Progress Energy serves this site. www.progressenergy.com
DURHAM COUNTY
R
¯
PA R
540
"
54
55
ELECTRICITY
RALEIGH NC State University RDU Airport
63 S-8
LO
39
¯
RD
Imperial Center
Keystone Te c h n o l o g y Park
HOPSON RD
Wake County has installed water lines in Davis Drive and Little Drive and sewer lines along the Kit Creek basin and Davis Drive. Wake County will extend water and sewer as needed to serve the site.
38 N
Davis Park
52 A
Research Applications — Wake County Unified Development Ordinance
CHIN PAGE RD
35
31
Center
AN EX AL
33
34
IAN
X
LAKEVIEW DR
33
^ The Park
TR
CS
TW
DAVIS DR
"
R
TRIA
NG
LE D
RD K
30 RTP R TP HQ H Q
37
48
51
S-1A 52
ZONING
IBM 500 Campus
32
DR
DR
IC
E
RY RATO
DW
IT
LABO
SE
ST
UT
The Frontier
46
Lab
D
Ø
IN
43 44 45 42 The
Access to Site 32 is from Little Drive to the north. Road construction of Little Drive from Louis Stephens Drive to Davis Drive is complete.
R
54
41
28 , ! 29
22
¯
12
GE BLV
22 23
ROAD ACCESS
SD
S-4
11 24
NE
26
S-21
BLUE RID
20 25
65
40
N DR
HA
UNC Chapel Hill
MAUGHA
6.08 Acres
11.06 Acres** (481,948 SQ. FT.)
S MIAM I
16 16 A 17
30.8 Acres
LOT COVERAGE
RD
BLVD
RD
Meridian Business Campus
LEY
ER DR TW ALEXAND
9
14
¯
NATURAL AREA PRESERVE
Norfolk Southern Railroad
Ø
Ø
! ,
3
4
S-8A
"
Y
ORE
W
MO
PK
EWA Y
JR
T CR
G
HEAS
KIN
NORT
R
RD
HE
PKW
S
LU T
LI
TIN
²
55
RN
AR
ELLIS RD
¯
CO
M
36.88 Acres* TRACT
3A
Duke University
58
KIT
K RD CREE
OU
NT
GAS PK
WY
66
62
PSNC Energy serves this site. www.psncenergy.com
MORRISVILLE
58
Ø
Ø
! ,
AM
CH
EL
RD
Parkside To w n Commons
WE
ST E
RN
KE WA
FR
AY EEW
S-28
S-30 31
KS
VA L
June 2017 Information is current through the above date.
64
DR
M
cC
RI
M
M
ON
PK
W
Y
ST
LEY
S-32
CH
IDE
S-33A
UR
PA R
S-29
CH
CARY
AP
E DR
DR
LY
54
S-26 LITTL
VIS DA
O
L ’KE
¯
"
S-24
* **
All acreages are computer generated. Final acreages will be based on survey of property. Calculation of Lot Coverage is based on the Wake County Unified Development Ordinance which limits buildable area to 30% of total lot size.
THE RESEARCH TRIANGLE PARK
SITE 32
125
250
GEORGE W ATTS HILL DRIVE
DIOSYNTH
375
500
Feet
IVE
SITE 32 (36.88 ACRES)
0
ROADS
DIOSYNTH
EASEMENT
LAKES
SETBACK AREA
RAILROAD BUILDING
NATURAL AREA PRESERVE
BUILDABLE AREA BOUNDARY BUILDABLE AREA
SURFACE COVER MAINTENANCE AREA
NATURAL AREA PRESE RVE CREDITEDTO SITE 32 = 6.08 ACRES
4 FT. CONTOURS
DR
E STREAMS
VIS DA
LITTLE DRIV LEGEND
THE RESEARCH TRIANGLE PARK
SITE 32
ZONING IN THE RESEARCH TRIANGLE PARK WAKE COUNTY Research Applications (RA) The Research Applications District is intended to accommodate research and research applications activities as related to manufacturing, business and science that could benefit from location in or adjacent to The Research Triangle Park or another major center of research activity. The distict is intended to accommodate research facilties, pilot plants, prototype production facilities and other manufacturing operations that require the continual or recurrent application of research knowlege and activity as an integral part of the manufacturing process.
Natural Area Preserves: The district may include natural area preserves. A natural area preserve is a parcel primarily intended to function as permanent open space providing environmental, scenic or recreational benefits to adjacent development and which has been designated on such a recorded plat.
Building Height Limit: The maximum building height is 120 feet, or up to 145 feet with approval of a Special Use Permit, except when the building site is located in a Special Highway Overlay District, in which case the height limit is 60 feet above the centerline elevation of the adjacent highway plus 1 foot of additional height for each 2 feet of building setback exceeding 100 feet. This height limit does not apply where it would limit a building’s height to less than 60 feet above the highest finished grade at the building’s foundation. To date, no Special Highway Overlay Districts have been established in RTP. Minimum Lot Area and Width: Each lot devoted to a central use shall have a width of not less than 300 feet. There is no requirement for lot area. Percentage of Lot Coverage: Not more than 30% of the total area of a lot shall be coved by buildings, driveways, parking areas and loading areas.
Wake County’s Unified Development Ordinance became effective April 17, 2006. For more information, please visit the Wake County Planning Department web page at http://www.wakegov.com/planning/udo.