New Jersey Office Of Clean Energy Direct Install Program

Report 0 Downloads 141 Views
New Jersey Office Of Clean Energy Direct Install Program Project: Township of Chester The total cost of the proposed project is: The NJ Clean Energy Incentive covers: The cost to your municipality is: The EECBG Rebate (not shown in the project details) covers: The total cost to your municipality, including the EECBG Rebate is:

$91,412.18 $54,847.30 $36,564.88 $36,564.88 $0.00

The estimated annual energy savings associated with this project is: Therefore, the estimated payback period for these measures is:

$21,617.93 0 months

Materials Needed For Project Submission: Scope Of Work Attachment - signed - 1 per facility Direct Install Contractor Agreement - signed X

Energy Efficiency and Conservation Block Grant Rebate Program Application Form - 2011

X

2011 Direct Install Program Application and Participation Agreement - signed - 1 per facililty Gas Bill - Winter 2010 - all pages attached Electric Bill - Summer 2010 - all pages attached

(60%) (40%) (40%) (0%)

Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool

TRC Energy Services

General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:

Township of Chester RJ Donnelly Municipal Complex 1 Parker Rd

Facility Type: Office- Large Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:

City / Zip Code: Chester Will the project receive EECBG funding?:

Year Constructed: Tax Exempt?:

Y

ELECTRIC UTILITY INFORMATION

Y

GAS UTILITY INFORMATION

Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.17 Total Taxes + Fees on Bill:

Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: 1 Billing Period Total Cost: $1.22 Total Taxes + Fees on Bill:

Project Summary Electric - Average Cost ($/kWh):

Gas - Average Cost ($/Therm):

$0.170 kWh Saved per Year

Annual Savings

Total Measure Estimated Total Cost to Cost Incentive Amount Customer

$1.22 Simple Payback (Yrs)

Refrigeration Measures Total:

15,407 $ $ 3,510 $ $

2,619.19 596.70 -

$ $ $ $

7,756.76 2,142.86 -

$ $ $ $

4,654.05 $ $ 1,285.71 $ $

3,102.70 857.14 -

1.18 1.44 -

TOTAL ELECTRIC MEASURES:

18,917 $

3,215.89

$

9,899.61

$

5,939.77

3,959.85

1.23

3,215.13

$

39,078.86

$

23,447.31

$ 15,631.54

4.86

Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total:

$

Therms /yr. TOTAL GAS MEASURES:

2,635 $ Gallons/yr.

TOTAL OIL MEASURES:

-

$

-

$

-

$

-

$

-

-

$

-

$

-

$

-

$

-

-

$

-

$

-

$

-

$

-

-

Oil Gallons/yr. Gas Therms/yr. -

CONVERSION MEASURES:

Gallons/yr.

(OIL TO GAS)

TOTAL PROPANE MEASURES:

-

COMBINED PROJECT TOTALS: $

6,431.02

$

48,978.47

$

29,387.08

$ 19,591.39

PROJECT TRC TEST:

Percentage of Energy Savings Per Measure Category

Lighting

Percentage of Dollar Savings Per Measure Category

HVAC

Lighting

Gas

Gas

2/8/2011

3.05 2.97

Percent Reduction in Total Energy Consumption

50.0%

HVAC

Project Summary

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool Lighting Measures Default Annual Oper. Hours

Actual Annual Oper. Hrs

Fixture Location

(if different)

1

2,808

Council Chambers / Kitchen

2

2,808

Assistant to Assesor

3

2,808

Front Hallway

5

2,808

Mary's Office

6

2,808

Admin's Office

7

2,808

Copy Room

8

2,808

Bathroom

9

2,808

Closet

10

2,808

Vault

11

2,808

Stairwell (back)

12

2,808

Stairwell (back)

13

2,808

Planning

14

2,808

Planning Office

15

2,808

Bathroom

16

2,808

Construction

19

2,808

Attic

20

2,808

Basement

21

2,808

Basement #2

22

2,808

Basement #2

Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing

Fixture Controlled?

Lighting Measure Description

N Y N Y N N N N N Y N Y N Y N N N Y N N N N N N N Y N Y N Y N N N N N N N

Halogen Incandescent, (1) 50W lamp CF 9-1L SCREW IN CFL Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 4-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 65W lamp CF 13-1L SCREW IN CFL Incandescent, (1) 65W lamp CF 13-1L SCREW IN CFL Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 65W lamp CF 13-1L SCREW IN CFL Fluorescent, (4) 48", STD lamp 4' T8 4-lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 4-lamp with EB Incandescent, (1) 100W lamp CF 22-1L SCREW IN CFL Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 100W lamp CF 22-1L SCREW IN CFL Incandescent, (1) 100W lamp CF 22-1L SCREW IN CFL Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (4) 48", STD lamp

Actual # of Default Ceiling Watts per Fix- Watts per Height Fixture (if tures Fixture >12 ft? different)

9 9 2 2 4 4 8 8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 4 6 6 1 1 4 4 4 4 6 6 1 1 2 Lighting

2/8/2011

Total Cost

50 11 94 59 94 59 94 59 188 112 94 59 65 15 65 15 173 109 94 59 65 15 188 112 188 112 100 26 94 59 100 26 100 26 94 59 188

Est. Demand Annual kWh Savings Savings (kW)

Lighting Notes:

N

$

288.20

0.3

807

N

$

137.42

0.1

161

N

$

274.83

0.1

460

N

$

549.67

0.2

920

N

$

85.67

0.1

175

N

$

68.71

0.0

80

N

$

32.43

0.0

115

19A

N

$

32.43

0.0

164

19A

N

$

110.41

0.1

147

N

$

68.71

0.0

115

N

$

32.43

0.0

164

N

$

342.67

0.2

999

N

$

514.01

0.4

1,049

N

$

32.83

0.1

170

N

$

274.83

0.1

322

N

$

131.31

0.2

972

N

$

196.96

0.4

1,459

N

$

68.71

0.0

115

N

$

171.34

0.1

499

Municipal Building - MR-16

19A

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

22

2,808

23

2,808

25

2,808

29

2,808

31

2,808

33

2,808

35

2,808

36

2,808

Basement #2

Proposed Existing Basement #2 Proposed Existing Municipal Office - Exit Signs Proposed Existing Squad Room / Kitchen Proposed Existing Cells Proposed Existing Attic Proposed Existing Stairwell Proposed Existing Police Office - Exit Signs Proposed

N N N N N N Y N N N N N N N N

4' T8 4-lamp with EB Incandescent, (1) 100W lamp CF 22-1L SCREW IN CFL EXIT Incandescent, (2) 20W lamp LED EXIT Sign w/ Batt. Backup Incandescent, (1) 65W lamp CF 13-1L SCREW IN CFL Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Incandescent, (1) 100W lamp CF 22-1L SCREW IN CFL Incandescent, (1) 100W lamp CF 22-1L SCREW IN CFL EXIT Incandescent, (2) 20W lamp LED EXIT Sign w/ Batt. Backup

2 5 5 3 3 1 1 2 2 1 1 1 1 2 2

112 100 26 40 2 65 15 151 89 100 26 100 26 40 2

N

$

171.34

0.1

499

N

$

164.13

0.3

1,216

N

$

397.38

0.1

375

N

$

32.43

0.0

115

N

$

154.92

0.1

407

N

$

32.83

0.1

243

Y

$

42.93

0.1

243

N

$

264.92

0.1

250

$

4,503.07

3.2

11,743

TOTALS:

Flood

Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls

Fixture Location

Est. Actual Annual Annual Hrs. w/ Hours Controls (if different)

Lighting Controls Measure Description

Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed

Total Cost

Est. Demand Annual kWh Savings Savings (kW)

1

2,808

9

Council Chambers / Kitchen

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

99

$

171.25

0.0

98

2

2,808

2

Assistant to Assesor

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

118

$

171.25

0.0

116

4

2,808

2

Tax Assesor's Office

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

178

$

171.25

0.0

175

6

2,808

1

Admin's Office

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

112

$

171.25

0.0

110

7

2,808

1

Copy Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

59

$

171.25

0.0

58

8

2,808

1

Bathroom

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

15

$

171.25

0.0

15

10

2,808

1

Vault

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

109

$

171.25

0.0

107

14

2,808

6

Planning Office

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

672

$

171.25

0.1

662

15

2,808

1

Bathroom

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

26

$

171.25

0.0

26

16

2,808

4

Construction

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

236

$

171.25

0.1

233

17

2,808

3

Construction Official

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

267

$

171.25

0.1

263

18

2,808

3

Emer. Management

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

267

$

171.25

0.1

263

24

2,808

6

Conference Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

534

$

171.25

0.1

526

26

2,808

1

Women's Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

62

$

171.25

0.0

61

Lighting 2/8/2011

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

26

2,808

1

Women's Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

62

$

171.25

0.0

61

27

2,808

4

Det Bureau

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

28

2,808

4

Lt Martini

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

356

$

171.25

0.1

351

29

2,808

1

Squad Room / Kitchen

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

15

$

171.25

0.0

15

32

2,808

2

Conference Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

178

$

171.25

0.0

175

34

2,808

1

Women's Locker

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

59

$

171.25

0.0

58

$

3,253.68

0.8

3,664

TOTALS:

Notes:

Lighting 2/8/2011

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool Gas, Oil, and Propane HVAC Measures Climate Zone

Measure Location

Measure Description

Existing Oil-toAge of Unit Gas # of Existing Capacity Conver- Units Equipment (thousand (Yrs.) sion?

Total Cost

Natural Gas Savings (therms /yr)

BTU/hr)

1

Newark

Municipal - Attic

Gas-Fired Furnace

N

1

115

18

$

6,100.95

185.1

2

Newark

Municipal - Basment

Gas-Fired Furnace

N

2

115

17

$

12,201.90

370.3

3

Newark

Municipal - Basment

Gas-Fired Furnace

N

1

95

19

$

5,720.00

173.3

4

Newark

Police - Furnace Room

Gas-Fired Furnace

N

2

95

19

$

11,440.00

346.6

$

35,462.86

1,075.4

TOTALS

Notes:

HVAC 2/8/2011

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool HVAC Control Measures Measure Description

Controlled Cooling OperaUnit # of Units Energy tionally Cooling Installed Efficiency Tested? Capacity Ratio (EER)

Measure Location

Annual kWh Savings

Total Cost

(Tons)

$

Measure Description

Annual HVAC Unit Fuel # of Units Capacity HVAC Fuel Usage Installed (thousand Source (therms,

Measure Location

BTU/hr)

1

-

Total Cost

gallons or KWh /yr)

-

Annual kWh Savings

Est. Demand Savings (kW) -

Nat. Gas Savings (therms /yr)

Municipal - Attic

1

115

Gas

2,000

$

602.67

-

260.0

Municipal - Basment

2

115

Gas

4,000

$

1,205.33

-

520.0

Municipal - Basment

1

95

Gas

2,000

$

602.67

-

260.0

4

Police - Furnace Room

2

95

Gas

4,000

$

1,205.33

-

520.0

5

Outside - Muni

3

60

Electric

15,000

$

1,071.43

1,950

Outside - Muni

1

48

Electric

4,000

$

357.14

520

Outside - Police

2

48

Electric

8,000

$

714.29

1,040

# of Units Installed

Annual HVAC Electric Usage (kWh)

Gas, Oil, Primary or LPG Fuel Usage Source for (therms or Heating gal./yr)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

# of Units Installed

Days per Year Facility Operates

Hot Water Current Fuel Flow Rate Source (gal./min)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

Pipe Diameter

Pipe Length

Total Cost

(inches)

(feet)

Annual kWh Savings

Nat. Gas Savings (therms /yr)

1,950

1,560.0

2 3

6

Electronic Fuel-Use Economizers (for Forced Air Heat)

Electronic Fuel-Use Economizers (for AC)

7

Measure Description

Measure Location

Hot Water Demand Control Measures Measure Description

Measure Location

Measure Description

Measure Location

TOTALS

Hot Water Fuel Source

Low or High Temp Piping?

$

4,687.43

Notes:

HVAC & HW Controls Measures 2/8/2011

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

Savings values are estimates. Actual savings will vary. Incentives and participation subject to program rules and Participation Agreement.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool

TRC Energy Services

General Project Information Participating Customer: Contractor / Project #: Facility Name: Street Address:

Township of Chester RJ Donnelly Telcordia Building 100 North Rd

Facility Type: Office- Large Total Facility Square Footage: Avg Weekly Hrs of Operation: # of Full-Time Employees:

City / Zip Code: Chester Will the project receive EECBG funding?:

07930 Y

Year Constructed: Tax Exempt?:

ELECTRIC UTILITY INFORMATION

Y

GAS UTILITY INFORMATION

Electric Provider: <Select Electric Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period kWh Consumption: 1 Billing Period Total Cost: $0.17 Total Taxes + Fees on Bill:

Gas Provider: <Select Gas Provider> Service Class: Account #: Billing Period Start Date: Billing Period End Date: Billing Period Therm Consumption: 1 Billing Period Total Cost: $1.22 Total Taxes + Fees on Bill:

Project Summary Electric - Average Cost ($/kWh):

Gas - Average Cost ($/Therm):

$0.170 kWh Saved per Year

Lighting Measures Total: Motors & VFD Measures Total: HVAC Electric Measures Total: Refrigeration Measures Total: TOTAL ELECTRIC MEASURES:

Annual Savings

Total Measure Estimated Total Cost to Cost Incentive Amount Customer

$1.22 Simple Payback (Yrs)

76,274 $ 12,966.51 $ $ $ -

$ $ $ $

38,711.80 -

$ $ $ $

23,227.08 $ 15,484.72 $ $ $ -

1.19 -

76,274 $

12,966.51

$

38,711.80

$

23,227.08

$ 15,484.72

1.19

2,220.40

$

3,721.90

$

2,233.14

$

0.67

Therms /yr. TOTAL GAS MEASURES:

1,820 $

1,488.76

Gallons/yr. TOTAL OIL MEASURES:

-

$

-

$

-

$

-

$

-

-

$

-

$

-

$

-

$

-

-

$

-

$

-

$

-

$

-

-

Oil Gallons/yr. Gas Therms/yr. CONVERSION MEASURES:

-

Gallons/yr.

(OIL TO GAS)

TOTAL PROPANE MEASURES:

-

COMBINED PROJECT TOTALS: $

15,186.91

$

42,433.70

$

25,460.22

$ 16,973.48

PROJECT TRC TEST:

Percentage of Energy Savings Per Measure Category

Percentage of Dollar Savings Per Measure Category

1.12 3.33

Percent Reduction in Total Energy Consumption

Gas

50.0%

Gas Lighting

2/9/2011

Lighting

Project Summary

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool Lighting Measures Default Annual Oper. Hours

Actual Annual Oper. Hrs

Fixture Location

(if different)

1

2,808

Entrance

2

2,808

Reception

3

2,808

Council Room

4

2,808

Council Room

5

2,808

Back Entrance

6

2,808

Water Room

7

2,808

Closet Behind Desk

8

2,808

Hallway

9

2,808

Hallway

10

2,808

Men's Room

11

2,808

Men's Room

12

2,808

Women's Room

13

2,808

Women's Room

14

2,808

NJDEP

15

2,808

Office (rt)

16

2,808

Office (rt 2)

17

2,808

Office (left)

18

2,808

Men's Room

19

2,808

Side Entrance

Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing

Fixture Controlled?

Lighting Measure Description

N N N N N N N N N N N Y N Y N N N N N N N N N N N N N N N Y N Y N N N N N

Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (1) 48", STD lamp 4' T8 1-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (2) U-Tube, STD lamp

Actual # of Default Ceiling Watts per Fix- Watts per Height Fixture (if tures Fixture >12 ft? different)

2 2 6 6 30 30 10 10 1 1 1 1 1 1 13 13 1 1 2 2 2 2 2 2 2 2 8 8 4 4 4 4 8 8 1 1 2 Lighting

2/9/2011

Total Cost

96 31 96 31 96 31 57 31 151 89 96 31 96 31 96 31 151 89 96 31 151 89 96 31 151 89 188 83 151 89 151 89 151 89 96 31 96

62 62 62

62 62 62

62

62

62

Est. Demand Annual kWh Savings Savings (kW)

N

$

157.17

0.1

223

N

$

471.51

0.2

670

N

$

2,357.53

0.8

3,351

N

$

664.97

0.2

854

N

$

77.46

0.0

204

N

$

78.58

0.0

78

N

$

78.58

0.0

78

N

$

1,021.60

0.4

1,452

N

$

77.46

0.0

204

N

$

157.17

0.1

223

N

$

154.92

0.1

407

N

$

157.17

0.1

223

N

$

154.92

0.1

407

N

$

1,114.42

0.7

2,760

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

619.66

0.4

1,630

N

$

78.58

0.0

112

N

$

157.17

0.1

223

Lighting Notes:

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

19

2,808

Side Entrance

20

2,808

Office (rt)

21

2,808

Office (left)

22

2,808

Office (rt 2)

23

2,808

Office (left 2)

24

2,808

Office (left 3)

25

2,808

Office (left 4)

26

2,808

Copy Room

27

2,808

Office (rt 3)

28

2,808

Office (left 5)

29

2,808

Office (rt 4)

30

2,808

Women's Room

31

2,808

End of Office Pool

32

2,808

End of Office Pool

33

2,808

Basement (copy)

34

2,808

Basement (copy)

35

2,808

Kitchen

36

2,808

Stairwell to basement

37

2,808

Boiler Room

38

2,808

Shower

39

2,808

Basement (copy)

40

2,808

Water Treatment

41

2,808

Equip Room

42

2,808

Equip Room

43

2,808

Hallway

44

2,808

Hallway

Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing Proposed Existing

N N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N N N N N N N N N N N N N N N N N N N N N N N N N N N N N

2' T8 U-Lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (3) 48", STD lamp 4' T8 3-lamp with EB Incandescent, (1) 65W lamp CF 13-1L SCREW IN CFL Incandescent, (1) 120W lamp CF 26-1L SCREW IN CFL Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 120W lamp CF 26-1L SCREW IN CFL Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (2) U-Tube, STD lamp

2 4 4 4 4 4 4 4 4 4 4 4 4 2 2 4 4 4 4 4 4 1 1 2 2 6 6 4 4 12 12 2 2 2 2 3 3 1 1 3 3 2 2 8 8 2 2 2 2 7 Lighting

2/9/2011

31 151 89 151 89 151 89 151 89 151 89 151 89 151 89 151 89 151 89 151 89 151 89 96 31 151 89 65 15 120 28 94 59 94 59 120 28 94 59 188 83 188 83 94 59 173 109 188 83 96

62

62

N

$

157.17

0.1

223

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

154.92

0.1

285

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

309.83

0.2

570

N

$

77.46

0.0

204

N

$

157.17

0.1

223

N

$

464.75

0.3

1,222

N

$

129.70

0.2

657

19A

N

$

434.94

0.9

3,627

R30

N

$

137.42

0.1

230

N

$

137.42

0.1

230

N

$

108.73

0.2

907

N

$

68.71

0.0

115

N

$

417.91

0.3

1,035

N

$

278.60

0.2

690

N

$

549.67

0.2

920

N

$

220.82

0.1

421

N

$

278.60

0.2

690

N

$

550.09

0.2

782

Long hallway of offices

R30

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

44

2,808

45

2,808

46

2,808

47

2,808

48

2,808

49

2,808

50

2,808

51

2,808

52

2,808

53

2,808

54

2,808

55

2,808

56

2,808

57

2,808

58

2,808

59

2,808

60

2,808

61

2,808

62

2,808

63

2,808

64

2,808

Hallway

Proposed Existing Room Left Proposed Existing End Room Proposed Existing Room Right Proposed Existing Air Handler Room Proposed Existing Open Room (front) Proposed Existing Closet Proposed Existing Back Room Proposed Existing Generator Room Proposed Existing Generator Room Proposed Existing Side Hallway Proposed Existing Rescue Squad - First Room Proposed Existing Rescue Squad - Office Proposed Rescue Squad - Meeting Existing Rooom Proposed Existing Recscue Squad Garage Proposed Existing Recscue Squad Garage Proposed Existing Rescue Squad - Kitchen Proposed Existing Boiler Room #2 Proposed Existing Parts Room Proposed Existing Food Pantry Proposed Existing Exit Signs Proposed

N N N N N N N N N N N N N N N N N N N N N N N N Y N N N N N N N N N N N N N N N N

2' T8 U-Lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (4) 48", STD lamp 4' T8 3-lamp with EB plus reflector Fluorescent, (2) U-Tube, STD lamp 2' T8 U-Lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 96", STD lamp 8' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Incandescent, (1) 120W lamp CF 26-1L SCREW IN CFL Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB Fluorescent, (2) 48", STD lamp 4' T8 2-lamp with EB EXIT Incandescent, (2) 20W lamp LED EXIT Sign w/ Batt. Backup

7 18 18 6 6 16 16 2 2 9 9 1 1 14 14 5 5 1 1 2 2 14 14 4 4 18 18 6 6 17 17 2 2 2 2 21 21 24 24 13 13

31 188 83 188 83 188 83 94 59 188 83 188 83 188 83 188 83 96 31 94 59 94 59 94 59 94 59 94 59 173 109 94 59 120 28 94 59 94 59 40 2

62

62

N

$

550.09

0.2

782

Y

$

2,908.81

1.5

6,209

N

$

835.81

0.5

2,070

N

$

2,228.84

1.3

5,519

N

$

137.42

0.1

230

N

$

1,253.72

0.8

3,105

N

$

139.30

0.1

345

N

$

1,950.23

1.2

4,829

N

$

696.51

0.4

1,725

N

$

78.58

0.0

112

N

$

137.42

0.1

230

Y

$

1,234.63

0.4

1,610

N

$

274.83

0.1

322

N

$

1,236.76

0.5

2,070

Y

$

529.13

0.2

690

Y

$

2,323.44

0.9

3,574

N

$

137.42

0.1

230

N

$

72.49

0.1

605

N

$

1,442.88

0.6

2,415

N

$

1,649.01

0.7

2,760

N

$

1,721.97

0.4

1,623

$

36,143.10

18.1

71,884

TOTALS:

R30

Lighting Controls Est. # of Annual Fixtures Hours Conw/o trolled Controls 6

2,808

1

Fixture Location

Water Room

Est. Actual Annual Annual Hrs. w/ Hours Controls (if different) 1,966

Lighting Controls Measure Description

Reduced # of Total # of Annual Add'l Watts ConUnits Lighting Relays trolled Hours Needed

Dual Tech Occ. Sensor Wall Switch

1 Lighting

2/9/2011

842.40

62

Total Cost

$

171.25

Est. Demand Annual kWh Savings Savings (kW) 0.0

61 Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

6

2,808

1

Water Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

62

$

171.25

0.0

61

7

2,808

1

Closet Behind Desk

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

62

$

171.25

0.0

61

15

2,808

4

Office (rt)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

16

2,808

4

Office (rt 2)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

356

$

171.25

0.1

351

20

2,808

4

Office (rt)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

356

$

171.25

0.1

351

21

2,808

4

Office (left)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

22

2,808

4

Office (rt 2)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

356

$

171.25

0.1

351

23

2,808

4

Office (left 2)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

24

2,808

4

Office (left 3)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

356

$

171.25

0.1

351

25

2,808

4

Office (left 4)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

26

2,808

2

Copy Room

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

178

$

171.25

0.0

175

27

2,808

4

Office (rt 3)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

28

2,808

4

Office (left 5)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

356

$

171.25

0.1

351

29

2,808

4

Office (rt 4)

1,966

Dual Tech Occ. Sensor Wall Switch

1

842

356

$

171.25

0.1

351

56

2,808

4

Rescue Squad - Office

1,966

Dual Tech Occ. Sensor Wall Switch

1

842.40

236

$

171.25

0.1

233

$

2,568.70

1.0

4,390

TOTALS:

Notes:

Lighting 2/9/2011

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.

New Jersey Office of Clean Energy Direct Install Program Energy Assessment Tool HVAC Control Measures Measure Description

Controlled Cooling OperaUnit # of Units Energy tionally Cooling Installed Efficiency Tested? Capacity Ratio (EER)

Measure Location

Annual kWh Savings

Total Cost

(Tons)

$

Measure Description

Annual HVAC Unit Fuel # of Units Capacity HVAC Fuel Usage Installed (thousand Source (therms,

Measure Location

BTU/hr)

1 2

Electronic Fuel-Use Economizers (for Hot Water Heat)

Measure Description

-

-

Annual kWh Savings

Total Cost

gallons or KWh /yr)

Est. Demand Savings (kW) -

Nat. Gas Savings (therms /yr)

Boiler Room

1

1,281

Gas

8,000

$

1,860.95

-

1,040.0

Boiler Room #2

1

980

Gas

6,000

$

1,860.95

-

780.0

# of Units Installed

Annual HVAC Electric Usage (kWh)

Gas, Oil, Primary or LPG Fuel Usage Source for (therms or Heating gal./yr)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

# of Units Installed

Days per Year Facility Operates

Hot Water Current Fuel Flow Rate Source (gal./min)

Total Cost

Annual kWh Savings

Nat. Gas Savings (therms /yr)

Pipe Diameter

Pipe Length

Total Cost

(inches)

(feet)

Annual kWh Savings

Nat. Gas Savings (therms /yr)

Measure Location

Hot Water Demand Control Measures Measure Description

Measure Description

Measure Location

Measure Location

TOTALS

Hot Water Fuel Source

Low or High Temp Piping?

$

3,721.90

-

1,820.0

Notes:

HVAC & HW Controls Measures 2/9/2011

Direct Install Energy Assessment Tool (ver. 5.0) ©2010 TRC Energy Services. Property of TRC. Contractor granted limited license.