PROJECT LOCATION: LOWELL, VERMONT
STATE OF VERMONT NTS
LOWELL SWITCHING STATION
PROJECT LOCATION
Proposed Design LOWELL, VERMONT INDEX OF SHEETS DWG NO 001033-A2-C1-REVB 001033-A2-C2-REVA 001033-A2-C3-REVA 001033-A2-C4-REVC 001033-A2-C5-REVC 001033-A2-C6-REVA 001033-A2-C7-REVB 001033-A2-E1-REVB 001033-A2-E2-REVC
DESCRIPTION SITE PLAN GENERAL ARRANGEMENT PLAN TRANSFORMER OIL CONTAINMENT DETAIL ELEVATION-AA ELEVATION-BB ELEVATION-CC 12KV STRUCTURE DESIGN DETAILS CONTROL BUILDING PLAN/ELEVATIONS ONE LINE DIAGRAM PROTECTION ONE LINE
VICINITY MAP NTS
May 18, 2011 RLC Project Number: 001033-A2
CON
TROL H 14' X OUSE 22'
B
TO C
D
VPS
LOW
ELL
B
A
C
D
C
E
A
E AMI
PROJECT #:
VEC LOWELL #5 SUBSTATION VERMONT ELECTRIC COOP. LOWELL, VERMONT B
UPDATED FOR COMMENTS
04/20/11
A
ISSUED FOR CLIENT REVIEW
04/14/10
NO.
REVISION/ISSUE
DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
PROPOSED DESIGN - SITE PLAN
001033-A2-C1 ENGIN'D BY: DPE DRAWN BY: NRM DATE: 2-19-10
CONTROL HOUSE 14' X 22'
TO CVPS LOWELL
B
B
D
140'-0"
C
A
C
D
E
A
E AMI
140'-0"
DRAWING #:
LOWELL SUBSTATION VERMONT ELECTRIC COOP. LOWELL, VERMONT A
ISSUED FOR APPROVAL
04/20/11
NO.
REVISION/ISSUE
DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
GENERAL ARRANGEMENT
001033-A2-C2 ENGIN'D BY: DPE DRAWN BY: NRM DATE: 4-20-11
DRAWING #:
LOWELL SUBSTATION
001033-A2-C3 ENGIN'D BY:
VERMONT ELECTRIC COOP. LOWELL, VERMONT A NO.
ISSUED FOR CLIENT REVIEW REVISION/ISSUE
04/22/11 DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
TRANSFORMER OIL CONTAINMENT DETAILS/SECTION VIEWS
DPE DRAWN BY: NRM DATE: 4-22-11
DRAWING #:
LOWELL SUBSTATION C
ADDED MATERIAL ID LABELS
04/20/11
B
REISSUED FOR CLIENT REVIEW
04/19/10
A
ISSUED FOR CLIENT REVIEW
04/14/10
NO.
REVISION/ISSUE
DATE
VERMONT ELECTRIC COOP. LOWELL, VERMONT 18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
ELEVATION VIEW A-A
001033-A2-C4 ENGIN'D BY: DPE DRAWN BY: NRM DATE: 2-23-10
DRAWING #:
LOWELL SUBSTATION C
ADDED MATERIAL ID LABELS
04/20/11
B
REISSUED FOR CLIENT REVIEW
04/19/10
A
ISSUED FOR CLIENT REVIEW
04/14/10
NO.
REVISION/ISSUE
DATE
VERMONT ELECTRIC COOP. LOWELL, VERMONT 18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
ELEVATION VIEW B-B
001033-A2-C5 ENGIN'D BY: DPE DRAWN BY: NRM DATE: 2-23-10
DRAWING #:
LOWELL SUBSTATION
001033-A2-C6 ENGIN'D BY:
VERMONT ELECTRIC COOP. LOWELL, VERMONT A
ISSUED FOR CLIENT REVIEW
05/17/11
NO.
REVISION/ISSUE
DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
12KV STRUCTURE DESIGN DETAILS ELEVATION VIEW
DPE DRAWN BY: NRM DATE: 5-17-11
12 1
22'-0"
14'-0"
12 1
22'-0"
DRAWING #:
LOWELL SUBSTATION
001033-A2-C7 ENGIN'D BY:
B
MODIFIED BUILDING DIMENSIONS
04/20/11
A
ISSUED FOR CLIENT REVIEW
04/14/10
NO.
REVISION/ISSUE
DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
VERMONT ELECTRIC COOP. LOWELL, VERMONT
CONTROL BUILDING PLAN & ELEVATION VIEWS
DPE DRAWN BY: NRM DATE: 4-13-10
CVPS LOWELL SUBSTATION
205 N.O.
CVPS
IRASBURG
CVPS JOHNSON
B
VEC
B20
43.8kV /34.5kV (1) 3 , 15/20/22.4MVA
209
441
720
150
HV=250kV BIL, LV=200kV BIL Z=1.83%
3A
1A 10KV 8.4KV MCOV
(3)
(3)
1A-8
1A-7
3A-8
3A-7
1A
3A
(1) 3 UNIT SEL 651R 200A MPU 16kA S.C. 110kV BIL
(1) 3 UNIT SEL 651R 200A MPU 16kA S.C. 110kV BIL
R
1A-6
10KV 8.4KV MCOV
R
3A-6
N/O LOWELL 12.47kV BUS 600A
1" COPPER BUS
150kVA 3 PAD-MOUNT 7200/12470V 277/480V AMI UNIT GRDY - GRDY
VR5 V
METERING
(3) 600A - 15kV SINGLE SEQUENCED VOLTAGE REGULATOR BY PASS SWITCHES
CT'S (2) 800/5A
7200/12470V (3), 1 UNITS A B C AMI METERING
PT'S (3) CT'S (3) 300, 600/5A
5-MBL
PT'S (2) 400:1
5-MBL
MOBILE SUB HIGH SIDE CABLE DISCONNECTS (3)
MOBILE SUB LOW SIDE CABLE DISCONNECTS (3)
54KV 42KV MCOV
5-101 600A
LB
(3)
(3) 10KV 8.4KV MCOV 46kV /12.47kV 7.5/9.3MVA
C53-7
Z=7.0% HV=250kV BIL LV=110kV BIL
1200A 40kA
PT (1)
(3) 46kV PT 250kV BIL 200/400:1
(3) 54KV 42KV MCOV
919F
C53
52
125E FUSES STANDARD SPEED
C53-6 1200A 40kA
919 600A
LOWELL 46kV BUS
2" COPPER BUS
C52-8 1200A 40kA
C52-6
C51-6
1200A 40kA
1200A 40kA
C51-8
C52
52
1200A 40kA
PT (1)
52
54KV 42KV MCOV (3)
C51
PT (1)
C52-7
C51-7
1200A 40kA
1200A 40kA
STATION SERVICE
(3) 54KV 42KV MCOV CT'S (2) 800/5A
REVENUE METERING PT'S (2) 400:1
TO JAY #17 SUBSTATION
54KV 42KV MCOV (3)
KINGDOM COMMUNITY WIND
VEC LOWELL SUBSTATION
B
ADDED METERING TO THE CVP LINE
4/20/11
A
FOR CLIENT REVIEW
4/21/10
NO.
REVISION/ISSUE
DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
PROJECT #: 001033-A2-E1
KINGDOM COMMUNITY WIND PROJECT
ENGIN'D BY:
LOWELL, VERMONT
DPE DRAWN BY:
SIMPLIFIED ONE LINE DIAGRAM PROPOSED CONFIGURATION
ARH DATE: 1/28/10
PROJECT #:
LOWELL WIND PROJECT C
ADDED LINE & BUS DIFFERENTIAL PROTECTION
GREEN MOUNTAIN POWER LOWELL, VERMONT
05/18/11
B
REMOVED LINE SWITCH-MOVED LINE VTS
04/21/10
A
ISSUED FOR CLIENT REVIEW
04/14/10
NO.
REVISION/ISSUE
DATE
18 Meadow Road P.O. Box 722 Augusta, ME 04332 Phone 207-621-1077
VEC LOWELL 46KV SUBSTATION PROTECTION 1-LINE DIAGRAM
001033-A2-E2 ENGIN'D BY: DPE DRAWN BY: NRM DATE: 4-13-10