Kingdom Community  Wind Section 248 Workshop July 23, 2010

7/23/2010

KCW PSB 248 Workshop

1

Agenda 1. Introductions – 1 I t d ti C P h C. Pughe 2. Project Overview – C. Pughe  3. Wind Farm – C. Pughe  4. Transmission Upgrades – J. Castonguay 5. Outreach – R. Dostis  6 Project Economics – 6. Project Economics T. Kvedar  T Kvedar 7. VEC PPA/JOA – C. Pughe/J. Castonguay 8. Civil Design – I. Jewkes  9. Aesthetics – David Raphael 10. Environmental Studies – J. Nelson 11 Other Studies – 11. Other Studies C. Pughe C Pughe 12. Questions and Answers 7/23/2010

KCW PSB 248 Workshop

2

Introductions Charlie Pughe – Green Mountain Power • • • • • • • • • • • • •

Don Rendall – Don Rendall Green Mountain Power ‐ Green Mountain Power General Counsel General Counsel Josh Castonguay – Green Mountain Power – Field Operations  Manager/KCW Transmission Steve Litkovitz – Green Mountain Power – Engineering Tony Kvedar – Green Mountain Power – Tony Kvedar – Green Mountain Power – Financial Analyst Financial Analyst Charlie Pughe – Green Mountain Power – Power Generation  Leader/KCW Project Manager Robert Dostis – Green Mountain Power – Leader of External Affairs Jeff Wright – VEC  Jeff Wright  VEC – COO Craig Kieny – VEC – Power Purchasing Peter Zamore – Sheehy Furlong & Behm – GMP outside counsel Ben Marks – Sheehy Furlong & Behm – GMP outside counsel David Raphael Landworks – David Raphael – Landworks aesthetics Ian Jewkes – Krebs & Lansing – civil design Jeff Nelson – VHB Pioneer – environmental consulting

7/23/2010

KCW PSB 248 Workshop

3

Project Overview Project Overview Charlie Pughe – Green Mountain Power • •

Project Location, description and history Project Location description and history 248 Application and witnesses – (BOLD = present today) – – – – – – – – – – – – – – – – – –

7/23/2010

Charles Pughe – GMP – Power Generation Leader/Kingdom Community Wind  Project Manager – Project Generalist Mary Powell – GMP – President/CEO – Why GMP has pursued KCW Robert Dostis – GMP – Leader of External Affairs – Lowell Agreement, Good  Neighbor Fund, Project Outreach g , j Tony Kvedar – GMP – Financial Analyst – Annual cost of output and effect on GMP  rates Doug Smith – GMP – Manager of Power Planning – Market value of output and  integration into GMP Energy Plan Jeff Wright – VEC – COO – Upgrade to VEC system and benefit to VEC of same David Estey – RLC Engineering – Transmission and substation upgrades and effects  on bulk power system reliability on bulk power system reliability Adam Gravel – Stantec – effect of project on Birds, Bats and their habitat Ian Jewkes – Krebs & Lansing – Civil Design – design of roadway, storm water  systems, construction sequencing Ken Kaliski – Resource Systems Group – evaluation of turbine operation and  associated sound levels produced Tom Kavet – Kavet, Rockler & Associates – evaluation of economic impact on the  state and impact on property values state and impact on property values Craig Kieny – VEC – Power Purchasing – value of PPA for VEC Charles Knight – UVM Consulting Archaeology Program – evaluation of project  impact on archeological resources Jeff Nelson – VHB Pioneer – evaluation of impact on wetlands, soils, plants Liz Pritchett – Liz Pritchett Associates – evaluation of project with respect to historic  structures David Raphael – Landworks – evaluation of project with respect to aesthetic  impact and orderly development Jeff Wallin – Multiple Resource Management – evaluation of project with respect to  wildlife and wildlife habitat John Zimmerman – VERA – evaluation of wind resource, ice throw and shadow  flicker

KCW PSB 248 Workshop

4

Wind Farm Charlie Pughe – Green Mountain Power

• Design of Project f • Turbine Considerations: – 20 and 21 turbine layout b l – Turbine Delivery

• • • •

Construction Process Construction Process Schedule N M tT New Met Towers Project Cost

7/23/2010

KCW PSB 248 Workshop

5

7/23/2010

KCW PSB 248 Workshop

6

Transmission Upgrades Transmission Upgrades Josh Castonguay – Green Mountain Power

• Scope of Upgrades f d – Collector System – Upgrades from Route 100 to Jay Tap Up rades from Ro te 100 to Ja Tap – VEC Substation Upgrades

• Electrical Electrical System Compatibility  System Compatibility Study – ISO Feasibility Study y y – VELCO Jay Tap Connection

7/23/2010

KCW PSB 248 Workshop

7

7/23/2010

KCW PSB 248 Workshop

8

Outreach Robert Dostis – Green Mountain Power

• Outreach Efforts O t h Eff t – Neighborhood meetings to present  p j project and hear  questions/concerns from  community members – Town vote Town vote

• Tax payment to Lowell – Minimum annual payment of  $400K, increases $32,500 every 5  years

• Good Neighbor Fund Good Neighbor Fund – Approximately $150K/year for 10  years 7/23/2010

KCW PSB 248 Workshop

9

Project Economics Project Economics Tony Kvedar – Green Mountain Power

• Levelized cost of project l d f • Benefit to GMP and VEC  customers t • In State Renewable Energy • Economic benefit to region E i b fit t i

7/23/2010

KCW PSB 248 Workshop

10

Actual Cost per KWh

7/23/2010

2037 2

2035 2

2033 2

2031 2

2029 2

2027 2

2025 2

2023 2

2021 2

2019 2

2017 2

2015 2

$0.160  $0.140  $0.120  $0.100  $0.080  $0.060  $0.040  $0.020  $‐ 2013 2

$/KWh

Rate Impact of Energy  Output Alt #1

Levelized Cost per KWh

KCW PSB 248 Workshop

11

GMP Resource Mix FY 2009 Premium Renewables wood, methane & wind, 0.3% Net Market Purchases 5.0%

Biomass 3.0%

Hydro Quebec 37.9%

Oil & Natural Gas 0.8%

Hydro Independent Producers 3.3%

Nuclear Power 42.0% Hydro - GMP Owned 7.7%

7/23/2010

KCW PSB 248 Workshop

12

VEC PPA VEC PPA C. Pughe – Green Mountain Power

• • • •

Why partner with VEC h h PPA Treated as virtual Owner Instate Renewable energy source  f VEC for VEC

7/23/2010

KCW PSB 248 Workshop

13

VEC JOA VEC JOA Josh Castonguay – Green Mountain Power

• Description • Benefits to GMP project and VEC  system t • History of working with VEC • Cost allocation of  C t ll ti f Construction/Operation

7/23/2010

KCW PSB 248 Workshop

14

Civil Design Civil Design Ian Jewkes – Krebs & Lansing

• Project components P j t t – Access road – Crane path Crane path – Wind turbine pads – Substation maintenance building  – Storm water design

• Site design considerations – Minimize off‐site impacts Minimize off site impacts – Minimize environmental impacts – Maximize wind resource – Minimize offsite visual impacts – Facilitate efficient construction  7/23/2010

KCW PSB 248 Workshop

15

7/23/2010

KCW PSB 248 Workshop

16

7/23/2010

KCW PSB 248 Workshop

17

Aesthetics David Raphael ‐ Landworks

• Description of process to evaluate  f l Project – 10 mile radius 10 mile radius – Public Facilities – View Shed Analysis View Shed Analysis

• Description of Impact

7/23/2010

KCW PSB 248 Workshop

18

7/23/2010

KCW PSB 248 Workshop

19

7/23/2010

KCW PSB 248 Workshop

20

7/23/2010

KCW PSB 248 Workshop

21

Environmental Studies Environmental Studies Jeff Nelson – VHB Pioneer

• Resources evaluated R l t d – Wetlands/streams – RTE/Plants – Natural communities – Soils and bedrock – Animal Habitat

• Information usage – Natural resources report Natural resources report – Design/Development to minimize  impacts – Determination of compliance with  248 criteria

7/23/2010

KCW PSB 248 Workshop

22

7/23/2010

KCW PSB 248 Workshop

23

Other Studies Other Studies Charlie Pughe – Green Mountain Power

• Bi Bird and Bat Habitat ‐ d d B t H bit t Stantec St t • Historic Sites – Liz Pritchett  Associates • Wind Energy/Flicker/Ice Throw  – VERA • Sound Levels – d l Resource Systems  Group • Economic Impact  Economic Impact – Kavet, Rockler &  Kavet, Rockler & Associates • Archeology – UVM Consulting  A h l Archeology Program P • Wildlife Habitat – Multiple Resource  Management g 7/23/2010

KCW PSB 248 Workshop

24