MU-ESW1 Exploration Well (7” csg)

7-1/16" 10M master valve and casing head w/ 2-1/16" 10M s/o valves

Drawn by GRG ver. 12 April 2017

18", .25" WT, line pipe conductor @ 40' (should drift 17.5")

17-½” hole to ± 300', 13-3/8", 54.5#, K-55, BTC casing

1,000

2,000

Depth (ft)

3,000

12-¼” hole to ±2100', 9-5/8" 40# K-55, AD to 8-¾”, BTC casing

6,800 Core #1: 6,800'-6,830'

4,000

6,900

5,000

7,000

Test zone #2 (perforated 4 jspf): 6,800'-6,830' Bridge plug @ 6,850' for test #2

Core #2: 6,970'-7,000'

7,060

Test zone #1: 6,900'-7,060'

6,000 est. top of reservoir @ 6,500'

7,000

8-¾” hole to ± 7,060' and sand back to 6,900', 7" , 29#, L80, BTC casing @ 6,900' Clean out w/ 6” bit to 7,060'

7,500