North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

Agenda • • • • •

Introductions Trail Overview Project Timeline Parking Lot Alternatives Emory Lane Bikeway Extension Update • Next Steps/Feedback • Questions North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

OBGC Community Park

Upper Rock Creek Trail Corridor Plan Approved 2008

North Branch Trail Future Trail (by Parks)

HINES ROAD

Preserve at Rock Creek Trail

Magruder HS

ICC Bikeway North Branch Trail (Proposed) Muncaster Mill Bikeway

Lake Needwood

Emory Lane Bikeway Emory Lane Bikeway Extension (Future) North Branch Trail (Proposed) Lakeside Trail Lake Frank Trail Connector Rock Creek Trail

ROCK CREEK REGIONAL PARK Lake Frank

NORTH BRANCH STREAM VALLEY PARK

Trail Plan Magruder High School

NORTH BRANCH STREAM VALLEY PARK

Preserve at Rock Creek Trail ICC Bikeway North Branch Trail, Northern Extension (Proposed) Muncaster Mill Bikeway Emory Lane Bikeway Emory Lane Bikeway Extension (Future) North Branch Trail, Meadowside Lane Connector (Proposed) North Branch Trail (Proposed)

Smith Env. Ed. Center Meadowside Nature Center

Lake Frank

Lakeside Trail Lake Frank Trail Connector Rock Creek Trail

ROCK CREEK REGIONAL PARK

Project Timeline • August, 2011

Lake Frank Trail Connector complete

• 2011-2013

Facility Planning & public outreach

• 27 June, 2013

Planning Board approval

• August, 2013

Detailed design begins

• 22 July, 2015

Received $2 Million FHWA TAP funding

• 23 March, 2017

Norbeck Manor HOA meeting

• July, 2017

TAP Executive Committee scope review

• September, 2017

Community Outreach

North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

Neighborhood Concerns Trailhead/Parking Lot • Proposed parking lot and trail pose security risks to adjacent homes: • Burglary • Drug Dealing • Illegal Dumping • Proposed parking lot will cause traffic congestion at Sweetbirch Drive. Emory Lane Bikeway Extension • At-grade crosswalk at Emory Lane is dangerous for cyclists, pedestrians and drivers. • Pedestrian crossing at Emory Lane will cause traffic congestion at Sweetbirch Drive. North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

Parking Lot Option A – Muncaster Mill Road

A

Parking Lot Option A – Muncaster Mill Road

Parking Lot Option A – Muncaster Mill Road

Parking Lot Option A – Muncaster Mill Road

TRAIL

PARKING

DRIVEWAY

BIKE MUNCASTER LANE MILL ROAD

Parking Lot Option A – Muncaster Mill Road

Parking Lot Option B – Meadowside Lane

B

Parking Lot Option B – Meadowside Lane

LATHROP E. SMITH ENVIRONMENTAL EDUCATION CENTER

Parking Lot Option B – Meadowside Lane

Parking Lot Option B – Meadowside Lane

MEADOWSIDE LANE PARKING

FOREST

TRAIL

FOREST

Parking Lot Option B – Meadowside Lane

MEADOWSIDE NATURE CENTER

Alternative Comparison Site/Context Existing Condition Connecting Roadway Connecting Trail(s)

Adjacent Properties

Muncaster Mill Road Former home site (previously disturbed) Muncaster Mill Road (State Route 115) Emory Lane Bikeway (future extension) to ICC Bikeway Norbeck Manor HOA (adjoining)

North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

Meadowside Lane Forest edge Meadowside Lane (park road) Muncaster Mill Bikeway (existing) to ICC Bikeway Residences (west); Smith Center, Meadowside Nature Center (shared access)

Alternative Comparison Site Design

Muncaster Mill Road

Meadowside Lane

Parking Space Access

Dedicated driveway

Direct pull-off from roadway

Grading Impacts

Significant (retaining walls necessary)

Minimal fill

Visibility

Tree Impacts

Impacts to character Spaces visible from and setting of Muncaster Mill roadway Meadowside Lane Minimal removals Disturbance to edges (previously disturbed of forest site)

North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

Alternative Comparison Scope/Schedule Approvals Required Cost Implication Schedule Impact Precedent

Muncaster Mill Road SHA Utility Access Permit None (included in Facility Plan) Spring 2018 construction start (estimated) Matthew Henson Trail – Layhill Road Lot

North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

Meadowside Lane Planning Board approval Change order to design consultant Winter 2019 construction start (estimated) Meadowside Nature Center Parking Lot

Project Schedule Task

Muncaster Mill Road

Meadowside Lane

Public Comment

September, 2017

Planning Board

TBD (Informational Only) November, 2017

September, 2017

Permit Submissions

December, 2017

April, 2018

Construction RFP

May, 2018

September, 2018

Construction Begins

Spring, 2018

Winter, 2019

Fall, 2019

Summer, 2020

Construction Complete

North Branch Hiker-Biker Trail

Community Meeting | 13 September, 2017

We want to hear from you!

B

A

Visit www.montgomeryparks.org/projects/public-input/ and select the North Branch Hiker Biker Trail topic to comment.

Emory Lane Bikeway Extension

Emory Lane Bikeway Extension Possible Improvements along Muncaster Mill Road • Traffic Signal at Emory Lane • Enlarged median/refuge • Existing drive lanes to remain • 6-foot wide shoulder • 9-foot wide vegetative buffer • Stormwater management • 10-foot wide shared use path • South shoulder of Muncaster Mill Road is currently 25 feet wide.

Contact Information Aaron Feldman Project Manager (M-NCPPC) [email protected] 301-650-2887 Patricia Shepherd Capital Projects Manager (MCDOT) [email protected] 240-777-7231 Mike Jones Park Manager [email protected] 301-563-7523 North Branch Hiker-Biker Trail