Problems

Problem 13.1  Given the illustration shown below, identify the items labeled A through G. A

G F B

E

C D

Problem 13.2  Given the illustration shown below, identify the items labeled A through M.

A

D

C

B

E

J

L

METER

M

F I G H K

1 15039-0031e-2pass-r01.indd 1

15-06-2017 21:49:22

Instructors Problem 13.3  Given the illustration shown below, identify the items labeled A through M. A E B

F

C

G

D

H

I

J M K L

Public Sewer Connection

Problem 13.4  Given the illustration shown below, identify the items labeled A through P. A C D

E

B

F

G

I

K P J

O N

M

H

L Septic System

2 15039-0031e-2pass-r01.indd 2

15-06-2017 21:49:22

Instructors Problem 13.5  Given the illustration shown below, identify the items labeled A through M. A

C D E B

F

M L K J

I

G

H

Cesspool System

Problem 13.6  Write an approximately 150-word report describing the National Energy Conservation Code.

Problem 13.16  Write an approximately 250-word report describing thermostats and thermostat placement.

Problem 13.7  Write an approximately 250-word report describing central forced air systems.

Problem 13.17  Write an approximately 350-word report describing plumbing systems.

Problem 13.8  Write an approximately 250-word report describing forced-air heating plans.

Problem 13.18  Write an approximately 250-word report describing piping materials used in plumbing.

Problem 13.9  Write an approximately 100-word report describing HVAC schedules.

Problem 13.19  Write an approximately 250-word report describing sizing of plumbing piping.

Problem 13.10  Write an approximately 350-word report describing providing duct space. Problem 13.11  Write an approximately 300-word report describing hot water heating systems.

Problem 13.20  Write an approximately 250-word report describing American National Standard taper pipe threads. Problem 13.21  Write an approximately 250-word report describing water heaters.

Problem 13.12  Write an approximately 250-word report describing heat pump systems.

Problem 13.22  Write an approximately 250-word report describing tankless water heaters.

Problem 13.13  Write an approximately 250-word report describing ductless heat pump systems.

Problem 13.23  Write an approximately 250-word report describing solar hot water systems.

Problem 13.14  Write an approximately 250-word report describing radiant heating systems.

Problem 13.24  Write an approximately 100-word report describing hose bibbs.

Problem 13.15  Write an approximately 250-word report describing zone control systems.

Problem 13.25  Write an approximately 250-word report describing drainage and vent systems.

3 15039-0031e-2pass-r01.indd 3

15-06-2017 21:49:22

Instructors Problem 13.26  Write an approximately 250-word report describing plumbing placement.

Problem 13.42  Write an approximately 150-word report describing structured wiring

Problem 13.27  Write an approximately 100-word report describing plumbing schedules.

Problem 13.43  Write an approximately 100-word report describing electrical schedules.

Problem 13.28  Write an approximately 250-word report describing fire sprinkler systems.

Problem 13.44  Write an approximately 250-word report describing home residential wind power electricity generation.

Problem 13.29  Write an approximately 250-word report describing public sewer systems. Problem 13.30  Write an approximately 250-word report describing septic systems. Problem 13.31  Write an approximately 250-word report describing cesspool systems.

Problem 13.45  Write an approximately 250-word report describing photovoltaic modules. Problem 13.46  Write an approximately 250-word report describing how to become an HVAC technician, plumber, or electrician.

Problem 13.32  Write an approximately 250-word report describing residential storm drains.

Team Home Construction Problems

Problem 13.33  Write an approximately 250-word report describing temporary electrical system.

Continue the team problems started in previous chapters.

Problem 13.34  Write an approximately 250-word report describing electrical rough-in.

Home Construction

Problem 13.35  Write an approximately 250-word report describing electrical service panel and terminology. Problem 13.36  Write an approximately 250-word report describing finish electrical. Problem 13.37  Write an approximately 250-word report describing tamper-resistant (TR) outlets. Problem 13.38  Write an approximately 250-word report describing carbon monoxide and carbon monoxide alarms. Problem 13.39  Write an approximately 250-word report describing home computerized programming. Problem 13.40  Write an approximately 250-word report describing home security systems. Problem 13.41  Write an approximately 150-word report describing home radio frequency systems.

This is a continuation of construction for the actual home to be built on property near the school, or on the school grounds and then moved to another location after completion. Problem 13.47  Team Problem This problem involves HVAC installation, venting, plumbing, and electrical applications for the home construction project. The installation of these systems can be performed by the student team while supervised by the instructor or a professional subcontractor for each discipline, or the installation can be performed by a professional subcontractor for each discipline while observed by the student team. The foreman will evaluate and discuss the plans with the team members and supervise the HVAC, venting, plumbing, and electrical installation activities.