The Future of Nuclear Power – The Discussion in Germany

Report 1 Downloads 67 Views
Forschungszentrum für Umweltpolitik

PD Dr. Lutz Mez Forschungszentrum für Umweltpolitik Freie Universität Berlin [email protected] www.fu-berlin.de/ffu

The Future of Nuclear Power – The Discussion in Germany Tokyo, November 22, 2010

Outline -  Nuclear power - a marginal energy source -  A nuclear renaissance? -  Problems of the nuclear industry -  Economics of nuclear power -  Lack of near-term prospects -  Combat climate change with nuclear power? -  Conclusions

Forschungszentrum für Umweltpolitik. Lutz Mez

2

Global Total Primary Energy Supply

Quelle: IEA 2008 Forschungszentrum für Umweltpolitik. Lutz Mez

3

Global Gross Electricity Generation

Quelle: IEA 2008 Forschungszentrum für Umweltpolitik. Lutz Mez

4

Global Total Final Energy Consumption

Quelle: IEA 2008 Forschungszentrum für Umweltpolitik. Lutz Mez

5

Forschungszentrum für Umweltpolitik. Lutz Mez

6

Forschungszentrum für Umweltpolitik. Lutz Mez

7

Role of Nuclear Electricity in Total Final Energy Consumption of the six largest producers (2006) F

JAP

D

USA

RUS

TPES in Mtoe

272.7

216.5

527.6

348.6

2,320.7

676.2

Electricity gener. in TWh

574.5

404.0

1,100.4

636.8

4,300.1

993.9

Nuclear el. gen. in TWh

450.2

148.7

303.4

167.3

816.2

156.4

78.4

36.8

27.6

26.3

19.0

15.7

174.0

145.1

351.8

253.6

1,527.2

431.7

Nuclear FE in Mtoe

26.6

11.8

23.3

11.9

60.8

9.2

Share of Nuclear electricity TFEC in %

15.3

8.1

6.6

4.7

4.0

2.1

Share in % TFEC in Mtoe [1

KOR

Forschungszentrum für Umweltpolitik. Lutz Mez

8

Global role of Nuclear Electricity of TFEC (2006)

1.  Share of Nuclear of Electricity generation: 14.8% 2.  Share of Electricity of Total Final Energy Consumption: 16.7% 3.  Share of Nuclear Electricity of TFEC: 2.47%

Forschungszentrum für Umweltpolitik. Lutz Mez

9

Forschungszentrum für Umweltpolitik. Lutz Mez

10

Forschungszentrum für Umweltpolitik. Lutz Mez

11

Forschungszentrum für Umweltpolitik. Lutz Mez

12

Forschungszentrum für Umweltpolitik. Lutz Mez

13

Global expansion of installed capacity -  150,000 MW new generation capacity was taken worldwide

into operation in 2007 - thereof NPPs: 1,857 MW (1.2%) -  In 2008 for the first time since 1956 NO new NPP was

taken into operation. -  In 2009 two NPPs – Tomari-3 in Japan and Rajasthan 5 -

were connected to the grid – and three NPPs shut down. -  In 2010 five NPPs were connected to the grid – and until

September one NPP shut down.

Forschungszentrum für Umweltpolitik. Lutz Mez

14

Problems of the nuclear industry -  Unsolved nuclear waste storage problem -  Industrial capacities -  Lack of skilled workforce -  Costs & Financing -  Proliferation -  Terror risks -  Flu epidemics

Forschungszentrum für Umweltpolitik. Lutz Mez

15

Forschungszentrum für Umweltpolitik. Lutz Mez

16

Forschungszentrum für Umweltpolitik. Lutz Mez

17

Arguments? Earlier: NPPs are very cheap (Too Cheap to Meter) Today: NPPs are cheaper as all alternatives How did the costs for NPPs develop in reality?

Forschungszentrum für Umweltpolitik. Lutz Mez

18

Development of NPP construction costs

Forschungszentrum für Umweltpolitik. Lutz Mez

19

Forschungszentrum für Umweltpolitik. Lutz Mez

20

NPP construction costs - estimates Up to 2002: nuclear industry predicted construction costs of $1000/kW for new type Generation III(+) 2004: Olkiluoto contract price $3000/kW (2000 €/kW) - real $4000-4500/ kW or more 2007-08: US estimates about $5000/kW 2009: Ontario tenders $6700/kW and $10000/kW Cost estimates before construction always an under-estimate

Forschungszentrum für Umweltpolitik. Lutz Mez

21

Factors for construction costs increase •  All generation technologies hit by China effect but nuclear much more

so than others. What other factors? •  More realistic estimates as companies have to deliver on their

promises •  Learning from Olkiluoto •  Depreciation of the dollar •  Will manufacturing bottlenecks and skill shortages make things even

worse? •  Which if any of these factors is reversible?

Forschungszentrum für Umweltpolitik. Lutz Mez

22

« US may have seen last new nuclear. coal plant » Asked about challenges facing construction of new nuclear and coal power plants. Wellinghoff allowed that "we may not need any. ever." That's a "theoretical question" because « I don't see anybody building these things until costs get to a reasonable level. » He characterized the projected costs of new nuclear plants as prohibitive. citing estimates of roughly $7.000/kW.

Jon Wellinghoff. Chairman of FERC (Federal Energy Regulatory Commission) April 2009 Source: Platts. 22 April 2009

Forschungszentrum für Umweltpolitik. Lutz Mez

23

Total GHG emissions of generation technologies

Forschungszentrum für Umweltpolitik. Lutz Mez

24

CO2 emissions from nuclear over time

Forschungszentrum für Umweltpolitik. Lutz Mez

25

Nuclear irrelevant to Climate Change Mitigation

“Nuclear power is unlikely to play a critical role in limiting CO2 equivalent concentrations in the atmosphere until mid-century at the earliest… No realistic plan foresees a reactor build rate that allows nuclear power to help stay below 550 ppme* CO2 within the next ~30-40 years.” Robert Rosner Director, Argonne National Laboratory April 2009 * The term ppme CO2 refers to parts per million equivalent CO2 concentration of greenhouse gases in the atmosphere.

Forschungszentrum für Umweltpolitik. Lutz Mez

26

Nuclear Phase-out in Germany -  Discourse on nuclear power & nuclear consensus -  Problems of nuclear waste management -  Final disposal of nuclear waste -  Agreements between government and nuclear industry -  Nuclear phase-out law -  Nuclear power and CDU-CSU-SPD government -  Actual discussion after the last federal elections -  German energy concept -  10-point Immediate Action Program

Forschungszentrum für Umweltpolitik. Lutz Mez

27

Nuclear Power Plants in Germany in operation and shut-down

Forschungszentrum für Umweltpolitik. Lutz Mez

28

Framework conditions for Nuclear phase-out in Germany -  There are 17 nuclear power plants operating in Germany

which provide about one quarter of total electricity generated -  19 NPPs are already shutdown and partly totally dismantled -  Technical operation time is between 20 and 40 years pending on the parts

concerned -  Since 2002 the world-wide capacities have been declining: operation times of

commercial nuclear plants already shutdown have been between 12 and 31 calendar years, and 21 years in average -  In contrast to the legal situation in most other countries, in Germany the

operation licenses were unlimited -  There has been a recall of unlimited licenses for coal fired plants in the 1980s -

this was approved by the Constitutional Court

Forschungszentrum für Umweltpolitik. Lutz Mez

29

Phasing-Out Nuclear Power in Germany - Policy targets

-  The coalition of the Green party and Social Democrats agreed to design a path for the

definite phase-out of nuclear power

-  The phase-out should not give rise to any financial compensation of industry -  Negotiations between industry and the government should be finished within one year -  If negotiations fail, a law will be enacted to limit the remaining time of operation -  Different measures will be taken to promote energy efficiency and renewable energy

production

Forschungszentrum für Umweltpolitik. Lutz Mez

30

Phasing-out nuclear power in Germany - Evaluation -  Agreement reached in 2000, signed 2001 -  Atomic Energy Act amendment January 2002 -  Ending the promotion of nuclear energy -  Introduction of obligatory safety reviews -  Abandonment of reprocessing and restriction of waste management to direct

final storage

-  Raising the level of insurance cover for nuclear accident liability from € 255.7

million to € 2.56 billion

Forschungszentrum für Umweltpolitik. Lutz Mez

31

Electricity Production Rights of German NPPs

Forschungszentrum für Umweltpolitik. Lutz Mez

32

Nuclear safety…

Forschungszentrum für Umweltpolitik. Lutz Mez

33

Nuclear Power discussion today…

Forschungszentrum für Umweltpolitik. Lutz Mez

34

Asse Research Mine

Forschungszentrum für Umweltpolitik. Lutz Mez

35

126.000 barrels of nuclear waste

Forschungszentrum für Umweltpolitik. Lutz Mez

36

Storage of radioactive waste in Asse

Forschungszentrum für Umweltpolitik. Lutz Mez

37

Asse Research Mine

Forschungszentrum für Umweltpolitik. Lutz Mez

38

Problems of final nuclear waste disposal -  Shutdown

of German NPPs according Atomic Act until appr. 2023

-  Intermediate storage -  Start of final storage about 2030 -  Completion of final storage activities –> 2100 -  Period for secure depositing of nuclear waste

Forschungszentrum für Umweltpolitik. Lutz Mez

39

Nuclear demolition and waste disposal costs AKW & install.Leistung in MW

Abriss- & Entsorgungskosten Mio. €

A- & E-Kosten spezifisch €/kW

AKW Stade 672 MW

500

744

AKW Niederaichbach 106 MW

135

1.274

THTR Hamm-Uentrop 308 MW

1.700

5.519

AKW Lubmin 6 x 440 MW

3.200

1.212

350

5.000

AKW Rheinsberg 70 MW

Forschungszentrum für Umweltpolitik. Lutz Mez

40

German Energy Concept -  Renewable energies as a cornerstone of future energy supply -  Energy efficiency as the key factor -  Nuclear power and fossil-fuel power plants -  An efficient grid infrastructure for electricity and integration of

renewables -  Energy upgrades for buildings and energy-efficient newbuild -  The mobility challenge -  Energy research towards innovation and new technologies -  Energy supply in the European and international context -  Acceptance and transparency

Forschungszentrum für Umweltpolitik. Lutz Mez

41

Conclusions •  Nuclear power plays a modest role in present global energy supply – and will

not be much larger in the future

•  The international relevance of nuclear power is rather decreasing – no sign for

a nuclear renaissance at all

•  Evidence from Finland, USA & France does not show that new nuclear can be

built without special arrangements to protect them from the market

•  The alarming rise in construction cost estimates, emerging skills shortages and

production bottlenecks are problems that will not be quick or cheap to overcome

•  Costs for decommissioning and recovery and cleaning up of NPPs are often

higher than the construction costs

•  The financial crisis amplifies all these problems for the nuclear industry •  The nuclear industry must convince S&P or Moodys, not the public •  NPPs cannot combat climate change – and their GHG emissions are rising

Forschungszentrum für Umweltpolitik. Lutz Mez

42

Thank you for your attention! PD Dr. Lutz Mez FFU. Ihnestr. 22. D-14195 Berlin Email: [email protected]

Forschungszentrum für Umweltpolitik. Lutz Mez

43