Home
Add Document
Sign In
Create An Account
original east span demolition by the numbers - Bay Bridge Info
Download PDF
Comment
Report
7 Downloads
36 Views
• Length of East Span – 1.97 miles • Total steel – 58,209 tons
O RIGINAL E AST S PAN D EMOLITION BY THE N UMBERS Yerba Buena Island Detour .25 miles (1,314 feet)
• Total concrete – 245,470 tons • Bridge steel – 51,687 tons • Pier/foundation steel – 6,522 tons • Bridge concrete – 66,962 tons • Pier/foundation concrete – 158,470 tons
Cantilever Truss
504 ´ Truss Spans
288 ´ Truss Spans
.46 miles (2,420 feet)
.49 miles (2,569 feet)
.78 miles (4,104 feet)
B ETWEEN P IERS E2
AND
E3 (F IRST P HASE
OF
D EMOLITION ):
• Length of cantilever upper deck to be removed – 1,400 feet C ANTILEVER S TRUCTURE :
• Amount of concrete to be removed – 2,125 tons
• Cantilever bridge steel – 20,412 tons
• Amount of rebar to be removed – 375 tons
• Cantilever pier/foundation steel – 2,257 tons
• Amount of steel deck supports to be removed – 1,300 tons
• Cantilever concrete – 12,460 tons • Cantilever pier/foundation concrete – 53,553 tons • Height of tallest point of cantilever above the water – 382 feet
Recommend Documents
Briefing on Bay Bridge Bolts â July 10, 2013 - Bay Bridge Info
Sunset Bridge Demolition and Reconstruction Fact Sheet
Precast Segmental Bridge Construction Part 2 - Span by
East Bay
East Bay
×
Report original east span demolition by the numbers - Bay Bridge Info
Your name
Email
Reason
-Select Reason-
Pornographic
Defamatory
Illegal/Unlawful
Spam
Other Terms Of Service Violation
File a copyright complaint
Description
×
Sign In
Email
Password
Remember me
Forgot password?
Sign In
Login with Facebook
Our partners will collect data and use cookies for ad personalization and measurement.
Learn how we and our ad partner Google, collect and use data
.
Agree & Close