SOUTHWEST DOWNTOWN UPDATE // 7.24.2017

Brief Overview of SWD’s History and Goals Ryan Tefertiller Realizing the Experience Downtown Master Plan Susan Edmondson / Sarah Humbargar SW Downtown Vision and Master Plan Framework Kristopher Tackas / Jeff Finn Project Element Updates US Olympic Museum BJ Hybl / Susan Edmondson District Parking Structure Greg Warnke Bridge, Streets, Funding Update Kathleen Krager Introduction to the proposed districts Urban Renewal Plan Jariah Walker Special Financing Districts Carl Schueler Economic Impact of implemented vision Bob Cope & Dirk Draper Next Steps Jeff Greene

“...to create a society that matches our scenery.”

MAYOR JOHN SUTHERS

An “Olympicized” city is one that strives for and achieves excellence across all sectors, elevating the quality of life for ALL.

Southwest Downtown What has been accomplished?

Southwest Downtown What has been accomplished?

Pikes Peak Center

Southwest Downtown What has been accomplished?

America the Beautiful Park

Southwest Downtown What has been accomplished?

US 24 / I-25 Interchange

1971 The Downtown Plan 1992 Downtown Action Plan 1998 Springs Community Improvements Program (SCIP) 2001 Confluence Park Master Plan

Southwest Downtown

2001 SW Downtown Urban Renewal Plan

What planning has occured 2007 Imagine Downtown Plan of Development over the last 20+ years? Imagine Downtown Master Plan & Form Based Code Pikes2009 Peak Center 2012 ULI Panel Study for Downtown Colorado Springs 2013 City for Champions 2016 Experience Downtown Master Plan

1971 The Downtown Plan 1992 Downtown Action Plan 1998 Springs Community Improvements Program (SCIP) 2001 Confluence Park Master Plan

Southwest Downtown

2001 SW Downtown Urban Renewal Plan

What planning has occured 2007 Imagine Downtown Plan of Development over the last 20+ years? Imagine Downtown Master Plan & Form Based Code Pikes2009 Peak Center 2012 ULI Panel Study for Downtown Colorado Springs 2013 City for Champions 2016 Experience Downtown Master Plan

Revitalization of Southwest Downtown key to achieving the Experience Downtown Plan of Development Goals: 1

Economic and Cultural Heart of the Region

2 Diverse and Inclusive Place to Live, Integrated with Adjacent Neighborhoods 3

Celebrating and Connecting with Outdoor Recreation and Exceptional Natural Setting

4 A Place for Healthy and Active Lifestyles 5 A Walkable and Bike-Friendly Center Connected through Safe and Accessible Multi-Modal Networks 6 A Leader in Innovative Urban Design and Sustainability 7

Offering an Unbelievable Visitor Experience

8 A Place for Inspiration, Honoring History and Facing the Future

Revitalization of Southwest Downtown key to achieving the Experience Downtown Master Plan Identified as a “Catalytic Development Site” with critical catalytic elements including: US Olympic Museum Pedestrian Bridge Connecting to America the Beautiful Park and the Legacy Loop Plaza and Pedestrian focused streetscape infrastructure, suited for frequent community celebrations of large and small scales High density mixed use development Multi-modal connectyivity infrastructure and access to rail

Southwest Downtown Master Plan Framework and Vision

RENDERINGS

Vision for SW Downtown Extend the energy and mission of the US Olympic Museum into Downtown

V I EW F R O M AMER I CA TH E B EAUTI F UL PA R K RENDERINGS

V I EW F R O M AMER I CA TH E B EAUT I F U L PA R K

T H E AT E R

PL A ZA S UM M ER

PL A ZA S UM M ER

Vision for SW Downtown Extend the energy and mission of the US Olympic Museum into Downtown New Urban Neighborhood Focused on Health, Wellness and the Outdoors / Great Place to Live, Work, Stay and Play

Vision for SW Downtown Extend the energy and mission of the US Olympic Museum into Downtown New Urban Neighborhood Focused on Health, Wellness and the Outdoors / Great Place to Live, Work, Stay and Play Unique, Vibrant, Memorable and Functional Public Spaces

Vision for SW Downtown Extend the energy and mission of the US Olympic Museum into Downtown New Urban Neighborhood Focused on Health, Wellness and the Outdoors / Great Place to Live, Work, Stay and Play Unique, Vibrant, Memorable and Functional Public Spaces Connect the America the Beautiful Park to the Downtown and Downtown to the Park

Vision for SW Downtown Extend the energy and mission of the US Olympic Museum into Downtown New Urban Neighborhood Focused on Health, Wellness and the Outdoors / Great Place to Live, Work, Stay and Play Unique, Vibrant, Memorable and Functional Public Spaces Connect the America the Beautiful Park to the Downtown and Downtown to the Park Provide an economic-stimulating environment where significant downtown investment

94

Achievable Development Plan for the next 20 years 5.2M SF of Mixed-Use Urban Development

- 4,500 Residential Units



- 750,000 SF of New Office Space



- 150,000 SF of Retail / Restaurant Spaces



- 500 Hotel Rooms

Estimated $1.8B new development / 4 phases Phase 1 development begins 2018

11

W D O W N TO W N D I S T R I C T F R A M E WO R K / M U S E U M P R E C I N C T

13

CUCHARRAS ST

14 11

12

13

11

2 CUCHARRAS ST

4

United States Olympic Museum (USOM)

14

USOM Cafe USOM Olympic Plaza

4

Bridge to America the Beautiful Park

5

Champion’s Boulevard

6

Champion’s Plaza3

7

4 Bridge to America the Beautiful Park Bike Station + Visitor Kiosk

8

Champion’s Boulevard Rooftop Greenhouses

4

1

United States Olympic Museum (USOM)

2

USOM Cafe

1

6

3

11

5

8

12

VERMIJO AVE

7

7

Bike Station + Visitor Kiosk

8

Rooftop Greenhouses

9

Hotel + Condo Tower

10

Office Tower

11

Hotel + Condo Tower Urban Residential9Buildings

12

Interior Block Courtyards

10

Office Tower

11

Urban Residential Buildings

13

Pikes Peak Center12

14

13 Pikes Peak Center County Parking Garage

Interior Block Courtyards

12

8 7

10

9 10

9

CASCADE AVE

Champion’s Plaza

11

6

SIERRA MADRE ST

6

1

SIERRA MADRE ST

USOM Olympic Plaza

5

14

11

2

3

100’

VERMIJO AVE

12

SAHWATCH ST

2

5

SAHWATCH ST

1

3

COSTILLA ST COSTILLA ST

County Parking Garage

200’

100’

400’ 200’

400’

111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903 7 1 9 . 5 9 3 . 2 6 0 0

S W / D O W N TO W N R E V I TA L I Z AT I O N U N I T E D S T A T E S O LY M P I C M U S E U M

//

PEDESTRIAN BRIDGE

//

PUBLIC REALM IMPROVEMENTS

//

D I S T R I C T PA R K I N G

11

W D O W N TO W N D I S T R I C T F R A M E WO R K / M U S E U M P R E C I N C T

13

CUCHARRAS ST

14 11

12

13

11

2 CUCHARRAS ST

4

United States Olympic Museum (USOM)

14

USOM Cafe USOM Olympic Plaza

4

Bridge to America the Beautiful Park

5

Champion’s Boulevard

6

Champion’s Plaza3

7

4 Bridge to America the Beautiful Park Bike Station + Visitor Kiosk

8

Champion’s Boulevard Rooftop Greenhouses

4

1

United States Olympic Museum (USOM)

2

USOM Cafe

1

6

3

11

5

8

12

VERMIJO AVE

7

7

Bike Station + Visitor Kiosk

8

Rooftop Greenhouses

9

Hotel + Condo Tower

10

Office Tower

11

Hotel + Condo Tower Urban Residential9Buildings

12

Interior Block Courtyards

10

Office Tower

11

Urban Residential Buildings

13

Pikes Peak Center12

14

13 Pikes Peak Center County Parking Garage

Interior Block Courtyards

12

8 7

10

9 10

9

CASCADE AVE

Champion’s Plaza

11

6

SIERRA MADRE ST

6

1

SIERRA MADRE ST

USOM Olympic Plaza

5

14

11

2

3

100’

VERMIJO AVE

12

SAHWATCH ST

2

5

SAHWATCH ST

1

3

COSTILLA ST COSTILLA ST

County Parking Garage

200’

100’

400’ 200’

400’

111 SOUTH TEJON ST | SUITE 222 CO COLORADO SPRINGS 80903 7 1 9 . 5 9 3 . 2 6 0 0

S W / D O W N TO W N R E V I TA L I Z AT I O N U N I T E D S T A T E S O LY M P I C M U S E U M

//

PEDESTRIAN BRIDGE

//

PUBLIC REALM IMPROVEMENTS

//

D I S T R I C T PA R K I N G

DOWNTOWN COLORADO SPRINGS

MASSING MASTER PLAN - PROGRAM PERSPECTIVE STACK

Phase 1 Development - Concept Architectural Plans PROGRAM:

TARGET GSF

MASSING GSF

NO. OF FLOORS

RESIDENTIAL

(200,000)

197,000

17

HOTEL

(270,000)

267,000

19

OFFICE

(300,000)

312,000

15

RETAIL

(100,000)

119,000

2

VE

RM

IJO

AV E

CHAMPION’S PLAZA E DR

ST

A

AM RR

E

SI

MUSEUM

N

DOWNTOWN COLORADO SPRINGS - CONCEPT STUDY

OCTOBER 15, 2016

© SOM 2016

20

DOWNTOWNCOLORADO COLORADOSPRINGS SPRINGS DOWNTOWN

MASSING MASTER PLAN - SITE PROGRAM PERSPECTIVE STACK SECTION AA

PROGRAM:

Phase 1 Development - Concept Architectural Plans RESIDENTIAL PROGRAM: TARGET GSF HOTEL

MASSING GSF

NO. OF FLOORS

OFFICE RESIDENTIAL

(200,000)

197,000

17

RETAIL HOTEL

(270,000)

267,000

19

OFFICE

(300,000)

ROOF EL. +270.0

LEVEL 19 LEVEL 18

LEVEL 18 EL. +244.0

LEVEL 17

+230’

RETAIL

(100,000)

LEVEL 19 EL. +257.0

312,000

15

119,000

LEVEL 17 EL. +231.0

LEVEL 16

2

LEVEL 16 EL. +218.0

LEVEL 15

+202’

LEVEL 15 EL. +205.0

LEVEL 14

LEVEL 14 EL. +192.0

LEVEL 13

LEVEL 13 EL. +179.0

LEVEL 12

+164’

LEVEL 12 EL. +166.0

LEVEL 11 LEVEL 11 EL. +153.0

LEVEL 10 LEVEL 10 EL. +140.0

LEVEL 9 LEVEL 9 EL. +127.0

LEVEL 8 LEVEL 8 EL. +114.0

LEVEL 7 LEVEL 7 EL. +101.0

LEVEL 6 LEVEL 6 EL. +88.0

VE

RM

LEVEL 5

IJO

ROOF EL. +66.5

LEVEL 3

LEVEL 5 EL. +75.0

LEVEL 4

AV E

CHAMPION’S PLAZA

LEVEL 3 EL. +52.0

LEVEL 2

LEVEL 2

LEVEL 1

LEVEL 1

GROUND LEVEL

GROUND LEVEL

E DR

LEVEL 2

LEVEL 2 EL. +37.5

A

AM RR

LEVEL 1

LEVEL 1 EL. +18.0

GROUND LEVEL

GROUND LEVEL

LEVEL 4 EL. +62.0

LEVEL 3

E SI

ST

LEVEL 3 EL. +49.0

LEVEL 2 LEVEL 2 EL. +36.0

LEVEL 1 LEVEL 1 EL. +18.0

GROUND LEVEL GROUND FLOOR EL. +00.0

GROUND FLOOR EL. +00.0

PARKING LEVEL 1

P1 LEVEL EL. -13.0

PARKING LEVEL 2 P2 LEVEL EL. -26.0

P1 LEVEL EL. -13.0

MUSEUM

P2 LEVEL EL. -26.0

A

A

DOWNTOWNCOLORADO COLORADOSPRINGS SPRINGS--CONCEPT CONCEPTSTUDY STUDY DOWNTOWN

OCTOBER 15, 2016 OCTOBER

N

©©SOM SOM2016 2016

33 20

DOWNTOWN COLORADO SPRINGS NDG BLOCK | CONCEPT STUDY - JULY 19, 2017

US Olympic Museum Design + Construction Update

VIEW FROM V E R MIJO AV E .

T H E AT E R

PL A Z A W IN T E R

PL A Z A W IN T E R

6. 0 T HE PA R A DE O F NATIO NS S W D O W N TO W N 6.1

U S O LY M P I C M U S E U M A N D H A L L O F F A M E

ANTICIPATIO N BUILDS: WAITING TO ENTER THE O LYM PIC STA D IU M R END ER ING

United States Olympic Museum | Colorado Springs, CO 111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903 7 1 9 . 5 9 3 . 2 6 0 0

PROJECT NO

PHASE

14038.00

100 SD

S W / D O W N TO W N R E V I TA L I Z AT I O N

U N I T E D S T A T E S O LY M P I C M U S E U M / / P E D E S T R I A N B R I D G E / / P U B L I STRUCTURE // INFRASTRUCTURE IMPROVEMENTS

1 0 . 0 H A L L O F FA M E S W D O W N TO W N

U S O LY M P I C M U S E U M A N D H A L L O F F A M E

1 0 .0 H A L L O F FA M E O V ERV I EW R EN DER I N G

United States Olympic Museum | Colorado Springs, CO 111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903 7 1 9 . 5 9 3 . 2 6 0 0

PROJECT NO

PHASE

14038.00

100 SD

S W / D O W N TO W N R E V I TA L I Z AT I O N

U N I T E D S T A T E S O LY M P I C M U S E U M / / P E D E S T R I A N B R I D G E / / P U B L STRUCTURE // INFRASTRUCTURE IMPROVEMENTS

US Olympic Museum Ground Breaking - 6.10.2017

Construction progress as of 7.21.2017

Recent Achievements and Next Steps Funding Milestones Completed Construction Drawings Completed Building Permit Issued Ground Breaking and Community Celebration Site and Building Foundation work will continue through September Exhibit Designs are being Finalized Scheduled to Open in 2019

Southwest Downtown Public Improvements Parking Structure Bridge, Vermijo/Sierra Madre Pikes Peak Center

COS PARKING ENTERPRISE 2,700 STALLS / 2,400 METERS

What has been completed to date?

Parking Solutions Study was performed for the SWURA and completed in 2016

Phase I of the planned development by the master developer consists a mixed use facility

Subterranean parking 1,000 parking spaces to serve USOM Phase I of commercial development A two-phase RFP was developed to provide Architectural and Engineering design services

June 29, 2017 I Anderson Mason Dale Architects

June 29, 2017 I Anderson Mason Dale Architects

June 29, 2017 I Anderson Mason Dale Architects

Sahwatch St.

Sierra Madre St.

Section through entry at Sierra Madre

June 29, 2017 I Anderson Mason Dale Architects

Section through entry at Sierra Madre What is next?

Parking Solutions Study was performed for the SWURA and completed in 2016

Phase I of the planned development by the master developer consists a mixed use facility

Sierra Madre St.

Subterranean parking 1,000 parking spaces to serve USOM Phase I of commercial development A two-phase RFP was developed to provide Architectural and Engineering design services Phase I - 30% design effort + cost estimation Proposed Funding / Plan of Finance Phase II - Final design and construction documentation Construction Management June 29, 2017 I Anderson Mason Dale Architects

AMERICA THE BEAUTIFUL PARK & LEGACY LOOP CIMINO DRIVE

- 5’

- 4’ - 3’

- 4’

- 4’

- 3’

- 2’ +17.5’ +26’

USOM

+19.5’

+ 5’

S. CUCHARRAS ST.

IJO AVE.

DOWNTOWN SERVICE DRIVE

W . COSTILLA ST.

SOUTH SIERRA MADRE STREET

COMPOSITE METAL PANEL

CONCRETE W/ EPOXY FINISH

X-TEND MESH

STRUCTURAL STEEL

01

E: A place like no other that people remember and return to. Flexible

04

Timeless

r-round use

y to come

02

Destination

05

Catalyst

03

Sustainability

06

Unique

standard

Colorado

n District.

lization and

n Zone

12’ Cafe

Vermijo Street - Existing Conditions

Walk Hell S trip

Angled Parking

Drive Lane

Drive Lane

Parking Med ian Parking

Drive Lane

Drive Lane

Angled Parking

Walk

Planting

Vermijo Street - Existing Conditions

Cafe

Walk W. Qty.

Parking

Stepout

Drive Lane

Drive Lane

Parking Stepout

W. Qty.

Walk

Pedestrian Zon e Cafe

1 13

block 1 3 10 2

7 5

9 4

6

block 2 8 6

12

10

block 3 (future phase) 10

5

8 6

TEJON STREET

11

13 12

CASCADE AVENUE

B.

SAHWATCH STREET

SIERRA MADRE STREET

13 FLEXIBLE EVENT PLAZA

12

13

12

VERMIJO AVENUE 7

7

0

30'

60'

SCALE: 1" = 60'-0"

NORTH

120'

US Olympic Museum Construction Opening

2016 2017

Streetscape Improvements (Vermijo & Sierra Madre) Preliminary Design (30%) Final Design (100%) Contractor Selection Construction - Sierra Madre Construction - Vermijo Installation (Lighting, Landscaping, Other) Opening Bridge to America the Beautiful Park Preliminary Design (30%) Final Design (100%) Contractor Selection Construction Opening Parking Structure Preliminary Design (30%) Public / Private Plan of Finance Final Design (100%) Contractor Selection Construction Opening Phase 1 Development Design Construction Opening

2017 2018

2018 2019

2019 2020

SW Downtown Sources / Uses of Funding: Pedestrian Bridge, Olympic Museum to ATBP Funding Source Amount

Southwest Downtown Public Improvements

USOM Tourism Bonds

$ 7,100,000

PPRTA (Capital A List)

$ 3,500,000

TOTAL COST $10,600,000

Vermijo/Sierra Madre Street Improvements Funding Source Amount

Bridge, Vermijo/Sierra Madre, USOM Commitment USOM RTA Bonds Parking Structure PPRTA (Program Funds) Pikes Peak Center

PPRTA (Maintenance Fund)

$ 250,000 $ 1,700,000 $ 400,000 $ 2,800,000

TOTAL COST $5,150,000

Parking Structure - Costs & Funding Plan TBD (1) Funding for Greenway Trail Improvements. $3.5 M preapproved by PPRTA Board (2) Funding from Intersection Improvement Program Funds, Capitol A List (3) Estimated Cost to repair concrete, mill and overlay existing street blocks

Southwest Downtown Districts Urban Renewal Plan + Special Financing Districts

Purpose of the Urban Renewal Plan: Eliminate and stop the spread of blighted conditions within/adjacent to Southwest Downtown and encourage reinvestment into an underutilized area of Downtown SW Downtown URA History: Existing SW Downtown Urban Renewal Plan was adopted by Council in 2001 Proposed / New URA Plan for Southwest Downtown will back out parcels from that district and propose new objectives and goals The existing URA Plan (2001) will remain in effect on the left over parcels until the plan expires

SW Downtown existing conditions: No curb, gutter or sidewalks Insufficient stormwater infrastructure Crumbling streets and roadways Insufficient Utility Infrastructure Environmental Issues No pedestrian improvements Designated as “blighted”

DRAFT :: 12/22/2015 :: NOT FOR DISTRIBUTION

S W D O W N TO W N P U B L I C P R I VAT E PA RT N E R S H I P S I N S W D O W N TO W N

Urban Renewal Plan + Special Financing Districts P U B L I C P R I VAT E PA RT N E R S H I P R O L E S + TO O L S I N S O U T H W E S T D O W N TO W N ?

SW SW DOWNTOWN DOWNTOWN

URBAN RENEWAL IMPROVEMENT DISTRICT AUTHORITY RESPONSIBILITY // // RESPONSIBILITY COLLECTING 1 TIME PROPERTY TAX FUNDS INCREMENT FOR SALES MULTI-PHASED TAX INCREMENT IMPROVEMENTS IN SWD COMPOSITION // COMPOSITION // MEMBERS APPOINTED COMMUNITY MULTI-MEMBER BOARD TO CSURA BOARD MIX OF MUNICIPALITIES DATE EST. // DATELATE EST.2017 // ASAP FUNDING // FUNDING // EXISTING MILL LEVY = 62.749 MILLS FEE ASSESSMENT SALES TAX INCREMENT

111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903 7 1 9 . 5 9 3 . 2 6 0 0

SW DOWNTOWN

SW DOWNTOWN

RESPONSIBILITY RESPONSIBILITY // // DISTRICT OPERATIONS & FUNDING TOOL TO COLLECT MAINTENANCE, & MILL LEVY ONMARKETING RESIDENTIAL RELATED UPGRADES DEVELOPMENT

RESPONSIBILITY RESPONSIBILITY // // FINANCIAL TOOL TO COLLECT DISTRICT OPERATIONS, MILL LEVY ON +RESIDENTIAL MAINTENANCE MARKETING DEVELOPMENT

BUSINESS IMPROVEMENT DISTRICT

METRO DISTRICT

COMPOSITION // // COMPOSITION DISTRICT PROPERTY PROPERTY OWNERS

OWNERS / TENANT DESIGNATED

COMPOSITION // DISTRICT RESIDENTIAL COMPOSITION // PROPERTY OWNERS + PROPERTY OWNERS RESIDENTS

DATE DATEEST. EST. // // MAY / NOV 2016 ELECTION 2017

DATE DATE EST. EST. // // MAY / NOV 2016 ELECTION 2017

FUNDING // // FUNDING MILL LEVY FOR DEBT O&M MILL+LEVY PUBLICIMPROVEMENT IMPROVEMENT FEE FEE PUBLIC

FUNDING // // FUNDING MILL LEVY FOR DEBT O&M MILL+LEVY

S W / D O W N TO W N R E V I TA L I Z AT I O N U N I T E D S T A T E S O LY M P I C M U S E U M

//

PEDESTRIAN BRIDGE

//

PUBLIC REALM IMPROVEMENTS

//

D I S T R I C T PA R K I N G

Tax Revenues

Mechanics of Urban Renewal

Existing Property produces very little revenue for taxing entities BASE Time

Tax Revenues

Mechanics of Urban Renewal

INCREMENT

FUTURE REVENUES REINVESTED BACK INTO PUBLIC INFRASTRUCTURE

Property produces very little revenue for taxing entities BASE

Time 25 YEARS URBAN RENEWAL PLAN TERM

Mechanics of Urban Renewal Tax Revenues

Significant increase in property value equating to an increase in revenue available for taxing entities once the Urban Renewal term expires

INCREMENT

FUTURE REVENUES REINVESTED BACK INTO PUBLIC INFRASTRUCTURE

Property produces very little revenue for taxing entities BASE

Time 25 YEARS URBAN RENEWAL PLAN TERM

Tax Revenues

Mechanics of Urban Renewal

The accelerated growth in value DOES NOT OCCUR if the tax increment is not reinvested back into public improvements.

Time

CONCEPTUAL DRAFT CONFIDENTIAL WORK PRODUCT

SW D OW N TOW N P R O P O S E D N E W U R A B O U N DA RY I-25

List of Public Improvements

Pedestrian Bridge Pedestrian Improvements / Champion’s Plaza Olympic Museum Site Infrastructure District Parking Structure(s) America the Beautiful Park Improvements Parkside Improvements Stormwater Improvements District Utility Infrastructure Cimino Street Road Extension Cimarron / ATBP Trail Connector Roads / Curb / Gutter Public Art Secondary Streetscapes Environmental Remediation Data Infrastructure URA Eligible Costs

6/15/2017

PROPOSED SW DOWNTOWN URBAN RENEWAL AREA BOUNDARY Parcels included in the SW Downtown BID & MD #

P4a

Development Building Program used to calculate incremental tax revenues

P3 P1 P2

S9b

S9a

M8

S6b

S6a

M4b

M10

Sierra Madre St.

M4a

M3b

M3a

Sahwatch St. M5a S7c

111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903

S W / D O W N TO W N R E V I TA L I Z AT I O N

Kiowa St.

Bijou St.

Pikes Peak Ave.

Colorado Ave.

Vermijo Ave.

Costilla St.

Cimarron St.

Moreno Ave.

Rio Grande St.

Cascade Ave.

6

DRAFT :: 12/22/2015 :: NOT FOR DISTRIBUTION

S W D O W N TO W N P U B L I C P R I VAT E PA RT N E R S H I P S I N S W D O W N TO W N

Urban Renewal Plan + Special Financing Districts P U B L I C P R I VAT E PA RT N E R S H I P R O L E S + TO O L S I N S O U T H W E S T D O W N TO W N ?

SW SW DOWNTOWN DOWNTOWN

URBAN RENEWAL IMPROVEMENT DISTRICT AUTHORITY RESPONSIBILITY // // RESPONSIBILITY COLLECTING 1 TIME PROPERTY TAX FUNDS INCREMENT FOR SALES MULTI-PHASED TAX INCREMENT IMPROVEMENTS IN SWD COMPOSITION // COMPOSITION // MEMBERS APPOINTED COMMUNITY MULTI-MEMBER BOARD TO CSURA BOARD MIX OF MUNICIPALITIES DATE EST. // DATELATE EST.2017 // ASAP FUNDING // FUNDING // EXISTING MILL LEVY = 62.749 MILLS FEE ASSESSMENT SALES TAX INCREMENT

111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903 7 1 9 . 5 9 3 . 2 6 0 0

SW DOWNTOWN

SW DOWNTOWN

RESPONSIBILITY RESPONSIBILITY // // DISTRICT OPERATIONS & FUNDING TOOL TO COLLECT MAINTENANCE, & MILL LEVY ONMARKETING RESIDENTIAL RELATED UPGRADES DEVELOPMENT

RESPONSIBILITY RESPONSIBILITY // // FINANCIAL TOOL TO COLLECT DISTRICT OPERATIONS, MILL LEVY ON +RESIDENTIAL MAINTENANCE MARKETING DEVELOPMENT

BUSINESS IMPROVEMENT DISTRICT

METRO DISTRICT

COMPOSITION // // COMPOSITION DISTRICT PROPERTY PROPERTY OWNERS

OWNERS / TENANT DESIGNATED

COMPOSITION // DISTRICT RESIDENTIAL COMPOSITION // PROPERTY OWNERS + PROPERTY OWNERS RESIDENTS

DATE DATEEST. EST. // // MAY / NOV 2016 ELECTION 2017

DATE DATE EST. EST. // // MAY / NOV 2016 ELECTION 2017

FUNDING // // FUNDING MILL LEVY FOR DEBT O&M MILL+LEVY PUBLICIMPROVEMENT IMPROVEMENT FEE FEE PUBLIC

FUNDING // FUNDING MILL LEVY FOR DEBT O&M MILL+LEVY

S W / D O W N TO W N R E V I TA L I Z AT I O N U N I T E D S T A T E S O LY M P I C M U S E U M

//

PEDESTRIAN BRIDGE

//

PUBLIC REALM IMPROVEMENTS

//

D I S T R I C T PA R K I N G

Southwest Downtown Special Districts: Proposed mill levy assessment dedicated to initial and ongoing capital infrastructure and district maintenance/upkeep Business Improvement District

+ Commercial Assessment for Capital and O+M + Public Improvement Fee on Retail Sales for Capital and O+M

Metropolitan Districts No. 1 & 2

+ Residential Assessment for Capital and O+M

Districts will be voluntary and expandable as adjacent property owners choose to be included Vertically-separated Special Districts

Vertically-Separated Districts

LEVEL 20 LEVEL 19 LEVEL 18 LEVEL 17

Residential over ground level retail

Hotel over ground level retail

LEVEL 16 LEVEL 15 LEVEL 14 LEVEL 13 LEVEL 12 LEVEL 11 LEVEL 10 LEVEL 9 LEVEL 8

Residential Beyond

LEVEL 7 LEVEL 6 LEVEL 5

LEVEL 6 LEVEL 4 LEVEL 5 LEVEL 3 LEVEL 4 LEVEL 2 LEVEL 3

LEVEL 1

LEVEL 2 THEATER LEVEL 2

HOTEL CONF LEVEL

LEVEL 1

RETAIL GROUND LEVEL

RETAIL GROUND LEVEL

RETAIL GROUND LEVEL

PARKING LEVEL 1 PARKING LEVEL 2

Residential & Commercial Property located on the Same Parcel

A

A

CONCEPTUAL DRAFT CONFIDENTIAL WORK PRODUCT

SW D OW N TOW N P R O P O S E D D I ST R I CT B O U N DA R I ES

List of Public Improvements

I-25

Pedestrian Bridge Pedestrian Improvements / Champion’s Plaza Olympic Museum Site Infrastructure District Parking Structure(s) America the Beautiful Park Improvements Parkside Improvements Stormwater Improvements District Utility Infrastructure Cimino Street Road Extension Cimarron / ATBP Trail Connector Roads / Curb / Gutter Public Art Secondary Streetscapes Environmental Remediation Data Infrastructure

6/15/2017

PROPOSED SW DOWNTOWN BID + MD BOUNDARIES Parcels included in the SW Downtown BID & MD

Sierra Madre St.

Sahwatch St.

111 SOUTH TEJON ST | SUITE 222 COLORADO SPRINGS CO 80903 7 1 9 . 5 9 3 . 2 6 0 0

S W / D O W N TO W N R E V I TA L I Z AT I O N

Kiowa St.

Bijou St.

Pikes Peak Ave.

Colorado Ave.

Vermijo Ave.

Costilla St.

Cimarron St.

Moreno Ave.

Rio Grande St.

Cascade Ave.

8

U N I T E D S T A T E S O LY M P I C M U S E U M / / P E D E S T R I A N B R I D G E / / P U B L I C R E A L M I M P R O V E M E N T S / / D I S T R I C T P A R K I N G S T R U C T U R E / / I N F R A S T R U C T U R E I M P R O V E M E N T S / / U R B A N R E N E W A L / / P R I VAT E D E V E LO P M E N T

what is the ROI? Fiscal + Social Impacts

Fiscal Investment = Jobs = Revenue

Investment = $2B over 20 yrs

Permanent Jobs = 5,293

Investment = $2B over 20 yrs

Const. Jobs = 1,358

Net New Sales Taxes = $270M

5,293

Investment = $2B over 20 yrs

1,358

Net New Prop Taxes = $90M

Social What do +5,000 new jobs mean to COS? What can COS do with more revenue? What will 4,500 new residences mean to Downtown? What would happen if community pride in Colorado Springs was elevated?

Goals of City Council Promote Job Creation Build Community & Collaboration Invest in Infrastructure Excel in City Services

Does the transformation of SW Downtown align with your goals?

What actions has Council taken to date showing it does?



Adoption of previous Downtown Planning Efforts



Adoption of existing SWD Urban Renewal Area



America the Beautiful Park



Experience Downtown Master Plan



Dedication of ROW for the US Olympic Museum



LART funds invested in the US Olympic Museum

What remaining actions will Council consider in the next 6 - 8 months?



New SWD Urban Renewal Area Plan End of 2017



Forming Special Financing Districts (BID + MD) Late August / September 2017



Finance Plan for SW Downtown Parking Structure Fall of 2017 / Beginning 2018

Questions?

SOUTHWEST DOWNTOWN UPDATE // 7.24.2017