STORMWATER SCHEDULE NOTES: 1. ALL 10" PIPE TO BE ADS N-12 HDPE. 2. ALL LARGER PIPE TO BE RCP UNLESS OTHERWISE NOTED. 3. ALL PIPE OUTFALLS TO HAVE FLARED END SECTION.
POOL
CLUB HOUSE
BLDG. 1
BLDG. 2
BLDG. 3
Stonecrest Apartments Expansion
CV-3
Grading and Erosion Control Layout
PHASE II CONSTRUCTION SEQUENCE: A. PERFORM ROAD GRADING / PAD GRADING / STORM DRAINAGE INSTALLATION. B. INSTALL UTILITIES. C. INSTALL TEMPORARY / PERMANENT GRASSING. D. CONSTRUCT BUILDINGS E. INSTALL ASPHALT. F. PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE. G. MAINTAIN ALL SEDIMENT CONTROL MEASURES UNTIL ALL DISTURBED AREAS HAVE STABILIZED. H. AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, AND APPROVED BY CHEROKEE COUNTY, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND REMOVE ALL TEMPORARY SEDIMENT CONTROL DEVICES. CLEAN ANY ACCUMULATED SEDIMENT FROM POND. I. AS BUILT PLANS WILL BE REQUIRED BY ENGINEER.