Leveraging Innova2ve Toe Sleeve Technology to

Report 0 Downloads 35 Views
Leveraging  Innova,ve  Toe  Sleeve  Technology  to  Customize  Casing  Integrity   Tes,ng,  Flow  Path  Ini,a,on,  and  Forma,on  S,mula,on  Opera,ons      May  24,  2016   ©2016 TAM International, Inc.

PosiFrac  Toe  Sleeve™   Winner  of  the  2016  Meritorious  Engineering  Award  for   Hydraulic  Fracturing/Comple,ons  

Key  System  Components   Valve  Sub  

Opening  Sleeve   Debris  Barrier  w/   Rupture  Disks  

Conven,onal  Toe  Sleeve  Func,onality   Burst  Disk  Systems   PRESSURE

PRESSURE

Metered  Systems  

TIME •  Fluid  vola,lity  can  cause  tool  to  open   prematurely   •  Once  fluid  begins  metering,  limited   amount  of  ,me  to  perform  test(s)    

TIME •  Must  exceed  validated  test  pressure  to   open  or   •  Must  pump  down  dissolvable  ball  to  test   casing  to  maximum  pressure  

•  Opens  during  bleed  down   •  Test  pressures  can  be  held   indefinitely     •  SeXngs  customized  for  every   installa,on   •  No  need  for  ancillary   equipment   •  Mul,ple  sleeves  can  be   opened  concurrently    

PRESSURE

PTS  Innova,ve  Func,onality  

TIME

•  Opens  during  bleed  down   •  Test  pressures  can  be  held   indefinitely     •  SeXngs  customized  for  every   installa,on   •  No  need  for  ancillary   equipment   •  Mul,ple  sleeves  can  be   opened  concurrently    

PRESSURE

PTS  Innova,ve  Func,onality  

Valve  Sub  Ini,ated  

ΔP   Opening  Sleeve   Actuated  

TIME

Valve  Sub  Opera,onal  Sequence   Running  in  the  Hole  

Check Valve Chamber

Bottom Hole Pressure

Bottom Hole Pressure

Balanced Area Piston

Flow Piston Chamber

Shear Wire Flow Path to Opening Sleeve

Valve  Sub  Opera,onal  Sequence   Casing  Integrity  Test  

Check Valve Chamber

Casing Integrity Test Pressure

Casing Integrity Test Pressure Balanced Area Piston

Flow Piston Chamber

Shear Wire Flow Path to Opening Sleeve

Valve  Sub  Opera,onal  Sequence   Actua,ng  Opening  Sleeve  

Check Valve Chamber

Casing Integrity Test Pressure

Bottom Hole Pressure

Balanced Area Piston

Flow Piston Chamber

Shear Wire Flow Path to Opening Sleeve

Opera,onal  Customiza,on  Case  History  #1   Loca1on:    Bakken   Requirement:      

•  Perform  two  casing  integrity  tests  to  maximum   allowable  pressure  against  upper  and  lower   master  valves   •  Bleed  off  to  a  maximum  of  5,000  psi  surface   pressure  between  tests   •  Open  the  PTS  on  bleed  down  of  the  second  test    

Opera,onal  Customiza,on  Case  History  #1   Test  #2  

PRESSURE

Test  #1  

Valve  Sub   Ini,ated   Opening  Sleeve   Actuated  

TIME

Opera,onal  Customiza,on  Case  History  #2   Loca1on:    U,ca   Requirement:      

•  Install  two  PTS  sleeves  for  forma,on  evalua,on   and  high-­‐rate  toe  stage  s,mula,on  opera,ons   •  Perform  casing  integrity  test  with  two  30-­‐minute   hold  periods  at  ascending  pressures  before   opening  both  sleeves  on  bleed  down  

Opera,onal  Customiza,on  Case  History  #2  

PRESSURE

Test  #1  

Test  #2  

Valve  Sub   Ini,ated   Opening  Sleeve   Actuated  

TIME

Ques,ons?