Say goodbye to knitter’s block WINTER WEEKEND HAT | KNIT
INTERMEDIATE
Shape crown: Work rnds 5 to 13 of Chart, switching to double-pointed
SIZE
needles when appropriate. 26 sts
One size to fit average Man's head.
rem. Break yarn, leaving a long end. Draw end tightly through rem
GAUGE
loops and fasten securely.
“Chart=I”4" [10 cm] in 18 sts and 24 rows stocking st with larger 13needles. INSTRUCTIONS
“Chart II” 13
11
11
9
9
With smaller circular needle and 7
MC, cast on 94 sts. Join in rnd,
7
5
5
3
3
1
1
placing marker on first st.
1st rnd: *K1tbl. P1. Rep from * around. Break MC. Join A. With A, rep last 6-strnd rep (K1tbl. P1)
4-st rep
ribbing for 3" [7.5 cm]. MATERIALS
Main Color (MC) Change to larger=circular needle.
= Main Color (MC)
Bernat Super Value™ (7 oz/197 g; 426 yds/389 m) Main Color (MC) Navy (07711) 1 ball Contrast A Lush (53246) 1 ball
= Contrast A Rep Next rnd: K2. Kfb. *K8. Kfb.
= Contrast A
= With from * to last 2 sts. K2. MC, 104 K2tog sts.
= With MC, K2tog
®
Sizes U.S. 7 (4.5 mm) and U.S. 8 (5 mm) circular knitting needles 16" [40 cm] long. Set of four size U.S. 8 (5 mm) double-pointed knitting needles or size needed to obtain gauge. Stitch marker. ABBREVIATIONS: www.yarnspirations.com/abbreviations K1tbl = Knit next stitch through back loop Approx = Approximate(ly) P = Purl Beg = Beginning Rem = Remain(ing) Cont = Continue(ity) Rep = Repeat Kfb = Increase 1 stitch by knitting into Rnd(s) = Round(s) front and back of next stitch St(s) = Stitch(es) K = Knit
= With A, K2tog
= With A, K2tog
Work 1st of 4th rnds of Chart,
reading rnds from right to left, noting 4-st rep will be worked 26 times. Rep 1st of 4th rnds of Chart until Hat from beg measures approx 8" [20.5 cm]. WINTER WEEKEND HAT | KNIT