P re cin ct P la n R o ckb ank S ite P la n

Report 1 Downloads 167 Views
Legend Precinct boundary

Precinct Plan Rockbank Site Plan Co-ordinate Datum MGA55

Scale A3 1 : 40000

400

0

400

800 Lengths are in metres

1200

139029P00 SITE

4/6/2013

1 Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

of Version 1 Drawing No.

Sheet CAD Ref.

APPROVED

Checked By SN

ES

AMENDMENT

Drawn By

REV

1

DATE

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au

Legend

Note : Contour Interval 0.5m Precinct boundary Existing Sewer / Rising Main / Pump Station WP3 Sewer / Rising Main / Pump Station WP4 Sewer / Rising Main Future Sewer / Rising Main Approximate Catchment Boundary

Co-ordinate Datum

1 : 15000

Scale A3

Precinct Plan Rockbank Indicative Sewer Layout

MGA55

150

0

150

300 Lengths are in metres

450

139029P00 SEWER

30/4/2013

1 Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

1

15-09-2013 DATE

of Version 2 Drawing No.

Sheet CAD Ref.

S.N. APPROVED

Checked By SN

ES

Indicative alignment amendments AMENDMENT

Drawn By

2 REV

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au

Legend Precinct boundary Existing Water Main Proposed Trunk Water (WP3 2013-2017) Proposed Trunk Water (WP5 2023-2027 or beyond)

Co-ordinate Datum

1 : 15000

Scale A3

150

0

150

300 Lengths are in metres

Precinct Plan Rockbank Indicative Potable Water Layout

MGA55

450

139029P00 WATER

30/4/2013

1 Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

1

16-09-2013 DATE

of Version 2 Drawing No.

Sheet CAD Ref.

S.N. APPROVED

Checked By SN

ES

Update legend and extent of WP3 works AMENDMENT

Drawn By

2 REV

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au

Legend

Precinct Plan Rockbank

1 : 15000

150

300 Lengths are in metres

Precinct boundary Indicative Recycled Water Layout Proposed Trunk Recycled Water (WP3 2013-2017) Proposed Trunk Recycled Water (WP4 2018-2023) Co-ordinate Datum 150 0 Scale A3 Proposed Trunk Recycled Water (Beyond WP4) MGA55

450

139029P00 RECYCLED WATER

30/4/2013

1 Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

1

15-09-2013 DATE

of Version 2 Drawing No.

Sheet CAD Ref.

S.N. APPROVED

Checked By SN

ES

Legend updated future services added AMENDMENT

Drawn By

2 REV

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au

Legend Precinct boundary Melton 11 System Melton 21 System

Co-ordinate Datum

1 : 20000

Scale A3

Precinct Plan Rockbank Indicative Electrical Layout

MGA55

200

0

200

400 Lengths are in metres

600

139029P00 ELECTRICITY

15/5/2013

1 Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

of Version 1 Drawing No.

Sheet CAD Ref.

APPROVED

Checked By SN

ES

AMENDMENT

Drawn By

REV

1

DATE

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au

Legend Precinct boundary

Precinct Plan Rockbank Gas Supply Co-ordinate Datum MGA55

Scale A3 1 : #####

400

0

400

800 Lengths are in metres

1200

139029P00 GAS

3/4/2013

1 Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

of Version 1 Drawing No.

Sheet CAD Ref.

APPROVED

Checked By SN

ES

AMENDMENT

Drawn By

REV

1

DATE

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au

8

Co-ordinate Datum

1 : 100

Scale A3

1

Precinct Plan Rockbank Connector Street - Residential

MGA55

0

1

3

7

18/10/2013

1 139029P00 TYPICAL

of Version 1

Date

E:\JOBS\1009 ROCKBANK PSP\CAD FILES\ACAD

Sheet Drawing No.

APPROVED

Checked By SN

CAD Ref.

AMENDMENT

ES

REV

Drawn By

6

EXISTING ROAD RESERVE 21

2 Lengths are in metres

1

DATE

Innovation in Infrastructure

N

445 Townsend Street PO Box 3400 Albury NSW 2640

T 61 2 6051 1300

spiire.com.au