roof demolition plan - option #02

Report 18 Downloads 55 Views
A. 1

2 B.

2-E

2-F

2-G

2-H

2-J

2-K

2-L

EB

PHASE A

2-A 2-B 2-C

OPTION #02

C.H. GUERNSEY & COMPANY C.A. ARCHITECTURE: #00577 EXPIRES JUNE 30, 2013 C.A. ENGINEERING: #10 EXPIRES JUNE 30, 2014

DEMOLITION GENERAL NOTES:

C. D. E. F. G. H. J. K.

EA A FF

L. M.

FF

N.

X

P. Q. R. S. T.

B SA

U. V.

X

W. X.

C

FF

Y. Z. FF

X

REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL AND FIRE PROTECTION SHEETS FOR ADDITIONAL WORK REQUIREMENTS INCLUDING CONCRETE SLAB REMOVAL FOR NEW UNDER FLOOR PIPING AND STRUCTURAL FOUNDATIONS AS REQUIRED. WORKSTATIONS, STORAGE SHELVES, EQUIPMENT, EQUIPMENT SUPPORT & STORED MATERIALS ARE TO BE REMOVED BY FAA PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONTRACTOR SHALL REPAIR OR REPLACE IN KIND PORTIONS OF WALLS & CEILINGS DAMAGED AS PART OF THE DEMOLITION WORK. DEMOLISH ALL EXISTING FLOORING MATERIAL TO CONCRETE. CLEAN CONCRETE. DEMOLISH ALL RAISED FLOORING SYSTEM. CLEAN CONCRETE. DEMOLISH CONCRETE RAMP, STAIRS AND LANDING. DEMOLISH EXISTING CONCRETE SLAB, WALLS AND STAIRS. EXISTING FLOORING TO REMAIN AS SHOWN ON DRAWINGS. DEMOLISH ALL EXISTING BASE MATERIAL. DEMOLISH & REMOVE ALL CMU AND BRICK EXTERIOR WALL (FULL HEIGHT) TO EXPOSED EXISTING CONCRETE STRUCTURE (PROTECT STRUCTURE). DEMOLISH & REMOVE CONCRETE RETAINING WALLS, RAMPS, PLANTERS, CMU BRICK WALLS AND WALKWAYS/SLABS. DEMOLISH & REMOVE ALL INTERIOR PARTITION WALLS (FULL HEIGHT) – FLOOR TO BOTTOM OF STRUCTURE. DEMOLISH & REMOVE ALL LAY-IN ACOUSTICAL CEILING TILES & GRID SUPPPORT SYSTEM DEMOLISH & REMOVE ALL PLASTER CEILINGS & SUPPORT SYSTEM DEMOLISH ALL DOORS & FRAMES – RETURN CORES TO FAA DEMOLISH ALL ALUMINUM DOOR, SIDELITE, GLAZING & FRAME – RETURN CORES TO FAA DEMOLISH ALL ALUMINUM WINDOW FRAMES AND GLAZING. DEMOLISH ALL MILLWORK INCLUDING WALL CABINETS, BASE CABINETS, COUNTERTOPS AND HARDWARE DEMOLISH & REMOVE ALL TOILET PARTITIONS & ACCESSORIES. DEMOLISH ALL PLUMBING FITURES AND CAP PLUMBING. COORDINATE WITH MECHANICAL. PROTECT ALL CONCRETE COLUMNS, BEAMS AND FLOOR/ROOF STRUCTURES. COORDINATE WITH STRUCTURAL. REMOVE EXISTING ROOFING SYSTEM ON ITS ENTIRETY TO THE EXISTING STRUCTURAL DECK/SLAB BELOW. COORDINATE WITH STRUCTURAL. DEMOLISH ALL EXISTING COPING/GRAVEL GUARD. DEMOLISH ALL EXISTING ROOF DRAINS. COORDINATE WITH MECHANICAL.

SB

DEMOLITION KEYNOTES:

CA

1. 2. 3. 4.

FF

X

22

5. 6.

D

7. 8. 9. 10. 11. 12. 13. 14.

E

X

Ea

15. 16. 17. 18.

F

19. 20. 21. 22.

FA X

DEMOLISH EXISTING CONCRETE SLAB THIS AREA. SEE STRUCTURAL. DEMOLISH EXISTING CONCRETE RAMP, STAIRS AND LANDING. DEMOLISH EXISTING CONCRETE SLAB, WALLS AND STAIRS. DEMOLISH PORTION OF CONCRETE WALL (FULL HEIGHT) – FLOOR TO BOTTOM OF STRUCTURE. SEE STRUCTURAL. DEMOLISH ALUMINUM STOREFRONT SYSTEM IN ITS ENTIRETY. DEMOLISH CONCRETE STRUCTURAL DECK AND TOPPING SLAB THIS AREA. SEE STRUCTURAL. EXISTING STAIRS, TREADS, RISERS, STRINGERS, LANDINGS TO REMAIN -FULL HEIGHT. EXISTING STRUCTURAL STEEL ROOF DECK TO REMAIN THIS AREA. EXISTING DOOR(S) AND FRAME TO REMAIN. DEMOLISH TOILET PARTITIONS, FIXTURES & ACCESSORIES. SEE PLUMBING. DEMOLISH STEEL PIPE GUARD RAIL SYSTEM. DEMOLISH ELEVATOR AND ELEVATOR EQUIPMENT. DEMOLISH CANOPY AND STEEL PIPE COLUMNS. SALVAGE EXISTING DECORATIVE CMU SCREEN FOR SEAT WALL SHOWN ON SHEET A-529. PROTECT EXISTING CONCRETE STRUCTURAL COLUMNS AND BEAMS. SEE STRUCTURAL. SALVAGE EXISTING BIRD NETTING FOR POTENTIAL RE-USE OVER SAME OPENINGS. DEMOLISH MECHANICAL EQUIPMENT. DEMOLISH BRICK & CMU FLUE IN ITS ENTIRETY. DEMOLISH SPIRAL STAIR IN IT'S ENTIRETY FULL HEIGHT. EXISTING TELECOMMUNICATION EQUIPMENT TO BE PROTECTED THROUGHOUT CONSTRUCTION. COORDINATE DEMOLITION WITH OWNER REFER ELECTRICAL - CONTRACTOR SHALL CONTACT FAA'S AMI-400 TO LOCATE COMMUNICATION LINES PRIOR TO START OF DEMOLITION (954-3651) DEMOLISH EXISTING EIFS AND BACKUP CONSTRUCTION INFILL PANELS EXISTING CONCRETE STRUCTURE TO REMAIN. DEMOLISH EXISTING FACE BRICK AND BACKUP SYSTEM. DEMOLISH EXISTING SKYLIGHT SYSTEM AND ASSOCIATED STOREFRONT AS PART OF BID OPTION #02.

FB

G

OPTION #02 NOT IN CONTRACT

H WA HA J WB

WC

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15 AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION. UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S. GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR PARTS 15 AND 1520.

REV. LTR.

JOB # SHT. #

NORTH

CHK'D

APP'D

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION MIKE

MONRONEY

AERONAUTICAL

CENTER

OKLAHOMA CITY,

OKLAHOMA

STB RENOVATION 023-STB, FINAL TYPE B DESIGN SUBMITTAL

ROOF DEMOLITION PLAN - OPTION #02

A-201A AD124D SCALE: 1/8" = 1'-0"

DESCRIPTION

OPTION #02 PHASE A PHASE C N.I.C. KEY PLAN - ROOF

1

DATE

ROOF DEMOLITION PLAN - OPTION #02

8'

4'

0

SCALE: 1/8" = 1'-0"

8'

DESIGNED BY Designer

APPROVED BY

DRAWN BY Author CHECKED BY Checker WORK ORDER 2011-002262

SEQUENCE # ISSUED BY

DATE

50

JULY 11, 2012

DRAWING NO.

AD124D

C.H. GUERNSEY & COMPANY C.A. ARCHITECTURE: #00577 EXPIRES JUNE 30, 2013 C.A. ENGINEERING: #10 EXPIRES JUNE 30, 2014

2-F

A-161D A-527

A-161D A-528

2-G

2-H

4

TOP OF NEW ROOF= 27'-0 1/2" ±

SLOPE 1/4" PER FOOT

TOP OF EXISTING DECK= 36'-8" ±

A-161D A-527

2-L

1

EXISTING MECHANICAL EQUIPMENT TO BE REINSTALLED

2

SIM.

EXISTING CONDITION PHOTOS

EB

1

EXISTING VENT THRU ROOF TO BE EXTENDED

A-161A A-526

EA

EXISTING ELECTRICAL EQUIPMENT TO BE REINSTALLED D.S.

HIGH

4

1. CONTRACTOR SHALL MODIFY EXISTING CURBS AS REQUIRED AND REINSTALL EQUIPMENT ON MODIFIED CURBS.

A-161A A-541

SIM.

2. CONTRACTOR TO EXTEND ELECTRICAL AS REQUIRED.

B

SIM.A-161D A-527

2/A-161D

3. CONTRACTOR TO ACCURATELY COORDINATE ALL ROOFING WORK AND FLASHING FOR PROPER SLOPE AND DRAINAGE TO ALL ROOF DRAINS. AT START OF ROOF WORK PROVIDE ELEVATION SHOTS ON THE ROOF WHICH ESTABLISH THE ELEVATION OF ALL ROOF DRAINS NECESSARY TO ACCOMPLISH A DRAINABLE ROOF WITH NO AREAS OF STANDING WATER.

SA

LOW

5

A-161D A-527

R.D.

A-161D A-527

A-161D A-527

SLOPE 1/4" PER FOOT

5

4 A-161D A-527

1

1

ROOF HATCH

A-161D A-529

3/A-161D D

TOP OF NEW ROOF= 27'-8" ±

E

TOP OF EXISTING CURB = 27'-4" ±

2

Ea

A-161D A-528

A-161D A-528

R.D.

TOP OF EXISTING DECK= 26'-8" ±

6

SIM.

NEW OVERFLOW SCUPPER

TOP OF NEW ROOF= 27'-0 1/2" ±

HIGH

SB CA

3/A-161D

LOW

TOP OF EXISTING DECK= 27'-0" ±

R.D.

TOP OF NEW ROOF= 27'-8" ±

4

A-161D A-522

TOP OF EXISTING DECK= 36'-2" ± R.D.

R.D.

7

SLOPE 1/4"" PER FOOT

C

FF

SIM.

SIM.

SIM.

FF

TOP OF NEW ROOF= 36'-6 1/2" ±

A-161D A-527

A-161D A-527

6

SIM.A-161D A-527

4

4

A-161A A-541 FF

HIGH

DOWNSPOUT

NOTES:

4

LOW

EMERGENCY OVERFLOW ROOF DRAIN

A

R.D. HIGH

2-K

E.R.D.

SIM.

A-161A A-541

2-J

ROOF DRAIN

FF

TOP OF NEW ROOF= 37'-7" ±

SIM.

TOP OF EXISTING DECK= 26'-8" ±

NEW OVERFLOW SCUPPER

4

2/A-161D

2-E

1

R.D.

FF

2-A 2-B 2-C

4

TOP OF EXISTING CURB= 27'-4" ±

ROOF LEGEND

TOP OF EXISTING DECK= 27'-0" ±

A-161D A-528

1 A-161D A-528

TOP OF EXISTING DECK= 27'-5 1/2" ±

HIGH

LOW

1

2

A-161A A-527

A-161A A-526

SIM. E.R.D.

SLOPE 1/4" PER FOOT

R.D.

6 A-161D A-528

SIM.

TOP OF NEW ROOF= 27'-4" ± TOP OF EXISTING DECK= 26'-11 1/2" ±

F

SIM.

E.R.D.

E.R.D.

R.D.

FA

FB

R.D. LOW

TOP OF NEW ROOF= 27'-10" ± TOP OF EXISTING DECK= 27'-5 1/2" ±

3

SLOPE 1/4" PER FOOT

SIM.

4/A-161D

4/A-161D

6

TOP OF NEW ROOF= 27'-10" ±

SLOPE 1/4" PER FOOT

SLOPE 1/4" PER FOOT

SIM.

G

A-161D A-528

H SIM.

WA

4

5

4

A-161D A-528

A-161D A-528

A-161D A-528

HA J WB

SENSITIVE SECURITY INFORMATION WARNING: THIS RECORD CONTAINS SENSITIVE SECURITY INFORMATION THAT IS UNDER 49 CFR PARTS 15 AND 1520. NO PART OF THIS RECORD MAY BE DISCLOSED TO PERSONS WITHOUT A "NEED TO KNOW", AS DEFINED IN 49 CFR PARTS 15 AND 1520, EXCEPT WITH WRITTEN PERMISSION OF THE SECRETARY OF TRANSPORTATION. UNAUTHORIZED RELEASE MAY RESULT IN CIVIL PENALTY OR OTHER ACTION. FOR U.S. GOVERNMENT AGENCIES, PUBLIC DISCLOSURE IS GOVERNED BY 5 U.S.C. 552 AND 49 CFR PARTS 15 AND 1520.

WC REV. LTR.

JOB # SHT. #

NORTH

DESCRIPTION

CHK'D

APP'D

OPTION #02 PHASE A PHASE C N.I.C. KEY PLAN - ROOF

1

DATE

ROOF PLAN - OPTION #02

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION MIKE

MONRONEY

AERONAUTICAL

CENTER

OKLAHOMA CITY,

OKLAHOMA

STB RENOVATION 023-STB, FINAL TYPE B DESIGN SUBMITTAL

ROOF PLAN - OPTION #02

A-161D A-161D SCALE: 1/8" = 1'-0" 8'

4'

0

SCALE: 1/8" = 1'-0"

8'

DESIGNED BY

APPROVED BY

DRAWN BY

SEQUENCE #

CHECKED BY WORK ORDER 2011-002262

ISSUED BY

DATE

51

JULY 11, 2012

DRAWING NO.

A-161D