step 1 single sided shot clock installation - Nevco

Report 5 Downloads 54 Views
6

STEP 1 D

5

4

3

2

1

SINGLE SIDED SHOT CLOCK INSTALLATION

Rev

A

Attach brackets to post using U-bolts or bent threaded rod (by others).

D

8"

Pi p e 2- Pipe 1/ 2" Pi pe

Shot Clock Mounting

C

4"

C

U-bolt (by others)

984-0339 bracket (provided by Nevco)

21 in Hardware Post Dia. U-bolt Dia. 3/8" 2" - 3" 1/2" 4" - 8"

24 1/4 in

B

2" Pi pe 3" Pi pe 6" Pi p 6e 5/ 8" Pi pe

Shot Clock Mounting

Hole locations in bracket match standard U-bolt dimensions. Determine post size and attach corresponding side of bracket to the post as shown on this sheet.

U-bolt (by others)

B

SSC-T5 Indoor LED Shot Clock Installation A

Nevco, Inc. Greenville, Illinois 62246 Drawing No. 241-0452

Last ECO Drawn KAB 6

5

4

3

Date 4/1/2016 2

Sheet 1 of 6 1

A

6

5

4

3

2

1

DOUBLE SIDED SHOT CLOCK INSTALLATION

STEP 1

Rev

A

Attach brackets to post D using straight bolts, washers, and nuts (by others).

D 8"

Pi pe 4" P i 21/ pe 2" Pip

Shot Clock Mounting

e

C

C

2"

984-0339 bracket (provided by Nevco)

21 in

Bolts, Washers, and Nuts (by others)

24 1/4 in

Hardware Post Dia. Bolt Dia. 3/8" 2" - 3" 1/2" 4" - 8"

B

Pi p e 3" Pip e 6" Pi p 6e 5/ 8" Pi p

Shot Clock Mounting e

Hole locations in bracket match standard U-bolt dimensions. Determine post size and attach corresponding side of bracket to the post as shown on this sheet.

B

SSC-T5 Indoor LED Shot Clock Installation A

Nevco, Inc. Greenville, Illinois 62246 Drawing No.

Last ECO Drawn KAB 6

5

4

3

241-0452

Date 4/1/2016 2

Sheet

of

2

6 1

A

6

5

4

3

2

1

STEP 2

Rev

A

Attach 984-0339 brackets on the back side of the shot clocks using 1/4" washers (024-0579) and 1/4" bolts (024-0909) provided by Nevco. (4 places)

D Attach 984-0339 brackets on the back side of the shot clock using 1/4" washers (024-0579) and 1/4" bolts (024-0909) provided by Nevco. (4 places)

D

C

C

DOUBLE SIDED SHOT CLOCK INSTALLATION

B

SINGLE SIDED SHOT CLOCK INSTALLATION

SSC-T5 Indoor LED Shot Clock Installation

A

Nevco, Inc. Greenville, Illinois 62246 Drawing No.

Last ECO Drawn KAB 6

5

B

4

3

241-0452

Date 4/1/2016 2

Sheet

3

of

6 1

A

6

5

4

3

2

1

Rev

A

For double sided shot clock installations, run 3' ethernet cable (603-2688) from the output jack of the first shot clock to the input jack of the second shot clock.

D

INPUT

OUTPUT

INPUT

D

OUTPUT

C

C

B

B

Connect 25' ethernet cable (603-2689) from IAD box to input jack on the back of the shot clock. See drawing 275-0803 for IAD connection.

For single sided shot clock installations, the 3' ethernet cable (603-2688) is not required.

SSC-T5 Indoor LED Shot Clock Installation

A

Nevco, Inc. Greenville, Illinois 62246 Drawing No.

Last ECO Drawn KAB 6

5

4

3

241-0452

Date 4/1/2016 2

Sheet

of

4

6 1

A

6

5

4

3

2

1

Rev

A

D

D External horn box can mount to the top or bottom of the shot clock.

Align standoffs with holes in bracket.

C

C

Attach standoffs to the bracket using 1/4-20 x 3/4" bolts and washers provided by Nevco

Connect 2-pin accessory cable from IAD box to leads on the back of the horn box. See drawing 275-0803 for IAD connection.

Thread provided standoffs (024-1048) into bottom of external horn box.

B

B

EXTERNAL HORN INSTALLATION

SSC-T5 Indoor LED Shot Clock Installation

A

Nevco, Inc. Greenville, Illinois 62246 Drawing No.

Last ECO Drawn KAB 6

5

4

3

241-0452

Date 4/1/2016 2

Sheet

5

of

6 1

A

6

5

4

3

2

1

WALL MOUNTED SHOT CLOCK INSTALLATION D

Rev

A D

Attach 984-0339 brackets on the back side of the shot clock using 1/4" washers (024-0579) and 1/4" bolts (024-0909) provided by Nevco. (4 places)

Wall

3 1/4 in

Attach Indoor Accessory Driver to wall between strut channel and make all wiring connections prior to installing shot clock on brackets. (attachments by others)

C

21 in

C

Attach bracket to spring nuts in strut channel using bolts and washers (by others)

24 1/4 in

B

B

SIDE VIEW SSC-T5 Indoor LED Shot Clock Installation

SIDE VIEW

A

Last ECO Drawn KAB

6

5

Nevco, Inc. Greenville, Illinois 62246 Drawing No.

4

3

241-0452

Date 4/1/2016 2

Sheet

6

of

6 1

A