New Strategies in Energy Efficiency Programs

Report 5 Downloads 13 Views
New Strategies in Energy Efficiency Programs

Michael McAteer Director, Customer Business Strategies National Grid, Waltham, MA

Massachusetts Three-Year Plan  Green Communities Act: Develop 3 yr plan for acquisition of all

available cost effective energy efficiency  Aggressive Energy Savings Goals = 2.6M MWH, 58M Therm  State budget 2010-2012= $1.3 Billion (electric), $347M (gas)  Plan Reflects:  A construct for gas/electric program integration and seamless delivery

across PAs= MASS SAVE  A commitment to go deeper in buildings (more comprehensive) and broader (more customer participation) = New Strategies in EE Programs

2

 Mass Save® = Collaborative of Massachusetts’ gas and

electric utilities and energy efficiency service providers  Work closely with DOER to provide a wide range of services, incentives, trainings, and information promoting

energy efficiency that help residents and businesses manage energy use and related costs

3

New Regional Strategies in EE Programs: MA & RI Strategic Energy Management Planning (SEMP) UpStream Incentives: LED

Combined Heat & Power (CHP)

Innovative Ideas for Higher EE Goals Codes and Standards

Analytics

Communities Partnership 4

Strategic Energy Management Planning Sets long-term, deep energy saving goals

Multi-yr MOU w top quartile customers

Involves top management, creates org. shift

Financial Support

Technical Support

Operations Support

Long-Term Strategic Energy Management Planning

Incorporates Triple Bottom Line

5

Upstream Lighting Goal: Quickly convert current standard T8 market to reduced wattage T8s MA 2010 T8 sales, units

HPT8 (32 watt), 907,200 , 11%

RW T8s (30, 28, 25watt), 2,577,200 , 31%

Potential to capture 22.5M kWh to 50.9M kWh annual savings over 4 year program plan for Mass Save Std.T8 sales, 4,886,600 , 58%

Massachusetts T8 2010 sales (based on Osram Sylvania, GE and Philips sales data)

Offer Upstream Incentive to participating Distributors to remove cost delta between Standard T8 lamps and 28 watt reduced wattage T8 lamps •Transform the market to 28 watt T8 lamps •Encourages Distribution to stock only energy efficient lamps

First Steps towards a high volume, focused approach… 6 Next Steps LED replacement lamps

CHP Strategy Incentives

Example: Office/Research

150 kW or less, $750 per kW

500 kW Gas Engine w/chiller

Over 150 kW, up to $750 per kW

kWh/Year

4,600,000

Installation Cost

$1,600,000

Other Caps

Net Savings

$330,000

No more than 50% of Installed Cost

Simple Payback

4.8

BC Test

1.17

Potential Program Administrator Budget Limitations

Incentive

$375,000

Net Payback

3.7

7

Energy Code and Equipment Standards Support Assist State of MA & RI with: • Current code compliance support • Advancement of future codes & Standards

Net Zero Bldg: End Goal

EE Programs to help move market to this point! Technical studies

Getting to 50%

Redefine incentive structure Reserve development money Development & B/C studies

Stretch Codes

Implementation assistance Training/Education

Base Code: Building a platform

Advocacy

Compliance assistance Future base code development 8

Analytics  Low-cost no cost options through software program that disaggregates data  Enables remote energy performance insight into buildings, reducing the need for costly on-site assessments  Comprehensive End-Use Energy Analysis for Large Scale and a

building energy reporting platform for customers  Providers:  Iblogix, Inc, Nexamp

9 Image Credit: Iblogix, Inc

Communities Outreach  Leverage existing community networks to increase awareness and measurable participation in resi & small commercial EE programs  Community Groups responsible for planning and executing 6 months of public education, outreach, marketing, and PR to drive measurable participation in programs  Program Administrators set goals for communities (installed measures, payment, evaluation, reporting)  RI Initiative Update: 3 of 8 organizations responded to the RFP and submitted proposals. Pilot is scheduled to run from July 1 through December 31, 2011 10

Success Story: BlueCross & BlueShield, RI LEED New Construction Gold recipient

11

Success Story: BlueCross & BlueShield, RI The Need:

 Achieve a high performance, energy-efficient building space The Solution: Tech & Financial Assistance through National Grid

 Integrated design with high efficiency

 High Performance lighting design and controls, rooftop HVAC system, economizers and premium efficiency motors  High Performance Envelope

12