MR CREDIT 7: CERTIFIED WOOD All fields and uploads are required unless otherwise noted.
ALL OPTIONS This static sample form has been modified for offline access. All sections of the form are visible. Sample forms are for reference only. Download, complete, and upload Materials and Resource Calculator (found under "Credit Resources") to document sustainable criteria values for MR Credits 3-7. Upload L-10. Provide the completed Materials and Resource Calculator (found under "Credit Resources").
Upload
Files:
0
Files:
0
Provide the following information from "Tab C. Summary" of the Materials and Resource Calculator. Table MRc7-1. Summary for Certified Wood Sustainable criteria value of new wood products that are FSC-Certified ($) Total new wood materials cost Certified wood content value as a percentage of new wood cost (%)
Must be at least 50% to document 1 point, 95% to document exemplary performance
Percentage of MRc7 materials with cutsheets provided (by cost) Must be at least 100% to document credit compliance
Upload MRc7-1. Provide vendor invoices for all new wood products on a line item basis. Include the value ($) of each product as well as vendor's COC certificate numbers for all FSC certified wood.
Upload
Wood-based products that are included in MR Credit 7 are not considered salvaged, reused, or recycled.
ADDITIONAL DETAILS Special circumstances preclude documentation of credit compliance with the submittal requirements outlined in this form.
SPECIAL CIRCUMSTANCES Describe the circumstances limiting the project team's ability to provide the submittals required in this form. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload MRc7-SC. Provide any additional documentation that supports the claim to special circumstances. (Optional)
Upload
Files:
0
The project team is using an alternative compliance approach in lieu of standard submittal paths and/or documentation.
ALTERNATIVE COMPLIANCE PATH Describe the alternative compliance path used by the project team. Include justification that this path meets the credit intent and requirements. Be sure to reference what additional documentation has been provided, if any. Non-standard documentation will be considered upon its merits.
Upload MRc7-ACP. Provide any additional documents that support the alternative compliance path approach. (Optional)