LEED 2009 for Retail: New Construction and Major Renovations MR

Report 1 Downloads 13 Views
LEED 2009 for Retail: New Construction and Major Renovations MR PREREQUISITE 1: STORAGE AND COLLECTION OF RECYCLABLES All fields and uploads are required unless otherwise noted.

ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Describe the methodology used by the project team in creating the waste study. List the source of the data if historical data from a similar existing store (in size and function) was used, or if a source was not used, describe the rationale surrounding the waste projections. List the top 5 recyclable waste streams by weight or volume, and indicate the top 3 waste streams for which collection and storage space will be provided.

Upload MRp1-1. Provide an excerpt of the waste stream study conducted by the project team which highlights the top 3 waste streams identified.

Upload

Files:

0

The recycling storage areas are sized for the following material types: (Select all that apply) Paper

Plastic film

Corrugated cardboard

Hanger metals

Glass

Food waste

Plastics

Other

Metals Select one of the following: Upload L-1 from PI Form 4 is a floor plan highlighting OR recycling storage areas. Upload

Files:

0

LEED 2009 for Retail: New Construction and Major Renovations MR Prerequisite 1: Storage and Collection of Recyclables

Upload MRp1-2. Provide a credit-specific floor plan highlighting the recycling storage areas in the project. Upload

Files:

0

Page 1 of 3

Version 1.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

Select one of the following: Upload L-2 from PI Form 4 is a site plan highlighting OR recycling storage areas not represented in the floor plan. (Optional) Upload

Files:

Upload MRp1-3. Provide a credit-specific site plan for the project building that highlights the recycling storage areas. (Optional) Upload

0

Files:

0

ADDITIONAL DETAILS Special circumstances preclude documentation of compliance with the submittal requirements outlined in this form.

SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload MRp1-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)

Upload

Files:

0

The project team is using an alternative compliance approach in lieu of standard submittal paths and/or documentation.

ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the prerequisite intent and requirements. Be sure to reference what additional documentation has been provided, if any. Nonstandard documentation will be considered upon its merits.

LEED 2009 for Retail: New Construction and Major Renovations MR Prerequisite 1: Storage and Collection of Recyclables

Page 2 of 3

Version 1.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

Upload MRp1-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)

Upload

Files:

0

SUMMARY MR Prerequisite 1: Storage and Collection of Recyclables Compliance Documented:

LEED 2009 for Retail: New Construction and Major Renovations MR Prerequisite 1: Storage and Collection of Recyclables

N

Page 3 of 3

Version 1.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.