Massing Concepts - Arlingtonva

Report 1 Downloads 256 Views
Massing Concepts November 10, 2015

1

Items for Consideration and Direction  Which of the two massing concepts should be pursued?  Affirm joint use by County and APS  Funding allows for 150 surface parking spaces. Should underground

parking be considered?  Should County staff consider using ‘Construction Manager at Risk’ for project delivery?

2

Overview

 FY 2015-2024 CIP Funding for LRCC Replacement: $28 M  Early Community Vision Sessions held in April 2015:  Preserve and maximize green space  Improve site access and safety  Integrate the building into the park  Include multi-purpose athletic courts, exercise rooms, fitness and multi-purpose flexible use spaces  County and School Board direction in July 2015:  Explore the possibility of including Pre-K classrooms  Shared amenities to serve APS and community programs  APS Program: 4 Pre-K classrooms and support space 3

Conceptual Studies

 Site arrangement and building massing  APS spaces direct access to dedicated playground and ground level exits  DPR entries from N George Mason and park sides  DPR outdoor spaces increased  DPR consolidations – admin functions, Sr. Center from Culpepper Gardens  Surface parking – 150 spaces  Case 1 – APS dedicated rec space, Case 2 – shared gym Case – Areas

DPR

APS

Shared

Total

Concept Est $ M

1 – APS rec space

31,000

12,000

2,000

45,000

$29.5

2 - Shared gym

29,000

8,000

16,000

53,000

$34.7

4

Case 1 Spaces Upper Level (DPR Administrative Program) Main Level (open to Park side)

Lower Level (open to GM Drive)

5

Case 1 Site Plan – From Park

150 Car Parking Lot

6

Case1 - George Mason Frontage

7

Case 2 Spaces Upper Level (DPR Administrative Program)

Main Level (open to Park side)

Lower Level (open to GM Drive)

8

Case 2 Site Plan – From Park

150 Car Parking Lot

9

Case 2 – George Mason Frontage

10

Timeline  Spring –Fall: 2015 Concept development, Joint Use program defined  Fall, 2015: Board Guidance: Joint use, building size, parking  Winter 2015-Winter 2016  A/E selection  Community engagement  MOU with APS  CMAR selection (if alternate delivery method used)  Design completion  Fall 2016 Bond Referendum for construction  Spring 2017-Spring 2019 Construction  Summer 2019 Opening 11