Set of four size U.S. 6 (4 mm) double-pointed knitting needles or size needed to obtain gauge. Cable needle (cn). Safety pin.
ribbing, inc 4 sts evenly across last rnd. 48
Thumb: With RS facing, K6 from safety
sts.
pin. With second double-pointed needle,
1st rnd: *P3. K8. P3. K2. Rep from *
pick up and knit 8 sts at thumb opening.
around.
Divide 14 sts evenly onto 3 needles. Join
2nd rnd: *P3. C4B. C4F. P3. K2tog. yo. Rep
in rnd.
from * around.
Knit in rnds until thumb measures 11/4”
3rd rnd: As 1st rnd.
[3 cm]. Cast off.
ABBREVIATIONS: www.yarnspirations.com/abbreviations K = Knit Beg = Begin(ning) K2tog = Knit 2 stitches C4B = Slip next 2 sts onto together cn and leave at back of work. K2, then K2 from cn. Inc = Increase(ing) C4F = Slip next 2 sts onto P = Purl cn and leave at front of Pat = Pattern work. K2, then K2 from cn. Psso = Pass slipped stitch over Cont = Continue(ity) Rep = Repeat Dec = Decrease(ing)
Rnd(s) = Round(s) RS = Right side Sl1 = Slip next stitch knitwise St(s) = Stitch(es) Yo = Yarn over