LONG BRANCH – SLIGO CREEK NEIGHBORHOOD ASSOCIATION COMMUNITY MEETING Brendan Gamble, Construction Manager

Washington Gas FEBRUARY 14, 2018

Using Natural Gas Safely •Natural Gas is non-toxic, colorless, odorless and combustible •Mercaptan is added as an unpleasant odorant to help detect leaking natural gas •You are an important part of our safety program •Remember the 3 R’s:

Recognize, React, and Respond!

2

Introduction •PROJECT PARTICIPANTS – CONSTRUCTION •Brendan Gamble, Manager •Rick Ayoub, Supervisor – PAVING

•Kevin Bates, Supervisor

3

Project Coordination •Coordinated with Takoma Park and MD SHA - Accelerated gas line replacement project - Submission to PSC for approval

•MD STRIDE Accelerated Replacement Program - Allows for more timely upgrades to eligible utility infrastructure - Annual Replacement Program – based on system analysis of historical system trends as well as other factors

4

Project Scope & Status • Replace approximately 29,350 feet of low pressure steel main and 557 affected services –Increases reliability and safety •Installed 29,350 feet of HDPE plastic gas main and replaced 553 services • Currently abandoning low pressure steel main • Anticipate completion of construction activities by April 2018

5

Project Area Affected Streets: •Flower Ave •Domer Ave •Garland Ave •Central Ave •Davis Ave •Jackson Ave •Minter Pl •Carroll Ave

6

Project Status Abandoned facilities on Flower Ave from Carroll Ave to Domer Ave and Chaney Dr (shown in red) Anticipate completion of construction activities by April 2018

7

Restoration • Property Restoration: – Private property and yards will be restored as close to their original state as possible – If repairs are not made to your satisfaction, please contact NPL at [email protected]

8

Restoration • Paving: – Road restoration will occur in sections as construction is completed

– There are approximately 200+/- base repairs remaining, mostly on Flower Ave. – Mill and Overlay will take place after all construction and base repairs are complete and as the weather allows. – Traffic control will be handled in a manner as to lessen the impact to the community (manpower, detouring, and signage).

– City of Takoma Park will be notified 72 hours prior to roads being closed , and No Parking signs placed.

Company Name FEBRUARY 14, 2018

9

Points of Contact •Brendan Gamble, Construction Manager –(703) 343-0395 mobile –[email protected]

•Rick Ayoub, Construction Supervisor –(571) 249-0276 mobile –[email protected]

•Kevin Bates, Paving Supervisor –(703) 750-5890 office –[email protected]

• David Graubard, Paving Liaison –(571)205-5803 mobile

[email protected]

10

Points of Contact • Paving Hotline –(703)-750-4524 •

Leave Name



Address



Telephone number

Company Name FEBRUARY 14, 2018

11

QUESTIONS?