Turkey – Q3 2017
Öksüt Gold Project – Drill Hole Plan Map Keltepe NW
B
Keltepe
A
Büyüktepe D
Güneytepe C
Yelibelen This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
1
Turkey – Q3 2017
Öksüt Gold Project – Keltepe Section AB NE
SW
ODD0024 ODD0049 ODD0145 ODD0120
ODD0290
ODD0126
ODD0110
ODD0058
2015 Keltepe Pit Design
ODD0290 2.41 g/t Au / 148.9m including 5.96 g/t Au / 38.3m
2 This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
Turkey – Q3 2017
Öksüt Gold Project – Güneytepe Section CD NE ODD0281 1.85 g/t Au / 42.2m ODD0281 1.23 g/t Au / 80.8m
ODD0254
ODD0281
SW ODD0281 1.02 g/t Au / 9.50m 2015 Güneytepe Pit Design
ODD0281 0.43 g/t Au / 21 m
3 This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
Turkey – Q3 2017
Öksüt Gold Project – Keltepe Section ODD0291 NE ODD0199 ODD0158 ODD0138 ODD0183 ODD0081 ODD0094
SW
ODD0291
ODD0135 ODD0083 ODD0154 ODD0149 ODD0131
ODD0291 1.47 g/t Au / 137.30m including 2.32 g/t Au /65.40m
This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
ODD0084
Turkey – Q3 2017
Öksüt Gold Project – Güneytepe Section ODD282-283 NE ODD00010 ODD0180
ODD0012
ODD0282 0.58g/t Au / 49.6m
ODD0282 ODD0283 ODD0283 1.08 g/t Au / 42.3m
SW
2015 Güneytepe Pit Design
ODD0283 3.29 g/t Au / 8m
ODD0283 1.09 g/t Au / 31.7m
ODD0282 1.28 g/t Au / 12m
ODD0282 0.44 g/t Au / 20.5m 5
This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
Turkey – Q3 2017
Öksüt Gold Project – Güneytepe Section ODD287-288 ODD0288
Planned Drillhole 1
NE ODD0288 0.24 g/t Au / 9.8m
ODD0258
Planned Drillhole 2
ODD0287
ODD0035 ODD0030 ODD0257
2015 Güneytepe Pit Design ODD0288 1.35 g/t Au / 16.2m
SW
ODD0287 0.64 g/t Au / 22.4m
ODD0287 0.5 g/t Au / 27 m
This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
ODD0288 0.42 g/t Au / 25.3m ODD0288 0.62 g/t Au / 16.7m
Turkey – Q3 2017
Öksüt Gold Project – Güneytepe Section ODD285-286-289 NE Planned Drillhole
ODD0289 ODD0286 Planned Drillhole
SW
ODD0289 0.91 g/t Au / 6.8m
ODD0285
ODD0285 0.29 g/t Au / 10.9m ODD0289 0.22 g/t Au / 12.8m ODD0286 0.2 g/t Au / 5.9m
ODD0286 0.27 g/t Au / 9.6m
ODD0285 0.33 g/t Au / 50.7m
ODD0286 0.5 g/t Au / 12.8 m
This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101.
Centerra Gold Inc. - Oksut Gold Project Drill Results Period July 1st, 2017 to September 30th, 2017 Drill Hole
Target
ODD0281
Güneytepe infill
ODD0282
ODD0283
Güneytepe infill
Güneytepe infill
ODD0284
Güneytepe infill
ODD0285
Güneytepe step-out
ODD0286
Güneytepe step-out
ODD0287
ODD0288
ODD0289
From (m)
includes
includes
includes
Güneytepe infill
Güneytepe infill
Güneytepe step-out
includes
ODD0290
Keltepe infill
ODD0292
Keltepe infill
Core Length (m)
Cu (%)
Oxidation
0.0
80.8
80.8
1.23
oxide
17.0
59.2
42.2
1.85
oxide
80.8
110.0
29.2
0.49
sulphide
0.0
16.0
16.0
0.25
oxide
21.9
71.5
49.6
0.58
oxide
37.0
49.0
12.0
1.28
oxide
71.5
92.0
20.5
0.44
sulphide
0.0
42.3
42.3
1.07
oxide
15.2
23.2
8.0
3.29
oxide
42.3
74.0
31.7
1.10
sulphide
72.5
83.7
11.2
0.35
oxide
83.7
95.7
12.0
0.21
sulphide
5.0
15.9
10.9
0.29
oxide
56.8
107.5
50.7
0.33
oxide oxide
1.1
7.0
5.9
0.20
44.0
53.6
9.6
0.27
oxide
110.5
123.3
12.8
0.25
oxide
5.0
20.0
15.0
0.19
oxide
33.6
56.0
22.4
0.64
oxide
66.0
71.0
5.0
0.22
oxide
72.0
99.0
27.0
0.50
sulphide
14.0
23.8
9.8
0.24
oxide
61.5
77.7
16.2
1.35
oxide
83.7
109.0
25.3
0.42
oxide
133.5
150.2
16.7
0.62
oxide
1.0
7.8
6.8
0.91
oxide
47.0
59.8
12.8
0.22
oxide
81.8
231.2
148.9
2.41
oxide
82.8
100.0
17.2
2.54
oxide
includes
111.0
149.3
38.3
5.96
oxide
154.8
168.0
13.2
2.49
oxide
includes
175.0
189.0
13.5
1.12
oxide
includes
196.0
202.3
6.3
1.23
240.0
251.3
13.3
244.8
250.8
6.0
271.6
278.0
6.4
oxide 1.69
oxide/sulphide
3.41
sulphide
0.28
sulphide
71.6
209.4
137.3
1.47
oxide
includes
93.7
99.2
5.5
2.48
oxide
includes
107.2
173.1
65.4
2.32
oxide
includes
201.0
208.7
7.7
1.28
oxide
256.5
269.6
13.1
0.58
sulphide
277.0
287.3
10.3
0.55
sulphide
1.5
12.6
11.1
0.27
oxide
Yelibelen Exploration
Notes: Mineralized intervals are greater than 0.20 g/t Au. Higher grade sub-intervals are greater than 1.00 g/t Au. Minimum 5m width and maximum of 5m internal dilution. True widths for mineralized zones are about 60% to 90% of stated down hole interval. Oxidation assignment is a visual discrimination from core logging. This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101. Tables are current as of September 30th, 2017.
Au (g/t)
includes
includes
ODD0291
To (m)
Centerra Gold Inc. - Oksut Gold Project, Turkey Diamond Drill Hole Locations Period July 1st, 2017 to September 30th, 2017
Drill Hole
Target
Location Easting
Location Northing
Elevation (m)
Length (m)
Collar Azimuth
Collar Dip
ODD0281
Güneytepe infill
719,340
4,239,791
1,675
110
60
-50
ODD0282
Güneytepe infill
719,389
4,239,663
1,681
92
240
-60
ODD0283
Güneytepe infill
719,319
4,239,639
1,655
107
240
-75
ODD0284
Güneytepe infill
719,362
4,239,596
1,658
136
240
-60
ODD0285
Güneytepe step-out
719253.496
4,239,876
1,668
125
240
-60
ODD0286
Güneytepe step-out
719,284
4,239,893
1,679
154
240
-60
ODD0287
Güneytepe infill
719,223
4,239,787
1,649
99
60
-45
ODD0288
Güneytepe infill
719,417
4,239,888
1,707
171
240
-60
ODD0289
Güneytepe step-out
719,334
4,239,923
1,700
98
240
-60
ODD0290
Keltepe infill
719,300
4,240,396
1,789
292
77
-50
ODD0291
Keltepe infill
719,317
4,240,344
1,789
287
77
-55
ODD0292
Yelibelen Exploration
719,316
4,238,969
1,832
188
240
-60
Notes: This information should be read together with our news release of October 31, 2017. Mustafa Cihan, a Member of the Australian Institute of Geoscientists (AIG), is Centerra’s qualified person for the purpose of National Instrument 43-101. Table is current as of September 31, 2017.
Projection: UTM ED50 Zone 36 Azimuth: relative to True North