mr credit 3: materials reuse

Report 0 Downloads 103 Views
LEED 2009 for Retail: New Construction and Major Renovations

MR CREDIT 3: MATERIALS REUSE All fields and uploads are required unless otherwise noted.

ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Download, complete, and upload Materials and Resource Calculator (found under "Credit Resources") to document sustainable criteria values for MR Credits 3-7. Upload L-10. Provide the complete Materials and Resource Calculator.

Upload

Files:

0

Provide the following information from "Tab C.Summary" of the Materials and Resource Calculator. Total materials cost for the LEED project:

$

Table MRc3-1. Summary for Materials Reuse Total value of salvaged, refurbished or reused materials Reused material value as a percentage of total materials cost

Must be at least 5% for 1 point, 10% for 2 points, 15% for exemplary performance

ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.

SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload MRc3-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)

LEED 2009 for Retail: New Construction and Major Renovations MR Credit 3: Materials Reuse

Upload

Files:

0

Page of

Version 1.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.

The project team is using an alternative compliance approach in lieu of standard submittal paths and/or documentation.

ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the credit intent and requirements. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.

Upload MRc3-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)

Upload

Files:

0

SUMMARY MR Credit 3: Materials Reuse Points Documented:

0

MR Credit 3: Materials Reuse Exemplary Performance Documented:

N

The project team reserves one point in the Innovation in Design credit category for exemplary performance in MR Credit 3.

LEED 2009 for Retail: New Construction and Major Renovations MR Credit 3: Materials Reuse

Page of

Version 1.0 Copyright © 2009 U.S. Green Building Council. All Rights Reserved.