NCAT Pavement Test Track

Report 0 Downloads 38 Views
3/5/2018

Combining RAP, RAS, and WMA at Your Plant Session Code T33 Buzz Powell

NCAT Pavement Test Track

Combining RAP, RAS, and WMA at Your Plant

1

3/5/2018

Content • • • • • • APAI – 12/2/08

Milling RAP RAS WMA Combinations Experience 4

Milling → RAP • • • • • •

Milling to remove distresses in aged layer(s) Restore cross slopes & improve smoothness Maintain geometry (curbs, inlets, bridges) Reclaim/reuse valuable raw materials Reduce the cost of new surface mix(es) Burden of RAP mountains in urban markets.

APAI – 12/2/08

5

Improved Mill/RAP Practices

2

3/5/2018

RAP Mix Design • Tier 1: Up to 15% RAP – use specified binder grade • Tier 2: 15%-25% RAP – One full binder grade lower (e.g., PG64-22→PG58-28) • Tier 3: Over 25% RAP – Extract, recover, and grade RAP binder (assumptions) – use blending charts to determine required grade • We should expect RAP to change with each reuse.

NCAT Pavement Test Track

High RAP Mixes and Virgin AC Grade

45% RAP PG58-28

20% RAP PG67-22

45% RAP PG67-22

20% RAP PG76-22

45% RAP PG76-22

3

3/5/2018

RAS Mix Design Shingle binders are stiffer than paving grade binders Post consumer shingles (PC-RAS) are also rooftop aged Shingles must be processed for use in HMA plants “Deleterious materials” must be removed from PC-RAS Mixing must occur at or above extracted binder grade Volumetrics may not be representative of mix quality Caution of volumetric changes with storage time Practical limits on aged binder content from RAS Need for a dedicated feed system for very low rates.

• • • • • • • • •

RAS Mix Design

Why Warm Mix ? • • • • • •

Less energy needed for mix production Fewer emissions from asphalt plants Less fumes & odors for paving crew, neighbors Workability/compaction at lower, equal temps Longer hauls, extended paving season Improved smoothness on crack sealing.

APAI – 12/2/08

12

4

3/5/2018

Warm Mix Options • Organic Additives • Chemical Additives • Asphalt Foaming Technologies – Foaming additives – Water Injection Systems

• Combinations of above.

APAI – 12/2/08

13

Warm Mix Concerns • • • • • • •

Burner efficiency, recalibration Adequate drying of the virgin aggregates Condensation in the baghouse Increased/over amperage of plant motors Starting hot and reducing temperatures When/how to dose with additives Institutional commitment to utilization.

APAI – 12/2/08

14

Warm Mix Energy Savings 40 39 38 37

Burner Setting (%)

36 35 34 33

8%

6%

32 31 30 29 28 27 26 25 10:33 AM

10:48 AM

11:02 AM

11:16 AM

11:31 AM

11:45 AM

12:00 PM

12:14 PM

12:28 PM

12:43 PM

12:57 PM

Time of Production on 7/3/09

APAI – 12/2/08

15

5

3/5/2018

Warm Mix Emissions Reductions

8% fuel→10% CO2

APAI – 12/2/08

16

WMA Mix Design • Drop in additive technologies – Mixing/compaction temps via technology provider

• Lab foamers are recommended, but… – No way to replicate proprietary technologies

• NCHRP 9-43 “Volumetrics Plus” approach – Compactability (N92comp-30F / N92comp ≤ 1.25) – T283 (≥ 80 percent) and coating test for moisture – FN with criteria as function of traffic – Mix above PG grade of recycled materials. APAI – 12/2/08

17

Combining RAP and Warm Mix • Superheating reduces baghouse concerns – Improved flights and variable speed drives

• Superheating improves virgin aggregate drying – Ideal to stay below the liquid asphalt flash point

• Superheating makes cold starts easier • RAP improves WMA moisture damage susceptibility • Greatest economic & environmental benefit. APAI – 12/2/08

18

6

3/5/2018

2009 GE+ Fatigue Expectations Actual

10 million ESAL strain cycles

19

High RAP Mixes and WMA

Virgin HMA

50% RAP HMA

Virgin WMA-F

50% RAP WMA-F

Virgin WMA-A

Strategic Use of RAP, RAS, GTR, & WMA Purpose of Each Layer

N5 Control

S5 Higher RAP

S6 RAP+RAS

Durable, Rut 20% RAP20 25% RAP11 5% RAS21 Resistant Surface 67-22/82-16 DG 67-22/76-22 SMA 67-22/88-16 SMA

S13 Recyc Tires VIRGIN 82-2212 SMA

Stiff, Strain 35% RAP39 Reducing Middle 67-22/88-10 DG

50% RAP41 67-22/82-16 DG

50% AGED26-24 67-22/94-10 DG

35% RAP37 82-2212 DG

Fatigue Resistant 35% RAP39 Base Layer 67-22/88-10 DG

35% RAP34 94-28/94-10 DG

25% RAP24 +76-22/88-16 DG

VIRGIN 88-2220 AZ

Green = Evotherm Q1 Additive, Blue = Astec Green Foamer

7

3/5/2018

Targeted Use of RAP, RAS, and GTR Control

GTR RAP+RAS

RAPDebonded

RAPRebuilt

Lee Road 159 Low Traffic Preservation

Benefit of Preservation (PG)

MAP-21 Banded Pretreatment Condition Green = “Good” (< 5% of lane cracked) Yellow = “Fair” (5% ≤ 20% of lane cracked) Red = “Poor” (> 20% of total lane area cracked)

8

3/5/2018

Benefit of Preservation (PG)

PG Thinlay Cracking Performance

US-280 High Traffic Preservation

9

3/5/2018

Mix Design • • • • • • • •

Cost of liquid asphalt Total vs aged vs virgin binder content Voids in mineral aggregate Blended bulk specific gravity Design compactive effort Shape of gradation curve Nominal maximum aggregate size Rutting vs cracking/durability.

Mix Design

RAP11+RAS3 Thinlays20 on Cold Recycle CCPR Foam

No Rutting

Emulsion

No Cracking CIR

10

3/5/2018

Cold Climate Sections

Minnesota Preservation Sections (PG)

710 ADT with 8% Heavy Commercial

16,500 ADT with 3% Heavy Commercial

20% Aged Binder Thinlay on US-169

11

3/5/2018

Cracking Group (CG) Experiment

Southern Cracking Group (CG)

Summary • • • • • • • •

100% use of all RAP in the most cost effective way Cold recycle & hot and/or warm mix asphalt Careful use of sustainable clean, processed PC-RAS Strategic selection of warm mix technologies Aged agency verification of balanced mix designs Production testing using same-day practices Emerging rejuvenator & equipment technologies Optimize both sustainability and life cycle cost.

12

3/5/2018

High Friction Surface Treatments

37

http://www.omnicrete.com.au/road-safety-surfacing/

Thank You

Session Evaluations/PDH’s

See you again at:

• Professional Development Hours logged in session feedback.

• World of Asphalt 2019

• Complete session feedback in mobile app.

• February 12-14, 2019 • Indianapolis, IN

• CONEXPO – CON/AGG 2020 • March 10-14, 2020 • Las Vegas, NV • 140+ education sessions

• Answer “Yes” to last questions for PDH’s

#WorldofAsphalt

13