*Solar exposure includes all existing development and is measured based on park area including sidewalks.
March 21st – 11:00am
March 21st – 12:00pm
March 21st – 1:00pm
MARCH 21 – SHADOW STUDY
March 21st – 2:00pm
March 21st – 3:00pm
September 21
East Park Solar Exposure
West Park Solar Exposure
Total Park Solar Exposure
11:00am
76.99%
82.28%
79.41%
12:00pm
78.77%
96.67%
86.96%
1:00pm
80.72%
95.76%
87.60%
2:00pm
67.47%
96.38%
80.68%
3:00pm
56.05%
99.29%
75.82%
Average 11am-3pm
72.00%
94.08%
82.09%
*Solar exposure includes all existing development and is measured based on park area including sidewalks.
Sept 21st – 11:00am
Sept 21st – 12:00pm
Sept 21st – 1:00pm
SEPTEMBER 21 – SHADOW STUDY
Sept 21st – 2:00pm
Sept 21st – 3:00pm
Draft_111201
Building Taper
KEY PLAN/
URBAN FABRIC – SITE MASSING MODULATION
6
KEY PLAN/
URBAN FABRIC – SITE MASSING MODULATION
7
URBAN FABRIC – SITE MASSING MODULATION
8
URBAN FABRIC – SITE MASSING MODULATION
9
HOTELRESIDENTIAL FUTURE RESIDENTIAL
KEY PLAN/
URBAN FABRIC – SITE MASSING MODULATION
10
AVERAGE SITE ELEVATION OFFICE BUILDING = 82.98’ HOTEL/RESID.BUILDING = 77.97’ RESIDENCE BUILDING = 77.97’