Northpower Distribution Price Schedule From 1 April 2017

Report 2 Downloads 25 Views
Price Schedule for the Northpower Electricity Distribution Network Effective 1 April 2017 (All prices exclude GST) To be read in conjunction with the “Companion Guide for the Northpower Electricity Distribution Price Schedule” This price schedule is intended as general information for consumers and electricity retailers. A more detailed price schedule which meets the requirements of the Electricity Distribution Information Disclosure Determination 2012 is available in the disclosure portion of the website at: http://northpower.com/about/disclosures/distribution-pricing

Contents: Table 1: Residential Connections ..................................................................................................................2 Table 2: General Connections .......................................................................................................................3 Table 3: Large Commercial & Industrial sites with half-hour metering ........................................................4 Table 4: Very Large Industrial sites with individual pricing ...........................................................................4

Distribution Price Schedule for the Northpower Network from 1 April 2017 1 April 2017

1

Table 1: Residential Connections Price Category Code

Price Component Code

DM1

Description

Register Content Code + Available Hours

Availability per day

Delivery price from 1 April 2017

Units

UN24 CN18 NC8 CN12 EG24

24 hours 18 hours 2300-0700 Dusk to dawn 24 hours

$0.15 $0.1340 $0.0440 $0.0160 $0.0975 $0.0000

$/day/ICP $/kWh $/kWh $/kWh $/kWh $/kWh

$/day/ICP $/kWh $/kWh $/kWh $/kWh

C 02 06 07 24 92

PRINCIPAL PLACE OF RESIDENCE Daily price Uncontrolled Controlled 18 hour Night only Unmetered lighting Exported generation

W 03 06 07 92

NON-PRINCIPAL RESIDENCE Daily price Uncontrolled Controlled 18 hour Night only Exported generation

UN24 CN18 NC8 EG24

24 hours 18 hours 2300-0700 24 hours

$1.00 $0.0970 $0.0440 $0.0160 $0.0000

214 ICP’s (Closed)

X 71 24

INCLUSIVE (Obsolete) Daily price All Inclusive Unmetered lighting

IN18 CN12

24hr+18hr Dusk to dawn

$0.15 $0.1000 $0.0975

$/day/ICP $/kWh $/kWh

NEWICP

N

NEWLY CREATED ICP

$0.00

$/day/ICP

43,921 ICP’s

DM3 3,009 ICP’s

DM4

Residential ICP’s that are not the principal place of residence for the consumer are assigned to the DM3 Price Category.

Distribution Price Schedule for the Northpower Network from 1 April 2017 1 April 2017

2

Table 2: General Connections Price Category Code

ND1 9,513 ICP’s

ND2 354 ICP’s

ND5 88 ICP’s

ND6 209 ICP’s

ND7 13 ICP’s

ND12 448 ICP’s

Price Component Code

Description

Register Content Code + Available Hours

Availability per day

Delivery price from 1 April 2017

Units

UN24 CN22 CN18 NC8 CN12 CN12 EG24

24 hours 22 hours 18 hours 2300-0700 Dusk to dawn Dusk to dawn 24 hours

$1.00 $0.1130 $0.0740 $0.0440 $0.0160 $0.0975 $0.0975 $0.0000

$/day/ICP $/kWh $/kWh $/kWh $/kWh $/kWh $/kWh $/kWh

UN24 CN22 CN18 NC8 EG24

24 hours 22 hours 18 hours 2300-0700 24 hours

$1.90 $0.1100 $0.0740 $0.0440 $0.0160 $0.0000

$/day/ICP $/kWh $/kWh $/kWh $/kWh $/kWh

Daily price $1.00 Controlled day DC16 0700-2300* $0.0780 Controlled night NC8 2300-0700* $0.0360 Uncontrolled UN24 24 hours $0.1130 Controlled 22 hour CN22 22 hours $0.0740 *Price Code 11/12 in ND5 has 22 hour availability as per CN22

$/day/ICP $/kWh $/kWh $/kWh $/kWh

Up to 70kVA (100A or less) A 33 05 46 47 19 24 93

Daily price Uncontrolled Controlled 22 hour Controlled 18 hour Night only Metered lighting Unmetered lighting Exported generation Greater than 70kVA (CT metering)

B 32 55 46 47 93

Daily price Uncontrolled Controlled 22 hour Controlled 18 hour Night only Exported generation IRRIGATION and PUMPS

P 11 12 33 05

CONTROLLED DAY/NIGHT

UNMETERED 24 HOUR G 25

Daily price Unmetered

UN24

24 hours

$1.00 $0.1130

$/day/ICP $/kWh

Dusk to dawn

$0.28 $0.0000

$/day/fixture

CN12

24 hours

$1.40 $0.1130

$/day/ICP $/kWh

UNMETERED PUBLIC LIGHTING H 26

Daily price Unmetered lighting

$/kWh

BUILDERS TEMPORARY SUPPLY T 53

Daily price Uncontrolled

UN24

Distribution Price Schedule for the Northpower Network from 1 April 2017 1 April 2017

3

Price Category Code ND13 292 ICP’s

Price Component Code L

Description

Register Content Code + Available Hours

Availability per day

LONG TERM DISCONNECTED

NEWICP

Delivery price from 1 April 2017 $0.00

$/day/ICP

$0.00

$/day/ICP

NEWLY CREATED ICP

Units

Table 3: Large Commercial & Industrial sites with half-hour metering Price Category Code ND9 77 ICP’s

ND10 86 ICP’s

Price Component Code

Description

D 09AD 09SD 09RP

DEMAND-BASED PRICING Monthly price Anytime Maximum Demand Network Peak Period Demand Excess Reactive power

J 31 31RP 103

VOLUME-BASED PRICING Daily price Uncontrolled Excess Reactive energy Exported generation

Availability per day

24 hours

24 hours 24 hours

Delivery price from 1 April 2017

Units

$120.00 $6.70 $9.00 $1.62

$/month $/kVA/month $/kVA/month $/excess kVAr/month

$2.60 $0.1130 $0.0300 $0.0000

$/day/ICP $/kWh $/excess kVArh $/kWh

Table 4: Very Large Industrial sites with individual pricing Price Category Code IND 6 ICP’s

Description

INDIVIDUAL PRICING Transmission Connection Interconnection Excess Reactive power Electricity Authority levies Distribution Distribution Transmission administration Loss & Constraint

Price from 1 April 2017

Units

Assessed per site $123.98 $1.62 Price varies monthly

$/month/site $/kW per annum $/excess kVAr per month $/kWh

Assessed per site 2% unless agreed otherwise. Rate varies monthly

$/month/site $/month $/kWh

Distribution Price Schedule for the Northpower Network from 1 April 2017 1 April 2017

4