GENERAL NOTES
SW BURLINGAME ROAD
SW MULVANE STREET
PROJECT HIGHLIGHTS: · PAVEMENT IN POOR CONDITION WILL BE REPLACED/REPAIRED · TRAFFIC SIGNAL WILL BE REPLACED · SOME SIDEWALK WILL BE REPLACED · PROJECT EXPECTED TO START APRIL 30, 2018 · PROJECT EXPECTED TO FINISH OCTOBER 2018
· · · ·
INTERSECTION WILL REMAIN OPEN THROUGHOUT CONSTRUCTION. ACCESS TO RESIDENCES AND BUSINESSES WILL REMAIN OPEN THROUGHOUT CONSTRUCTION. TEMPORARY TRAFFIC SIGNALS REQUIRED DURING ALL PHASES. NO LEFT TURNS AT THE INTERSECTION DURING CONSTRUCTION.
SW 29th STREET SW 29th STREET
Illustration depicts the proposed improvements of the SW 29th Street and SW Burlingame Road Intersection. The design details and right-of-way cannot be determined from this illustration. The City of Topeka and PEC make no warranties, guarantees, or representation for the accuracy of this information and assume no liability for errors or omissions. Temporary Access Routes and Construction Phasing boundaries are subject to change.
1263 SW Topeka Blvd Topeka, KS 66612 785-233-8300 www.pec1.com
Michael J. Stewart, P.E., Project Manager Professional Engineering Consultants, P.A. 1263 SW Topeka Blvd. Topeka, KS 66612 (785) 233-8300
[email protected] S.W. 29TH & S.W. BURLINGAME RD. INTERSECTION CITY OF TOPEKA PROJECT NO. T-841017.26
Robert Bidwell, P.E., Project Manager City of Topeka 620 SE Madison Street Topeka, KS 66607 (785) 368-3842
[email protected]