Introduction Summary of Consultation #1 Site Review 3 Options Team Exercise Costs Team Exercise Next Steps
Process
May Community Consultation #1
June Develop Design Options
July Community Consultation #2
August Present DRAFT report to Council
September Submit Final Schematic Design Report
Project Goal
Big Vision (unbound) vs.
Focusing In (bound)
Project Goal Design and build a pool that is affordable and meets the community’s top aquatic needs
1.
Determine Community Needs
2.
Evaluate Capital Costs
3.
Evaluate Operational Costs
4.
Prepare Schematic Design based on: Community Needs Capital Costs Operational Costs
Community Consultation #1
Community Consultation #1 Possible Pool Activities • • • • • • • • •
Swimming Lessons – All Ages Leisure Swimming – Tots / Kids / Fun Factor Aqua Therapy / Wellness / Accessibility Lifeguard Training Fitness / Activity Classes Diving Swim Club Swim Competitions Competitive Diving
Community Consultation #1 Priority Activities #1 Swimming Lessons
Community Consultation #1 Priority Activities #2 Leisure Swimming
Community Consultation #1 Priority Activities #3 Therapy / Wellness
Community Consultation #1 Priority Activities #4 Lifeguard Training / Fitness / Activity
THE PERFECT WATER TEMPERATURE?
Adult Whirlpool Family Whirlpool Therapy/Wellness Pool Leisure Pool Interactive Water Features Slides Zero Depth Entry Lazy River/Current Channel Water Walk Diving Lap Lanes/Competition Pool