West Gate Multi-Use Path W Gate
Dr.
ree k
Legend
Br an ch
ck Ja
ey
s
Proposed MUP Project (11,255 LF)
k ee Cr
Proposed Sidewalk (500 LF)
!
Proposed Crosswalks
!
Existing Crosswalks
Pi n
ey
Existing Sidewalks Existing Greenway
^
Existing Bus Stop Major Obstacles (Environmental)
d. B lv
1/2
BRUNSWICK FOREST
E MIL
e For st P
NC 1
!
y. kw
! !
!! ! ! ! ! ! ! !! ! ! !
!
RD.
ick sw
!
33
FER BUF
n Bru
! !
!
RIVE R
Lo
try oun C w
` ^
Map of Proposed Project
!!! ! !
^ ^
Ja ck ey sC
STP-DA FUNDING APPLICATION TOWN OF LELAND, NC
17
²
! !
! !
0
500 1,000
2,000 Feet
Exhibit A: 11.14.14
! US
! !!
74 /7 6
! STP-DA FUNDING APPLICATION TOWN OF LELAND, NC
` ^
Closing A Gap Map
West Gate Multi-Use Path
Legend Proposed MUP Project (11,255 LF)
!! ! ! ! ! West Gate Dr.
NH
W
7 S1
!
Proposed Crosswalks
!
Existing Crosswalks Existing Sidewalks Existing Greenway
. NC 133
wy.
1M
!
ILE FE R BUF
E MIL 1.5
! ! ! !!! ! ! ! !!! !! ! ! ! !!
R RD
!!
RIVE
k st P Fore
FER BU F
ic k nsw Bru
E MIL 1/2
EA OC
U YE
Proposed Sidewalk (500 LF)
FE R BU F
! ! !
² 0
900 1,800
3,600 Feet
Exhibit B: 11.14.14
US
74 /7 6
STP-DA FUNDING APPLICATION TOWN OF LELAND, NC
` ^
Proximity of a School Map
West Gate Multi-Use Path
n BELVILLE ELEMENTARY SCHOOL
Legend Proposed MUP Project (11,255 LF) Proposed Sidewalk (500 LF)
West Gate Dr.
NH
W
7 S1
Proposed Crosswalks
n
Existing School
R RD
ILE
!!
FE R BUF
E MIL 1.5
RIVE
wy.
1M
. NC 133
k st P Fore
FER BU F
ic k nsw Bru
E MIL 1/2
EA OC
U YE
!
FE R BU F
² 0
900 1,800
3,600 Feet
Exhibit D: 11.14.14
STP-DA FUNDING APPLICATION TOWN OF LELAND, NC
` ^
Bicycle and Pedestrian Generator Map
West Gate Multi-Use Path West Gate Dr.
OC
N EA
HW
U YE
7 S1
Legend Proposed MUP Project (11,255 LF) Proposed Sidewalk (500 LF)
!
Proposed Crosswalks
Existing Land Use Public Park/Playground Residential Areas Shopping/Retail Areas Library Business Park/Office
1/2 ER
y. Pk w
!
RIVE R
RD.
est For
NC 1
F BUF
wick
33
E MIL
ns Bru
!
² 0
500 1,000
2,000 Feet
Exhibit E: 11.14.14
Town of Leland, NC 2015 STP-DA
ENGINEER'S OPINION OF PROBABLE COST GRANT SUBMITTAL
URS Project #: 31830051
2015 STP-DA Grant Submittal - Conceptual Opinion of Probable Cost LINE DESCRIPTION NUMBER 2 West Gate Multi-Use Path 2.01 Mobilization (3% of Line Items 2.02:2.11) 2.02 Erosion and Sediment Control Clearing and Grubbing (Medium Trees, Up to 12" Diameter, Cut and Chip, Grub 2.03 Stumps and Remove) 2.04 Aggregate Base Course (ABC Stone) 2.05 Asphalt Multi-Use Path (10' Wide, 2" Thick) Concrete Sidewalk along Rice Gate Way to Connect Multi-Use Path to Existing 2.06 Sidewalk (See Figure 1A for location of walkway; 5' Wide, 4" Thick) 2.07 Asphalt Pedestrian Crossing 2.08 Painted Crosswalk at End of Rice Gate Way Across Existing Dirt Access Road 2.09 Painted Crosswalk at Lillibridge Drive 2.10 Wooden Pedestrian Bridge (8' wide) 2.11 Wooden Boardwalk Crossing (8' wide) 2.12 Stormwater Management 2.13 Design Cost (18%) 2.14 Construction Administration (15%) 2.15 Permanent Easement/Right of Way Acquisition (Individual Parcels) 2.16 Overall Contingency (20%)
LABOR AND MATERIAL UNIT PRICE
UNIT
1 1
LS LS
$ $
18,580.00 $ 25,000.00 $
18,580.00 25,000.00
1
LS
$
30,000.00 $
30,000.00
3510 1401
TON TON
$ $
55.00 $ 60.00 $
193,050.00 84,060.00
278
SY
$
30.00
$
8,340.00
6 1 1 4000 2800 1
TON EA EA SF SF LS
$ $ $
55.00 300.00 300.00
$ $ $
45.00 35.00 30,000.00
2
EA
$
25,000.00
$ $ $ $ $ $ $ $ $ $ $
330.00 300.00 300.00 180,000.00 98,000.00 30,000.00 120,233.00 100,194.00 50,000.00 187,677.00 1,126,064.00
West Gate Multi-Use Path =
Multi-Use Path
11/14/2014
TOTAL LABOR AND MATERIALS
QTY
Page 2 of 3