Simple installation instructions of Pulse electronic fence
I
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
First step:A: L aluminum alloy terminal post and kit assembly diagram
II
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
III
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
B:L aluminum alloy middle post and kit assembly diagram
IV
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
V
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
Self-locking middle post assembly diagram
VI
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
C:Base and support post installation schematic diagram (rod and rod through the base fixed on the wall, two pole spacing between 4-5 meters below) VII
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
D:Terminal post and middle post assembly after rendering (pictured right), F:Wall installation schematic diagram
VIII
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
Second step:A:Decorate a fence alloy wire diagram Decorate alloy wire to use motorized or using proper feeding way, avoid by all means a knot or uneven scene, affect the installation process and effect。
B:The installation of the tightener used (below left)
Third step:The connection of line connector and alloy wire installation drawing (above right)
IX
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
X
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
High voltage lightning arrester installation , and grounding of post installation
Installation of will sign(install one of ten meters spacing)
XI
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
Step 4: the signal cable and power cable laying (pictured right), 1、All the host of the fence of mains supply power, when power lines is longer than 1000 meters, the wire diameter should be appropriate increased; 2 All RS485 network topology node connection should be adopt total linear structure(connect hand in hand way), does not support ring and star structure, so the correct RS485 communication cable connection structure should be above d, e, f, and connection structure of a, b, c, is wrong。 Step 5: the installation of the fence energizer connection When installing fence protection box in the partition of the terminal bar below or near, the appropriate installation height should be determined according to the environment and the total height Then fence host directly hang on the screw on the host rain box’ back, according to the terminal function, as well as the corresponding circuit to connect, connecting the high tension line, should pay attention to high tension line from a connection point to a point in the middle will not be able to have a joint, prevent light leakage phenomenon appeared in the process of transmission。 Note: RS485 signal lines should be separated from high voltage wire casing pipe laying, preventing damage of high voltage breakdown communication line equipment. Install schematic diagram is as follows:
XII
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
XIII
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
Attachment 1: LX - 2008 series single zone fence energizer wiring diagram
XIV
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
Attachment 2: LX - 2008 series double zone fence energizer wiring diagram
XV
Lanstar®
Pause Electric Fence Manufacture--Shenzhen Lanstar Co.,LTD
Attachment 3: LX - 2008 series six binging post fence energizer wiring diagram
XVI