HOOKWOOD
GATWICK AIRSIDE ROADS MAP EFFECTIVE IMMEDIATELY Expires 1st April 2018
PIER 5
Ordnance Survey Grid North
574 573
64
572
Q
65
571 570
AP-1 569 568
66
FUEL FARM
567 566 565
1 2
67
2
1
67
1 1
2
2
67
68 564 563
68
68
NORTH TERMINAL
68
Q
R
562 561 560
AP-13
POLICE STATION
AP-2
559 558 557
CARGO CENTRE
46
47 555
PIER 4
48
554 157
Hangar 9
154
153
553
235
54
551
158
552
QB 159
52
53
51
L
49
50
36 35
53R
L L
180 152
150
42
KA
32
20
20
41
31
K
5
5
5 5
5
5
ONE WAY
5
5
20
STOP
5
AP-10
33
43
T
232
S
K 25
161
231 172
FIRE TRAINING GROUND
P
109 107 106 105 104 5
175
110
5
174
160
5
177
5
176
ONE WAY
U
102
PIER 6
AP-11
HANGAR 7
101
112 113
111
5
AREA 2
233
178
Q
QA
38
PIER 3
R
5
MAINTENANCE
RA 151
34
5
234
37
R
173
Q
136 135
134
133
132
131
170
AP-12 RVP-N
21
130
19
15
17
13
SOUTH TERMINAL
PIER 2
N
NA
27
230
23
28
24
22
20 18
14
16
12 11
10
171
145
FIRE STATION
144
143
142
141
140
P 1
J J
J
J
M
J
C
W
AN
PIER 1
3
AN AN
AN
4
P FR
5
V
A AS
H
AP-9
2
Z
Z
G
GR E
CR
D
W1
M BR
B
AP-5
AP-8a
Y3
Y
RVP-S
AP-8
MAINTENANCE AREA 1
AP-14
HANGAR 6
LOWFIELD HEATH
SPEED RESTRICTIONS Most Airside Roads = 20 mph YO UR LO N D O N A IRPORT
The information shown on this drawing is given without obligation or warranty; the accuracy thereof cannot be guaranteed. This drawing may show existing services routes and equipment. The information is taken from field observations, topographical survey, microfilm records and service providers' data.
Service Road Interstand Road
Various services, pipes, valves, siphons, stub connections, electrical trays etc., may not be shown but their presence should be anticipated.
This drawing may contain some Ordnance Survey Landline and Raster data. OS Copyright Acknowledgement. Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown Copyright and database right. Licence No. 100048869
Document Uncontrolled when printed
GRAPHICAL DATA TEAM
Controlled Crossing
No liability of any kind whatsoever can be accepted by Gatwick Airport Limited, its agents or servants, for any error or omission. A Catscan must be used to verify and establish the actual position of all mains, pipes, electrical services and other equipment on site by the contractor, prior to commencement of any building alterations. Please note that Baseplans are constantly being updated with as - built information. Whilst they are believed to be accurate, it is possible that data from recently completed projects has not been passed to the GDT or is currently being processed. Critical dimensions must be checked on site as the GDT cannot be held responsible for inaccuracies in the data received. To obtain the most recent baseplan email
[email protected].
Title
Semi Controlled Crossing RVP-S AP5
Rendezvous Point Access Point
email:
[email protected] www.gatwickairport.com
MASTER DRAWING AIRSIDE ROADS LAYOUT SHOWING AP SECURITY CONTROL POSTS
Drawing Originator
GATWICK AIRPORT LTD Drawn By
GRAPHICAL DATA TEAM (GDT) GDT Request No.
Drawn Date
23/10/2017
Scale
1:5000
GDT Drawing No
20000-XX-O-100-M2-000007
Revision
RD ISO A1 Landscape