RFI #052

Report 8 Downloads 68 Views
RFI #052 2310 Washington Street Newton Lower Falls, Massachusetts 02462 Phone (617) 965-7300       Project: 545 Waterstone at the Circle   To:  Scott Engstrom  (Elkus/Manfredi Architects) 25 Drydock Avenue Boston, Massachusetts 2210 617-368-3358     Subject:   Location:  

Anchor bolt locations at column A.1-11  

Request for Information

Date Created: 4/22/2016

From: 

Theresa Brazeau  (Cranshaw Construction)

 

 

Due Date: 4/29/2016        

Question 

Anchor bolt locations at column A.1-11, Drawings: S100, S101, and S301 The anchor bolts at column A.1-11 are only 1 ½” away from the face of the concrete pier. Please confirm that this is acceptable. If not, please provide revised concrete pier dimensions or revised column base plate dimensions and anchor bolt locations.   Scott Lombardi, Cranshaw Project Manager Attachments: attachment to RFI 052 (Norgate 36 Anchor Bolt Locations).pdf    Responsible Contractor: Norgate Metal 2012 Inc. Contractor RFI Number:  Norgate 36   All Replies:  Copies to: Theresa Brazeau, (Cranshaw Construction) ,   Tom Burke, (Cranshaw Construction) ,   Sherry Clancy, (National Development) ,   Michael Cooperman, (Cranshaw Construction) ,   Linas Dabrila, (Veitas & Veitas Engineers) ,   Nick DiGiovanni, (Cranshaw Construction) ,   Scott Engstrom, (Elkus/Manfredi Architects) ,   Samantha Gajewski, (National Development) ,   Marty Gordon, (Cranshaw Construction) ,   Janaya Hart, (Elkus/Manfredi Architects) ,   Scott Lombardi, (Cranshaw Construction) ,   John Martin, (Elkus/Manfredi Architects) ,   Michael O'Neil, (Cranshaw Construction)  

791 8e Rue Est, La Guadeloupe (Qc) G0M 1G0

FO-7.1-1

REQUEST FOR INFORMATION

RFI No: 036 Response required by: 04-22-2016 Date of Request: 04-21-2016 Contractor: Cranshaw Construction Project’s name: Waterstone at The Circle To: Scott Lombardi Phone: 617-965-7300 Fax: From: Pierre Perron Ref. Document: Anchor bolt locations at column A.1-11. Attachments: CR-036-A & CR-036-B Problem Identification or Question:

Refer to structural drawings S100, S101 & S301 and to the attached sketches CR-036-A & CR-036-B and please respond to all the clouded questions related to the anchor bolt locations at column A.1-11.

Norgate’s suggested Resolution:

Proposed resolution:

V&V: Base plate sized has been revised. See attached sketch.

Selected Resolution By:

Date:

APPROVER : Make sure that all questions related to this RFI (including the ones shown on attached sketches) are clearly answered to avoid delays.