Request for Proposal For Construction Remodel June 2017 RFP # REM101 Date Issued: June 9, 2017 Date Due: June 22, 2017 1:00 P.M. MDT
Lincoln Academy Attention: Jake Hunt 1582 W 3300 N Pleasant Grove, UT 84062 Phone: 801-756-2039 Email:
[email protected] Lincoln Academy RFP
2
Table of Contents I. General .................................................................................................................................... 3 A. Purpose ............................................................................................................................................ 3 B. Key Dates ......................................................................................................................................... 3 2. Background ........................................................................................................................... 3 A. History .............................................................................................................................................. 3 3. Service Requirements ....................................................................................................... 3 A. School Expectations ..................................................................................................................... 3 B. Bidders ............................................................................................................................................. 3 C. Pricing Proposal ............................................................................................................................ 4 4- Submission Guidelines ..................................................................................................... 4 A. Bidder’s Profile ............................................................................................................................. 4 B. Submission Format ...................................................................................................................... 5 5. RFP Conditions ..................................................................................................................... 5 A. RFP Documents ............................................................................................................................. 5 B. Questions about the RFP ............................................................................................................ 5 C. Site Visits ......................................................................................................................................... 5 D. Evaluation Criteria ....................................................................................................................... 5 E. Acceptance of Proposal ............................................................................................................... 6 F. Disclosure ........................................................................................................................................ 6 6. Floor Plans for Remodel ................................................................................................... 7
Lincoln Academy RFP
3
I. General A. Purpose The purpose of this project is to remodel approximately 1,000 square feet of classroom, add a removable wall to the stage section and remodel adjacent storage area.
B. Key Dates Responses to the RFP must be submitted no later than Thursday June 22nd by 1:00 PM MST. Anticipated award date for project is June 28, 2017. Full plans should be available June 23, 2017. Project is anticipated to begin after July 1, 2017 and be completed by August 12, 2017.
2. Background A. History Lincoln Academy is a public charter school operating in Pleasant Grove, Utah. It opened in the fall of 2005 and served 400 students at that time. It expanded several times over the years and now serves 865 students.
3. Service Requirements A. School Expectations • •
It is expected that the school will make the remodel area available at all times for the contractors during the remodel process. It is expected that the school will be reasonably available to the selected contractor during the construction/remodel process for advisement.
B. Bidders •
•
•
It is expected that bidders will hold appropriate and current state licensure to engage in the business of commercial construction, before, during and for a period of at least three years after completion of this project. It is expected that bidders utilizing subcontractors will ensure that the selected subcontractors will hold appropriate and current state licensure to engage in the business of commercial construction during the project. It is expected that all bidders have adequate financing to fund their business and construction obligations during the project.
Lincoln Academy RFP •
•
• •
•
• •
4
It is expected that the winning bidder will meet all legal requirements of charter school or school construction in the State of Utah and will comply with all applicable building codes, statutes and rules governing charter school or school construction. It is expected that the winning bidder will work with the architect to obtain all necessary and appropriate approvals, permits and authorizations for construction in the location as indicated. It is expected that bidders will have knowledge of and comply with construction reporting requirements for public schools in Utah. It is expected that the winning bidder will work with the architecture company to provide and present timely reports, including at least monthly, or more frequent as required by agencies, Construction Inspection Reports to appropriate parties, including the State of Utah and its various Departments or Agencies, County and Local municipalities, including the school. It is expected that the winning bidder will comply with all applicable federal statutes and Americans With Disabilities Act (ADA) regulations in association with the design and construction of the charter school building. It is expected that the winning bidder will provide a statement that employees are legal to work in the United Sates. Proof of e-verify use is preferred. It is expected that construction will be completed with Occupancy no later than August 12, 2017.
C. Pricing Proposal •
•
•
Lincoln Academy is seeking immediate proposals to begin the remodel project as roughly outlined in the floor plan on pages 7-10. All proposals should be a Cost Plus percentage that the qualified contractor is willing to perform the duties of a General Contractor as a percentage of the actual costs of construction. Timeliness is of the utmost importance and the project must be completed by August 12, 2017. The time schedule must be taken into consideration in the submittal of a proposal. Because a section of the construction is to be funded with different funding sources the bid must be broken down into two areas: o Area 1- Rooms 101, 102, 103, 104 and 112. o Area 2- Rooms 110, 111, 113, 114, 115, 150, 151, and 152. In addition to the cost plus percentage proposal please submit a best guess estimate total cost for Area 1 and Area 2.
4- Submission Guidelines A. Bidder’s Profile Bidders must identify relevant administrative, management, and financial capabilities as well as technical skills, qualifications and experience necessary and appropriate to the evaluation of their ability to successfully complete the proposed project and meet the objectives of the RFP.
Lincoln Academy RFP
5
Bidders will provide with their proposals at least five (5) references, including contact information of the end-user, for completed projects of a similar nature, including the dollar value of the projects.
B. Submission Format Bidders should submit their sealed proposal in the preferred format: •
Letter of Introduction: Contractor name, contact person, address, telephone number, fax number and a brief introduction to the bidding company.
•
Proposed Project Timeline: Timeline of work required and projected schedule to complete project.
•
Additional information- any additional information that would help Lincoln Academy make an informed decision.
5. RFP Conditions A. RFP Documents The RFP Documents are to be submitted via email to
[email protected] before June 22nd at 1:00 PM.
B. Questions about the RFP
Any questions about the RFP should be submitted to
[email protected]. No other individuals associated with Lincoln Academy are to be contacted.
C. Site Visits Interested individuals can arrange to visit Lincoln Academy by requesting a visit with Jake Hunt-
[email protected]. Times will be arranged through email conversations.
D. Evaluation Criteria
Bid will be awarded to the firm whose proposal is determined to be the most advantageous to Lincoln Academy after consideration of all criteria. The criteria for evaluation will focus primarily on: • Cost Plus Percentage • Demonstrated ability to meet the scope of work • Qualification and expertise of staff proposed for this project. • Demonstrated ability to complete project within required time
Lincoln Academy RFP
6
E. Acceptance of Proposal • • • •
Bids will be opened in a public meeting after the due date and time with the name (name only) of the bidder announced and recorded in the meeting minutes. Bid will be awarded to the firm whose proposal is determined to be the most advantageous to the school after consideration of all criteria. The winning bidder will receive the award in writing. The school reserves the right to reject any or all proposals or to waive any formality or technicality in the best interest of the school.
F. Disclosure All documents submitted by bidders shall become the property of the school. Proposal information is proprietary and as such shall be treated as confidential. Information pertaining to the school obtained by the bidder as a result of participation in this project is confidential and must not be disclosed without written authorization from the school.
1
2
3
4
5
6
GENERAL NOTE - FLOOR PLAN
AREA 2
A. PLAN WALL DIMENSIONS ARE TO GRID LINE OR FACE OF WALL STRUCTURE. "CLEAR" DIMENSIONS ARE TO FACE OF WALL FINISH. B. FIELD VERIFY ALL EXISTING CONDITIONS AND THEIR COMPATIBILITY WITH NEW CONSTRUCTION PRIOR TO THE COMMENCEMENT OF WORK. COORDINATE DISCREPANCIES WITH ARCHITECT. C. DO NOT SCALE DRAWINGS. D. SEE CIVIL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR MORE INFORMATION. E. SEE G SERIES SHEETS FOR WALL TYPES AND TYPICAL ACCESSIBILITY CLEARANCE AND COMPLIANCE REQUIREMENTS. F. PROVIDE BACKING BEHIND ALL SURFACE MOUNTED EQUIPMENT AND/OR FIXTURES PER DETAIL XX/XXXX
AREA 1
OFFICE 112 116 SF
CORRIDOR 110 182 SF
CLASSROOM 101 710 SF
E
OFFICE 111 77 SF
C1 A401
OFFICE 103 76 SF
TOILET 104 69 SF STORAGE 150 185 SF
UP
STAGE 151 906 SF
#
Date
D
C5 A401
STORAGE 152 205 SF
1 A201 C
1582 W 3300 N PLEASANT GROVE, UT 84062
OFFICE 115 140 SF
Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect. © Architectural Nexus, Inc. 2014
CLASSROOM & STAGE REMODEL
OFFICE 114 137 SF
OFFICE 102 116 SF
LINCOLN ACADEMY
OFFICE 113 132 SF
Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com
Revision
B
NOT FOR CONSTRUCTION NEXUS PROJ. #: 17000 CHECKED BY: Checker DRAWN BY: Author 06.09.2017 DATE:
6/9/2017 4:40:05 PM
FLOOR PLAN
A1 LEVEL 01 A101
1/8" = 1'-0"
A
A101
1
2
3
4
5
6
GENERAL NOTE - ENLARGED FLOOR PLAN A. PLAN WALL DIMENSIONS ARE TO GRID LINE OR FACE OF WALL STRUCTURE. "CLEAR" DIMENSIONS ARE TO FACE OF WALL FINISH. B. FIELD VERIFY ALL EXISTING CONDITIONS AND THEIR COMPATIBILITY WITH NEW CONSTRUCTION PRIOR TO THE COMMENCEMENT OF WORK. COORDINATE DISCREPANCIES WITH ARCHITECT. C. DO NOT SCALE DRAWINGS. D. SEE CIVIL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR MORE INFORMATION. E. SEE G SERIES SHEETS FOR WALL TYPES AND TYPICAL ACCESSIBILITY CLEARANCE AND COMPLIANCE REQUIREMENTS. F. PROVIDE BACKING BEHIND ALL SURFACE MOUNTED EQUIPMENT AND/OR FIXTURES PER DETAIL XX/XXXX.
OFFICE 113 132 SF NEW LOCATION FOR EXISTING SMARTBOARD
113 OFFICE 112 116 SF
ALL CLASSROOM AND OFFICE AREAS TO RECEIVE NEW CARPET, BASE, PAINT, CEILING TILES & LIGHT FIXTURES
CORRIDOR 110 182 SF
111
103 OFFICE 111 77 SF
NEW GYPBOARD WALLS
OFFICE 103 76 SF
NEW OPERABLE WALL, STC 50 MIN. NEW SUPPORTING COLUMN AND BEAMS TO SUPPORT
NEW MILLWORK: FULL LENGTH UPPER AND LOWER CABINETS WITH COUNTERTOP
115
NEW LOCATION FOR EXISTING SMARTBOARD
OFFICE 115 140 SF
104
TOILET 104 69 SF
STORAGE 150 185 SF
D
NEW TOILET FIXTURES. PLUMBING TIED INTO EXISTING BATHROOM TO THE SOUTH ADA SHOWER
#
Date
NEW STAIR TO REACH NEW STORAGE PLATFORM
RELOCATED TRACK AND CURTAIN POCKET FOR OPERABLE WALL
NEW DOOR AT UPPER LEVEL
NEW STORAGE PLATFORM ABOVE ENTIRE (EXPANDED) STORAGE ROOM
STAGE 151 906 SF C
C1 ENLARGED CLASSROOM AREA A401
1/4" = 1'-0"
1582 W 3300 N PLEASANT GROVE, UT 84062
9'-6" HIGH ACCRODION DOORS, STC 42
102
CLASSROOM & STAGE REMODEL
OFFICE 114 137 SF
112
CLASSROOM 101 710 SF
Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect. © Architectural Nexus, Inc. 2014
LINCOLN ACADEMY
114
E
OFFICE 102 116 SF
Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com
C5 ENLARGED STAGE AREA A401
1/4" = 1'-0"
Revision
B
NOT FOR CONSTRUCTION NEXUS PROJ. #: 17000 CHECKED BY: Checker DRAWN BY: Author 06.09.2017 DATE:
6/9/2017 4:40:06 PM
ENLARGED FLOOR PLAN
A
A401
1
2
3
4
5
6
GENERAL NOTE DEMOLITION PLAN
E
DEMOLISH AND PREPARE FOR NEW OPENING DEMOLISH SLAB AS NEEDED FOR NEW PLUMBING
UP
#
Date
REMOVE EXISTING CURTAIN AND TRACK, SAVE FOR RE-INSTALLATION
D
PREPARE FOR NEW STAIRS TO ACCESS UPPER STORAGE PLATFORM
DEMOLISH EXISTING WALLS FOR NEW OPERALBE WALL POCKET
NEW STORAGE PLATFORM ABOVE EXPANDED STORAGE ROOM DEMOLISH EXISTING WALLS AND STAIRS TO EXTEND STORAGE AREA SALVAGE EXISTING DOOR FOR REINSTALLATION
UP
C
1582 W 3300 N PLEASANT GROVE, UT 84062
DEMOLISH EXISTING CASEWORK AND PLUMBING
Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect. © Architectural Nexus, Inc. 2014
CLASSROOM & STAGE REMODEL
DEMOLISH EXISTING WALLS, CEILING, FLOOR FINISHES, ETC. SALVAGE EXISTING DOORS FOR REUSE IN NEW CONSTRUCTION
Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com
LINCOLN ACADEMY
REMOVE AND PROTECT EXISTING SMARTBOARD FOR RELOCATION
A. PROTECT WALLS, CEILINGS, FLOORS AND OTHER EXISTING FINISH WORK THAT ARE TO REMAIN OR THAT ARE EXPOSED DURING SELECTIVE DEMOLITION OPERATIONS B. PATCH AND REPAIR DAMAGE IN WALLS, CEILINGS, AND FLOORS RESULTING FROM DEMOLITION OF EXISTING ITEMS OR CONSTRUCTION OF NEW ITEMS AND/OR REPLACE WITH NEW TO MATCH EXISTING. CLEAN AND PREPARE TO RECEIVE NEW FINISH. C. PROTECT ADJACENT AREAS FROM DUST AND DEBRIS DURING SELECTIVE DEMOLITION OPERATIONS. D. TRANSPORT DEMOLISHED MATERIALS OFF OWNER'S PROPERTY AND LEGALLY DISPOSE OF DEBRIS. E. FIELD VERIFY EXISTING CONDITIONS AND THEIR COMPATIBILITY WITH NEW CONSTRUCTION PRIOR TO THE COMMENCEMENT OF WORK. COORDINATE DISCREPANCIES WITH ARCHITECT. F. CLEAN ADJACENT IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSE BY SELECTIVE DEMOLITION OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE SELECTIVE DEMOLTION OPERATIONS BEGAN. G. SEE MECHANICAL, ELECTRICAL, AND AUDIOVISUAL DRAWINGS FOR ADDITIONAL INFORMATION. COORDINATE DISCREPANCIES WITH ARCHITECT PRIOR TO PROCEEDING WITH WORK.
Revision
B
NOT FOR CONSTRUCTION NEXUS PROJ. #: 17000 CHECKED BY: Checker DRAWN BY: Author 06.09.2017 DATE:
6/9/2017 4:40:08 PM
DEMOLITION PLAN A1 LEVEL 01 - DEMOLITION PLAN AD101
1/8" = 1'-0"
A
AD101