LEED 2009 for Existing Buildings: Operations & Maintenance IEQ CREDIT 1.4: INDOOR AIR QUALITY BEST MANAGEMENT PRACTICES REDUCE PARTICULATES IN AIR DISTRIBUTION All fields and uploads are required unless otherwise noted.

ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Performance period start:

Invalid date range: The performance period must be between 89 and 731 days, and must end within 90 days of the overall project performance period given in Project Information Form 4.

Performance period end: Signatory IEQc1.4. Air filtration media with a minimum efficiency reporting value (MERV) of 13 or higher were in place and functioning properly for all outside air intakes in the project building during the performance period. Select one of the following: Signature. Provide a digital signature affirming the signatory statement in gray directly above.

OR

Upload IEQc1.4-S1. Provide a document with the signatory statement, copied directly from the form, signed and dated on letterhead.

Initial here:

Upload

Files:

0

Complete the table below. List all filtration media in place on outside air intakes during the performance period. Table IEQc1.4-1. Air Filtration Media Filtration Manufacturer

Filter Identification (Model #)

MERV Rating

Location of Installed Filter +

LEED 2009 for Existing Buildings: Operations & Maintenance IEQ Credit 1.4: Indoor Air Quality Best Management Practices - Reduce Particulates in Air Distribution

Points Attempted:

Points Awarded:

-

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

Describe the schedule for regular maintenance and replacement of filters. Summarize the manufacturer's recommended replacement interval for the specific application of each filter used in the project building.

ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.

SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload IEQc1.4-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)

Upload

Files:

0

The project team is using an alternative compliance approach in lieu of standard submittal paths.

LEED 2009 for Existing Buildings: Operations & Maintenance IEQ Credit 1.4: Indoor Air Quality Best Management Practices - Reduce Particulates in Air Distribution

Points Attempted:

Points Awarded:

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the credit intent and requirements. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload IEQc1.4-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)

Upload

Files:

0

SUMMARY IEQ Credit 1.4: Indoor Air Quality Best Management Practices - Reduce Particulates in Air Distribution Points Documented:

Check Compliance

LEED 2009 for Existing Buildings: Operations & Maintenance IEQ Credit 1.4: Indoor Air Quality Best Management Practices - Reduce Particulates in Air Distribution

Points Attempted:

Points Awarded:

Page of

Version 4.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.