CREATING A SAFER ENVIRONMENT FOR BOTH PEDESTRIANS AND VEHICLES, ON 31 MAY 2016 CONSTRUCTION WILL BEGIN ON A GALWAY STREET UPGRADE TO REPLACE THE CURRENT ROAD LAYOUT WITH A NEW SHARED SPACE.
Temporary Road Layout Change:
• Closed for new construction of shared space. • Tuesday 31 May – Saturday 29 October 2016. • Contractor: JFC Ltd - Hawkins Construction Ltd. For more on the Galway Street Shared Space visit www.britomart.org
As part of these works, Galway Street will be temporarily reconfigured to a two-way street as illustrated above. After works are completed, the one-way system will be reinstated. Access to all Galway Street buildings and car parks will be maintained during this time.