A
N R T L #N/A #N/A #N/A #N/A R #N/A T #N/A L
#N/A #N/A #N/A
L 58
4
0
R
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
#N/A #N/A
T S
R 25 94 R 689 T 0 L
R
N T L #N/A #N/A
#N/A R #N/A T E #N/A L
L 100
812
T S
E
N T L #N/A #N/A
L #N/A T #N/A R #N/A
172
5 234
R T L
R
N T 400
L 532 W T 344 R 162
R #N/A 46 43 55
T S
T S
ANDREW ROAD
E
N T 589
#N/A R #N/A T E #N/A L
L
N R T L #N/A #N/A #N/A
N R T L #N/A #N/A #N/A
L 154 W T 58 R 112
L #N/A W T #N/A R #N/A
L
R
Major Town Centre, and Community Centre
L #N/A W T #N/A R #N/A R 142
#N/A R #N/A T #N/A L
#N/A #N/A #N/A
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
#N/A R #N/A T E #N/A L
R #N/A #N/A R #N/A T #N/A L
EDGARS ROAD
R T L #N/A ### ###
L WT R
N R T L #N/A #N/A #N/A
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
L #N/A W T #N/A R #N/A
Town Centre, Community Centre and N Education Facility
R
R
L 153
20
T S
#N/A #N/A
T S
TRAIN STATION
R 93
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
3 R 322 T E 47 L 71
#N/A R #N/A T E #N/A L
L N T 510
L
200
T S
#N/A #N/A
#N/A
48
R
L 1
12
#N/A #N/A #N/A
#N/A
L
3 240 33
#N/A #N/A #N/A
L #N/A T #N/A R #N/A
N T L #N/A #N/A
L #N/A T #N/A R #N/A
T S
L WT R
#N/A #N/A
N T L #N/A #N/A
R #N/A
W
N T L #N/A #N/A
R #N/A
L
N R T L #N/A #N/A #N/A
L
L #N/A T #N/A R #N/A
#N/A #N/A
T S
T S
R
R 3 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A R #N/A T E #N/A L #N/A
R
L #N/A T #N/A R #N/A
#N/A #N/A #N/A
T S
R #N/A
L #N/A W T #N/A R #N/A
#N/A #N/A
L #N/A T #N/A R #N/A
#N/A #N/A
T S
R #N/A #N/A R #N/A T #N/A L
L
N T L #N/A #N/A
Town Centre, Community Centre and Education Facility N
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
L
#N/A R #N/A T E #N/A L #N/A
#N/A R #N/A T E #N/A L #N/A
R
L #N/A T #N/A R #N/A
#N/A #N/A #N/A
L #N/A T #N/A R #N/A
#N/A #N/A
T S
R #N/A #N/A R #N/A T #N/A L
W
R N T 8
EPPING ROAD
177
R #N/A
SUMMERHILL ROAD 104 R 362 T 3 L
T S
N R T L #N/A #N/A #N/A
ANDREW ROAD
L 155
15
N T L #N/A #N/A
EPPING ROAD
N
BODYCOATS
R 80
L 439 W T 307 R 216
N T 633
#N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
TO WALLAN
Reference Case Design Year Scenario: PM Peak - Intersection Turn Movement Analysis Summary (Heavy Vehicle)
N R T L #N/A #N/A #N/A
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
L
L
59
T S
#N/A
R
L
N R T L #N/A #N/A #N/A
KOUKOURA DRIVE
L
T S
#N/A
R
L
N R T L #N/A #N/A #N/A
N T L #N/A #N/A
R #N/A
W
L
N T L #N/A #N/A
L #N/A W T #N/A R #N/A
E
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A
R
L
W
R
W #N/A R #N/A T #N/A L
E
R #N/A
L #N/A W T #N/A R #N/A
#N/A #N/A #N/A
L
T S
R
#N/A
L T R
W
6 4 3
20 7
L
10 4 7
T S
L WT R
13 52 11
L
L 7 13 55 8
6 8
L
2
T S
R T E L
L WT R
71
T S
N T 26
15
52
T S
N T L #N/A #N/A
L #N/A W T #N/A R #N/A
E
#N/A
L
L 6
R T L
L WT R
E
1 24 3
R
N T 7
#N/A #N/A #N/A
#N/A #N/A #N/A
L
L
T S
R
Major Town Centre, and Community Centre L
N R T #N/A #N/A #N/A
T S
T S
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
T S
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
#N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
T S
L
L
R
N R T L #N/A #N/A #N/A
L #N/A #N/A R #N/A T E W T #N/A R #N/A #N/A L #N/A
L
T S
R
L
T S
T S
R
#N/A #N/A #N/A
T
L
L
R
T S
R
L #N/A W T #N/A R #N/A
Education Facility
3
L
T S
R T E L
1 59 8 19
R
L
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
43
19 R 52 T E 61 L
T S
82
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
L
L
L
T S
R
T S
R
L #N/A W T #N/A R #N/A
E
L 12
9
N R T L #N/A #N/A #N/A
#N/A R #N/A T #N/A L
T S
R
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
N R T L #N/A #N/A #N/A
L #N/A #N/A R #N/A T E W T #N/A R #N/A #N/A L
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
L
L
L
L
L
T S
R
T S
R
N T 4
L WT R
7 27 3
L 7 10 48 4
3 5
L
4
T S
3
R
R T L
E
CRAIGIEBURN ROAD
T S
R
T S
R
N R T L #N/A #N/A #N/A
R 42
N T 52
39
114
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L
L WT R
25 32 22
L
T S
R
L
T S
5
R
TO EPPING
Two traffic lane Collector Road (one lane in each direction)
Bus Priority Routes (different colour represent different bus services) 19 66 West Approach - Left Turn 25 West Approach - Through 20 5 West Approach - Right Turn 12 9 20
6 5 32 0 0
South Approach - Through
South Approach - Right Turn
South Approach - Left Turn
Heavy Vehicle Assumptions: 10% of LV are HV on Epping Road applied on all approaches 6% of LV are HV on all other roads applied on all approaches
North Approach - Left Turn
Two traffic lane Arterial Road (one lane in each direction)
North Approach - Through
Six traffic lane Arterial Road (three lanes in each direction) Four traffic lane Arterial Road (two lanes in each direction)
North Approach - Right Turn
Intersection with 20 pedestrians at each approach
East Approach - Right Turn East Approach - Through East Approach - Left Turn
R
N R T L #N/A #N/A #N/A 8 R 40 T E 4 L
1
#N/A #N/A #N/A
T S
L 8
LEGEND Intersection with 50 pedestrians at each approach
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
9
R
L WT R
Education Facility
N R T L #N/A #N/A #N/A
R 7 7 46 7
11
T S
N T 12
R 0 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
E
R
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
L #N/A W T #N/A R #N/A
N R T L #N/A #N/A #N/A #N/A R #N/A T #N/A L
L
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
#N/A #N/A
N R T L #N/A #N/A #N/A
#N/A #N/A #N/A
R
W
N T L #N/A #N/A
L #N/A T #N/A R #N/A
BOUNDARY ROAD S
#N/A #N/A #N/A
T S
E
R
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
L 4
4
0
R
R
N T L #N/A #N/A
#N/A #N/A
T S
R 2 6 44 0
R T E L L
#N/A R #N/A T E #N/A L
11
5 L
R T L
R
R 16 34 22 10
8
R
R #N/A
21 10
R
N T 3
R 12
R
L 3 3 3 4
L #N/A W T #N/A R #N/A
L
R
T S
R #N/A #N/A R #N/A T #N/A L
EDGARS ROAD
L WT R
#N/A #N/A #N/A
L
24
L #N/A W T #N/A R #N/A N T 38
N R T L #N/A #N/A #N/A #N/A R #N/A T E #N/A L
#N/A R #N/A T E #N/A L
N R T L #N/A #N/A #N/A
L #N/A #N/A R #N/A T E WT #N/A R #N/A #N/A L
N R T L #N/A #N/A #N/A
R 9 #N/A R #N/A T E #N/A L
L #N/A W T #N/A R #N/A
L #N/A W T #N/A R #N/A
N R T L #N/A #N/A #N/A #N/A #N/A #N/A
T S
N R T L #N/A #N/A #N/A
R T E L
KOUKOURA DRIVE
Town Centre, Community Centre and Education Facility
L WT R
53
R
R
L 10 11 6 14
N R T L #N/A #N/A #N/A
T S
#N/A #N/A
T S
TRAIN STATION
R 6
L
8
#N/A R #N/A T E #N/A L
L N T 33
0 R 32 T E 5 L
22
T S
#N/A #N/A
L
5
R
L #N/A W T #N/A R #N/A
L 0
12
#N/A #N/A #N/A
#N/A
#N/A
0 27 4
#N/A #N/A #N/A
L #N/A T #N/A R #N/A
N T L #N/A #N/A
T S
L WT R
#N/A #N/A
N T L #N/A #N/A
R #N/A
L #N/A W T #N/A R #N/A
N T L #N/A #N/A
R #N/A
L
N R T L #N/A #N/A #N/A
L
L #N/A T #N/A R #N/A
#N/A #N/A
T S
T S
R
R 0 #N/A R #N/A T E #N/A L
#N/A #N/A #N/A
#N/A R #N/A T E #N/A L #N/A
R
L #N/A W T #N/A R #N/A
#N/A #N/A
L #N/A T #N/A R #N/A
#N/A #N/A
T S
R #N/A #N/A R #N/A T #N/A L
T S
L
Town Centre, Community Centre and Education Facility
L #N/A W T #N/A R #N/A L
#N/A R #N/A T E #N/A L #N/A
#N/A R #N/A T E #N/A L
#N/A #N/A #N/A
L #N/A T #N/A R #N/A
R
L #N/A W T #N/A R #N/A
E
W
#N/A #N/A
T S
R #N/A #N/A R #N/A T #N/A L
R #N/A
SUMMERHILL ROAD
#N/A R #N/A T E #N/A L
0
L #N/A W T #N/A R #N/A
L
L #N/A W T #N/A R #N/A
E
R N T 1
EPPING ROAD
11
R T L
T S
EPPING ROAD
R 7 23 0
N R T L #N/A #N/A #N/A
ANDREW ROAD
L 10
15
N T L #N/A #N/A
ANDREW ROAD
25 20 14
N T
BODYCOATS
R 5
L WT R
N T 40
L #N/A W T #N/A R #N/A
#N/A R #N/A T E #N/A L #N/A #N/A #N/A
L
T S
R
Reference Case Design Year Scenario: PM Peak - Degree of Saturation (DOS) Summary
TO WALLAN ### ### ### ### ### ###
SUMMERHILL ROAD
### ### ###
### ### ### 0.8 0.4 0
### ### ###
0.2 0.8 0.1
### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ### 0.7 0.2 0.2
20
### ### ###
0.2 0.8 0.5
### ### ###
### ### ###
### ### ###
TRAIN KOUKOURA DRIVE
### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ###
### ### ###
0.2 0.3 0.2 ### ### ###
0 0.8 0.4
### ### ###
9
0.8 0.7 0.3
0.2 0.4 0.8
BOUNDARY ROAD
### ### ###
### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
Education Facility
### ### ### ### ### ###
Education Facility ### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
0.7 0.3 0.1
21
0.2 0.2 0.2
### ### ###
0.2 0.8 0.7
### ### ### ### ### ###
EDGARS ROAD
### ### ###
0.8 0.3 0.3
0.8 0.5 0.1 0.8 0.8 0.2
0.7 0.5 0.6
0.3 0.3 0.6
5
0.1 0.3 0.3 0.4 0.7 0
0 0.4 0.3
0.2 0.8 0.1
4 0.4 0.4 0.7
0.7 0.1 0.1 0.8 0.7 0.2
0.1 0.4 0.2
3 0.3 0.3 0.3
EPPING ROAD
0.5 0.5 0.4
ANDREW ROAD
### ### ###
6
### ### ###
### ### ###
### ### ### ### ### ###
Major Town Centre, and Community Centre
0.3 0.8 0.7
### ### ###
### ### ###
0.4 0.8 0.2 0.5 0.5 0.2
### ### ###
0.3 0.3 0
0.2 0.3
### ### ###
### ### ###
Town Centre, Community Centre and Education Facility
### ### ###
0
### ### ### ### ### ###
### ### ### ### ### ###
0
12 0
### ### ###
BODYCOATS ROAD
KOUKOURA DRIVE
### ### ###
0 0.2 0.4
### ### ### ### ### ###
### ### ###
### ### ### ### ### ###
### ### ### ### ### ###
Town Centre, Community Centre and Education Facility ### ### ###
### ### ###
### ### ###
### ### ### ### ### ###
0.2 ### ### ###
ANDREW ROAD
15
EPPING ROAD
0.1 0.8 0.1 0.6 0.3 0.7
### ### ### 0.8 0.8 0.1
### ### ###
CRAIGIEBURN ROAD
0.9 0.6 0.1 ### ### ###
### ### ###
0.4 0.5 0.5
1
### ### ### 0.4 0.7 0
0.3 0.9 0.1
LEGEND
TO EPPING
Degree of Saturation between 0.85 and 0.95 Degree of Saturation less than 0.85 Intersection not analysed
North Approach - Left Turn
Degree of Saturation between 0.95 and 1.00
North Approach - Through
North Approach - Right Turn
Degree of Saturation greater than 1.00
P
Six traffic lane Arterial Road (three lanes in each direction) Four traffic lane Arterial Road (two lanes in each direction) Two traffic lane Arterial Road (one lane in each direction)
West Approach - Left Turn West Approach - Through West Approach - Right Turn
East Approach - Right Turn East Approach - Through East Approach - Left Turn
39
Two traffic lane Collector Road (one lane in each direction) South Approach - Through
South Approach - Right Turn
South Approach - Left Turn
Bus Priority Routes (different colour represent different bus services)
### ### ###
### ### ### ### ### ###
SITE LAYOUT
MOVEMENT SUMMARY
Site: Intersection 1 PM Reference New Site Signals - Fixed Time
PHASING SUMMARY
Site: Intersection 1 PM Reference New Site Signals - Fixed Time
Site: Intersection 1 PM Reference New Site Signals - Fixed Time
Cycle Time = 120 seconds (User-Given Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Epping Rd 1
L2
387
10.1
0.319
12.3
LOS B
7.0
53.1
0.40
0.71
57.7
2
T1
1139
10.0
0.873
42.3
LOS D
38.7
293.9
0.91
0.92
41.9
3
R2
52
9.6
0.080
29.5
LOS C
1.8
13.5
0.67
0.72
45.6
1578
10.0
0.873
34.5
LOS C
38.7
293.9
0.78
0.86
45.0
Approach East: Lehmanns Rd 4
L2
44
9.1
0.039
11.3
LOS B
0.6
4.8
0.31
0.66
58.9
5
T1
398
10.1
0.669
58.4
LOS E
7.9
59.8
1.00
0.83
35.3
6
R2
78
10.3
0.416
63.4
LOS E
4.4
33.7
0.98
0.77
32.2
520
10.0
0.669
55.1
LOS E
7.9
59.8
0.94
0.80
36.0
Approach
Cycle Time = 120 seconds (User-Given Cycle Time)
Phase times determined by the program Sequence: Variable Phasing Movement Class: All Movement Classes Input Sequence: A1, A2, B, C, D Output Sequence: A1, A2, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A1 Yes 0 39 4 2 45 38 %
A2 No 45 6 4 2 12 10 %
B No 57 17 4 2 23 19 %
C No 80 15 4 2 21 18 %
D No 101 13 4 2 19 16 %
North: Epping Rd 7
L2
81
9.9
0.064
8.5
LOS A
0.6
4.3
0.19
0.65
61.4
8
T1
524
9.9
0.592
43.7
LOS D
13.7
104.0
0.94
0.79
41.2
9
R2
423
9.9
0.861
72.0
LOS E
13.8
104.6
1.00
0.95
30.0
1028
9.9
0.861
52.6
LOS D
13.8
104.6
0.91
0.85
36.6
Approach
West: Craigieburn Rd East 10
L2
254
9.8
0.387
21.5
LOS C
8.0
60.7
0.63
0.77
50.5
11
T1
320
10.0
0.466
54.1
LOS D
6.0
45.4
0.97
0.77
36.8
12
R2
222
9.9
0.512
62.1
LOS E
6.3
47.7
0.98
0.79
32.5
796
9.9
0.512
45.9
LOS D
8.0
60.7
0.87
0.78
38.7
3922
10.0
0.873
44.3
LOS D
38.7
293.9
0.85
0.83
40.0
Approach All Vehicles
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Created: Friday, 22 August 2014 3:26:22 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd www.sidrasolutions.com SIDRA INTERSECTION 6.0.22.4722 Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 1 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Description
Demand Flow ped/h
Average Delay sec
Level of Service
Average Back of Queue Pedestrian Distance ped m
Prop. Queued
Effective Stop Rate per ped
P11
South Stage 1
50
54.3
LOS E
0.2
0.2
0.95
0.95
P12
South Stage 2
50
51.4
LOS E
0.2
0.2
0.93
0.93
P21
East Stage 1
50
52.4
LOS E
0.2
0.2
0.94
0.94
Normal Movement
Permitted/Opposed
P22
East Stage 2
50
50.5
LOS E
0.2
0.2
0.92
0.92
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
P31
North Stage 1
50
54.3
LOS E
0.2
0.2
0.95
0.95
Stopped Movement
Turn On Red
P32
North Stage 2
50
49.6
LOS E
0.2
0.2
0.91
0.91
Other Movement Class Running
Other Movement Class Stopped
P41
West Stage 1
50
27.4
LOS C
0.1
0.1
0.68
0.68
P42
West Stage 2
50
24.1
LOS C
0.1
0.1
0.63
0.63
400
45.5
LOS E
0.86
0.86
All Pedestrians
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements.
Processed: Friday, 22 August 2014 3:26:23 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd www.sidrasolutions.com SIDRA INTERSECTION 6.0.22.4722 Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 1 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Friday, 22 August 2014 3:26:23 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 1 2046_4-lane Epping Rd_Rev 22-08-14.sip6 8000907, AECOM, NETWORK / Enterprise
SITE LAYOUT
MOVEMENT SUMMARY
Site: Intersection 3 PM Reference New Site Signals - Fixed Time
PHASING SUMMARY
Site: Intersection 3 PM Reference New Site Signals - Fixed Time
Site: Intersection 3 PM Reference New Site Signals - Fixed Time
Cycle Time = 90 seconds (Practical Cycle Time)
Movement Performance - Vehicles Mov ID
OD Mov
Demand Flows Total HV veh/h %
Deg. Satn v/c
Average Delay sec
Level of Service
95% Back of Queue Vehicles Distance veh m
Prop. Queued
Effective Stop Rate per veh
Average Speed km/h
South: Collector Rd 1
L2
83
6.0
0.244
26.7
LOS C
4.8
35.4
0.75
0.69
41.0
2
T1
72
5.6
0.244
22.1
LOS C
4.8
35.4
0.75
0.69
37.5
3
R2
45
6.7
0.286
48.2
LOS D
2.0
14.5
0.97
0.73
32.6
200
6.0
0.286
29.9
LOS C
4.8
35.4
0.80
0.70
37.6
Approach East: Craigieburn Rd East 4
L2
62
6.5
0.098
27.8
LOS C
1.8
13.4
0.70
0.73
41.7
5
T1
803
6.0
0.713
38.4
LOS D
11.6
85.2
0.99
0.86
43.5
6
R2
Approach
169
5.9
0.776
53.7
LOS D
8.0
58.6
1.00
0.89
32.4
1034
6.0
0.776
40.3
LOS D
11.6
85.2
0.97
0.86
41.1
Cycle Time = 90 seconds (Practical Cycle Time)
Phase times determined by the program Sequence: Leading Right Turn Movement Class: All Movement Classes Input Sequence: A, B, C, D Output Sequence: A, B, C, D Phase Timing Results Phase Reference Phase Phase Change Time (sec) Green Time (sec) Yellow Time (sec) All-Red Time (sec) Phase Time (sec) Phase Split
A Yes 0 8 4 2 14 16 %
B No 14 29 4 2 35 39 %
C No 49 11 4 2 17 19 %
D No 66 18 4 2 24 27 %
North: Collector Rd 7
L2
109
6.4
0.120
16.8
LOS B
2.5
18.2
0.55
0.68
44.8
8
T1
72
5.6
0.119
23.1
LOS C
2.2
16.3
0.74
0.58
38.1
9
R2
117
6.0
0.739
52.5
LOS D
5.5
40.7
1.00
0.89
31.5
298
6.0
0.739
32.3
LOS C
5.5
40.7
0.77
0.74
37.1
Approach West: Craigieburn Rd East 10
L2
123
5.7
0.105
9.3
LOS A
1.1
7.8
0.28
0.67
53.5
11
T1
447
6.0
0.397
34.5
LOS C
5.8
42.8
0.91
0.74
45.6
12
R2
34.3
Approach All Vehicles
50
6.0
0.230
47.1
LOS D
2.1
15.2
0.94
0.74
620
6.0
0.397
30.5
LOS C
5.8
42.8
0.79
0.73
45.8
2152
6.0
0.776
35.4
LOS D
11.6
85.2
0.88
0.79
41.3
Level of Service (LOS) Method: Delay (HCM 2000). Vehicle movement LOS values are based on average delay per movement Intersection and Approach LOS values are based on average delay for all vehicle movements. SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay. Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Movement Performance - Pedestrians Mov ID
Description
Demand Flow ped/h
Average Delay sec
Level of Service
Average Back of Queue Pedestrian Distance ped m
Effective Stop Rate per ped
P1
South Full Crossing
20
36.5
LOS D
0.0
0.0
0.90
0.90
P2
East Full Crossing
20
39.2
LOS D
0.0
0.0
0.93
0.93
P3
North Full Crossing
20
39.2
LOS D
0.0
0.0
0.93
0.93
Normal Movement
Permitted/Opposed
P4
West Full Crossing
20
36.5
LOS D
0.0
0.0
0.90
0.90
Slip/Bypass-Lane Movement
Opposed Slip/Bypass-Lane
80
37.9
LOS D
0.92
0.92
Stopped Movement
Turn On Red
Other Movement Class Running
Other Movement Class Stopped
All Pedestrians
Level of Service (LOS) Method: SIDRA Pedestrian LOS Method (Based on Average Delay) Pedestrian movement LOS values are based on average delay per pedestrian movement. Intersection LOS value for Pedestrians is based on average delay for all pedestrian movements. Created: Wednesday, 20 August 2014 2:56:25 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd www.sidrasolutions.com SIDRA INTERSECTION 6.0.22.4722 Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 3 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Prop. Queued
Processed: Wednesday, 20 August 2014 2:55:17 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd SIDRA INTERSECTION 6.0.22.4722 www.sidrasolutions.com Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 3 2046.sip6 8000907, AECOM, NETWORK / Enterprise
Mixed Running & Stopped Movement Classes Undetected Movement
Phase Transition Applied
Processed: Wednesday, 20 August 2014 2:55:17 PM Copyright © 2000-2014 Akcelik and Associates Pty Ltd www.sidrasolutions.com SIDRA INTERSECTION 6.0.22.4722 Project: P:\60313908\4. Tech work area\4.5 Planning\SIDRA MODEL\Reference Case\MODELS\Reference \Intersection 3 2046.sip6 8000907, AECOM, NETWORK / Enterprise
6,7(/$