ThermaSkirt - Instructables

Report 0 Downloads 282 Views
TM

I N S TA L L AT I O N

Page 1

ISSUE 22 / January 2014 (Download further/latest copies at www.discreteheat.co.uk/technical.html)

A N

E CO

ThermaSkirt®

R E VOLUTION

IN

ROOM

H E AT I N G

These instructions are intended as a guide only. Your installation & design may vary - if in doubt ask for help. DiscreteHeat Co. Ltd. accept no liability for any errors or omissions. If you have any tips or suggestions e-mail them to: [email protected] Your ThermaSkirt system must be cleansed and protected by a corrosion inhibitor suitable for alluminium radiators, as required by BS 7593:2006 ‘Code of Practice for treatment of water in domestic hot central heating systems’. DiscreteHeat recommends our own TS3 Cleanser and TS5 Inhibitor or Scalemaster CM5 or CM10. FAILURE TO PROTECT YOUR SYSTEM WILL INVALIDATE YOUR WARRANTY TOOLS YOU WILL NEED: A suitable metal cutting saw, preferably a chop saw (only if cutting lengths on site) / A DiscreteHeat rotary de-burring tool / An accurate quality tape measure (Black & Decker, DeWalt etc.) / String line and chalk or laser level / A Stanley/sharp knife and/or plasterboard saw / Power drill with hammer action / Power driver / Size 10 screws (50-100mm) / Plastic or timber faced mallet / Rawlplugs and\or plasterboard fixings / Pipe cutting tool (15mm/16mm) / Various push fit connectors / Your plan and cutting list (if purchased as a room kit). THE SAME DIMENSIONS AND SPACINGS APPLY TO ANTI-CLOCKWISE INSTALLATIONS. ALL EXAMPLES SHOWN ARE CLOCKWISE/RH INSTALLATIONS.

DO’S AND DON’TS: DO DO DO DON’T DON’T DON’T

1.

Carefully check you have all the parts required by your design systems before you start cutting. Check all skirting measurements twice before cutting: see diagram on page 2 (unless provided pre-cut). Ensure that you use the templates (pages 9 - 12) to get your pipes correctly positioned. Forget to check the orientation and quantity of retaining clips for each connection and fitting before you insert into skirting - it varies! Forget that the FEED and RETURN pipes need to be tight to the wall to ensure your covers fit correctly. Forget that aluminium expands (by about 1mm per metre), so make sure the ends of the skirting are not hard up against any fixed features.

POSITION FEED PIPES Remember to allow for carpet or tiles if NOT Finished Floor Level URBAN LT (6in / 150mm)

REGENCY OG (8in / 200mm) CLASSIC TS (6in / 150mm)

DECO PR/BM (4.5in / 115mm)

FLOW 15/16mm FLOW 15/16mm 100mm

45mm

RETURN 15/16mm

FLOW 15/16mm 100mm

45mm

FLOW 15/16mm

130mm RETURN 15/16mm

RETURN 15/16mm

90mm

75mm 35mm

RETURN 15/16mm

FINISHED FLOOR LEVEL

Tel: 0845 1238367

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

I N S TA L L AT I O N

Page 2

1. P OSI TI ON F E E D P I P E S ( c on ti nued ) PIPE CONNECTORS NEED TO BE SET INTO THE WALL

12 9

3

SINGLE TRV

6

CLOCKWISE SHOWN

BI-DIRECTIONAL TRV Relieve plasterwork 150mm x 100mm to a depth of 5mm

Relieve plasterwork 100mm x 100mm to a depth of 5mm (See template p.9)

150mm

120mm

120mm

65mm

Feed 15mm (16mm to order)

35mm Feed and Return pipes tight to wall Relieve plaster for fittings.

Return 15mm (16mm to order) DOUBLE TRV INSTALLATION TEMPLATE (Sheet 1 of 2) Through floor pipework (Left and right feed) DO NOT SCALE DRG WHEN PRINTING 65mm 0 20 40 mm 130mm

See pages 9-12 for pipe templates

130mm 65mm

100mm

120mm 60mm 95mm 75mm

45mm

90mm

FOR ALL TEMPLATES VISIT www.discreteheat.co.uk/technical.html

2. C UTTI N G S K I RT I N G TO L E NGTH ( w hen not s uppl i ed pre- cut )

TRV

RF

40mm

120mm

L1

50mm

L9

Archway, patio, door obstruction, etc.

= (L2 -60mm)

= (L9 -150mm)

= (L3 -20mm)

100mm

(Threshold Kit)

CLOCKWISE SYSTEM SHOWN

24 TPI minimum

40mm

L3 20mm

= (L4 -5mm)

See page 6

= (L8 -120mm) = (L7 -60mm)

20mm 40mm

Tel: 0845 1238367

L2

L4 20mm

L5

100mm

L8

20mm

= (L1 -160mm)

L7

20mm

= (L5 -20mm) = (L6 -60mm)

L6 40mm

20mm

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

2.

I N S TA L L AT I O N

Page 3

C UTTI N G S K I RT I N G TO LENGTH ( w hen not s uppl i ed pre- cut )

COMMON CUTTING ALLOWANCES (note number and configuration of clips)

40mm

20mm

120mm (5")

0~3mm (0.0")

50mm (2")

100mm (4")

1x clip at back

1x clip at back

2x clips at front

1x clip at front (or back)

1x clip at front

TRV Feed/return

Internal corner

External corner

Return manifold

Non TRV feed & return / threshold kit

Avoid chafeing on the corner

Offer the flexible coupling up centrally to the internal corner and mark the wall at this point to give the cut length of skirting

=

=

= =

Offer flexible coupling up centrally to the external corner and mark the wall at this point to give the cut length of skirting

Push into corner

2x clips at front

2x clips at front

Odd angle - internal IMPORTANT:

Odd angle - external

20mm (0.8")

1x clip at front, 1x clip behind In-line joint (> 6m walls)

115mm (min)

1x clip at front Door architrave kit

All cut ends MUST be deburred to preserve your warranty. Remove all chaff and debris to preserve your warranty. Problems may occur if not properly removed.

IMPORTANT - ALL CUT ENDS MUST BE DEBURRED AS SHOWN BELOW

Minimum active length = 55mm (2.16")

Deburring tool (Part No. STOOL) ‘Bell Mouth’ deburr

!

DEBURR! Keep parallel

Tel: 0845 1238367

Remove all chaff and debris

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

3.

I N S TA L L AT I O N

Page 4

M O U N T I N G B R A C K E T S - LT, T S & B M A N D O G P R O F I L E O N LY

LT, TS & OG ONLY

Push in

90°

?

Make sure you allow for uneven/unlevel floors. Bottom cover should be trimmed first. Click down

MARK TOP OF SKIRTING WITHOUT CAULKING STRIP

Mounting bracket OR 7mm Ø

SHOULD YOU NEED TO MOVE THE SKIRTING, PEEL AWAY FROM BRACKETS AS SHOWN. DO NOT TILT UP OR DOWN!

USE THIS MARK TO POSITION MOUNTING BRACKET USING AN OFF-CUT OF SKIRTING THEN DRILL OR MARK WITH PENCIL

100mm from end of skirting 600mm - 700mm

Insulating foil, if required (Part No. INSRL LT, INSRL TS or INSRL OG) (older, solid walls without cavity)

±5mm

700mm approx.

Tel: 0845 1238367

Gently push each piece back to the wall and assess wall straightness, if there any gaps greater than 10mm to the back edge of the skirting, then apply moderate pressure and see if the gap is reduced, if it isn't, then it is advisable to locally bend the skirting as shown above. LEAVE PROTECTIVE TAPE ON DURING THE PROCESS!

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

I N S TA L L AT I O N

Page 5

3. M OU N TI N G - D E C O P R WALL MOUNTED

Insulation foil (recommended) - improves insulation and prevents noise

7mm Ø 60 - 1000mm apart

Cut-away black plastic guide to allow the other centreclip covers to fit in the slot

FLOOR MOUNTED

ALL OTHER INFORMATION FOR SPACING, BENDING, ETC. IS AS OTHER PROFILES

4. INSTA L L AT I O N S E Q U E N C E

3 SE

Return

View on back of TRV showing fixings

Feed

EA GR

GR

EA

CONTINUE ROUND THE ROOM REFERRING TO CORRECT CLIP SEQUENCE ON PAGE 3.

SE

ENSURE PIPES ARE VERTICAL AND SQUARE TO THE SKIRTING!

DO NOT OVERTIGHTEN!

SE

CLOCKWISE INSTALLATION SHOWN

!

‘O’ RINGS MUST BE GREASED!

EA

6

START WITH TRV AT FEED AND RETURN PIPE END

GR

9

12

‘O’ RINGS MUST BE GREASED!

GR

EA

SE

‘O’ RINGS MUST BE GREASED!

Internal Corner 40mm

External Corner GREASE SUPPLIED MUST BE USED ON ALL CONNECTORS TO AVOID DAMAGE ON ASSEMBLY AND PRESERVE YOUR WARRANTY

Tel: 0845 1238367

20mm Check corners not rubbing

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

I N S TA L L AT I O N

Page 6

4. INSTA L L AT I O N S E Q U E N C E ( cont i nued )

!

!

20mm ‘CLICK!’

40mm

ENSURE BOTH SIDES ARE LEVEL WITH EACH OTHER

‘CLICK, CLICK, CLICK!’

PUSH

FITTING FINAL SECTION

In this case only, reverse the connector and clip to retain the final section

CHECK THAT THE FINAL PIECE CANNOT COME OFF UNDER PRESSURE If a return manifold follows an internal corner, double clips must be used.

5. C ORN E RS A N D C OV E R S

!

TOP TIP: Soak top gasket in warm soapy water for easy fitting

1

Mitre top gaskets before fitting corner cover

2

ENSURE BOTH SIDES ARE LEVEL WITH EACH OTHER

5mm

See separate instructions provided with Regency OG & Deco PR

Tel: 0845 1238367

Add a touch of super glue onto mitre before fitting the corner cover

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

I N S TA L L AT I O N

Page 7

5. C ORN E RS A N D C OV E R S ( c ont i nued ) Clip return manifold cover top and bottom

NEW SLIM INTERNAL AND EXTERNAL CORNERS ARE NOW AVAILABLE FOR THE URBAN LT

2

1 See separate instructions supplied

RETURN MANIFOLD COVER FIXING (LT & TS)

Peel off Super Velcro backing

Position holes in knob as shown to access 2 fixing screws for TRV controls

2

1

Pz x 2

Check back of cover is clean and free from grease

Clip TRV Cover Top and Bottom Note: TRV cover is completely secured by the Valve facia

Pz1

TRV COVER FIXING (LT & TS)

6. F I N A L C H E C K S

ON

Use correct size screwdriver 1/4” (6.5mm) to avoid damage

1 ~ 2 bar

Clockwise Installation

2 1

OFF

OFF

AIR

Anti-clockwise Installation

ON OFF

OFF

TRV Unit

Return Manifold

Use correct size screwdriver 1/4” (6.5mm) to avoid damage

A pressure test of the system before connecting to the central heating system is recommended. (See part no. TTEST)

7. TE CHN I C A L S P E C I F I C AT I O N Material

Output (per M @ dT50°C)

Feed & Return

Weight

Capacity

Corrosion

Min. Flow

Surface

Complies

Recommended

BTU / W

Pipe

Kg per m

Litres per m

Resistance

Rate

Finish

with

Max. Operating Temp.

0.5 l/m

≤75°C

Unique Polymer &

TS/LT > 500BTU / 150W

15mm

1.4kg LT

Excellent

10 c.c. per sec

Epoxy Powder

BS-EN

Aluminium Alloy

OG > 700BTU / 210W

16mm to order

1.7kg OG

See Section 8

0.6 litre/min

to BS-EN 12206-1

442

1.2kg PR

‘Running your system’

PR > 450BTU / 135W

Tel: 0845 1238367

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

TM

I N S TA L L AT I O N

Page 8

8. RUN N I N G YO U R S YS T E M Run the system at fully open, maximum temperature for 1 hour, to expel any air in the system. Release any air that may be trapped at appropriate radiator bleed points and return manifold bleed point. Turn off TRV/flow manifold and allow to cool. Set to desired room setting and run normally. NOTE: DiscreteHeat recommend flushing the system with ThermaSkirt Cleanser TS3 or alternatively Scalemaster SM3 (check dosage carefully) and running with ThermaSkirt corrosion inhibitor TS5 or alternatively Scalemaster SM5 or SM10 (check dosage carefully) to ensure maximum longevity and reliability. Hard water areas may require additional precautions. Chemically softened water must NOT be used. This is a standard precaution for ALL wet heating systems and a requirement of BS 7593:2006. Contact DiscreteHeat for specific application advice. Failure to provide a suitable corrosion inhibitor will invalidate your warranty!

9. TROUBL E S H O OT I N G PROBLEM Leak at joint. Leak on ThemeSkirt pipes. ThermaSkirt not hot.

Water from return manifold Noise - ticks & clicks when heat on Sudden ‘bangs’

CAUSE Faulty / incorrect installation. No inhibitor fitted. Corrosion chemical/cleaner left in system Check boiler. Lockshield valve closed. TRV valve closed / off. Air trapped in pipework. Manifold not closed fully. Connectors & fittings rubbing on wall. ThermaSkirt length(s) cut too long, expanding and jumping off the bracket. Internal corners clipped both sides.

SOLUTION Drain and replace fitting or ‘O” ring from spares kit. Drain down, cleanse with TS3 and install inhibitor TS5. Drain down, replace piece, cleanse with TS3 and refill. Is heating ’ON’ and pressure OK? Open Lockshield valve ( ). Open TRV valve ( ). See 10 below. Turn to ‘OFF’ position. Relieve plasterwork at Feed & Return and/or corner fittings. Check lengths & refit if necessary. Check & remove/unclip unecessary clip.

10. BL E E D I NG YO U R S YS T E M ®

As ThermaSkirt® acts like a pipe, in normal operation air does not get trapped. However, on existing systems, to which ThermaSkirt is added, air may get trapped in the existing pipework to and from the skirting. Follow these simple steps if you discover cold sections of the ThermaSkirt ® which do not heat up. CLOSE

1. System with ThermaSkirt® & Conventional Radiators. Turn off all radiators and ThermaSkirt thermostatic and lockshield valves. Make sure your system is fully pressurised and the pump is set to max. Run the system for a few minutes, and, starting from the lowest point in the house, open each radiator/ThermaSkirt system, one at a time. Run for a further 2 minutes (approx) , close again and move to the next ThermaSkirt or radiator, moving upwards in the house. Any air will be expelled through the boiler or trapped in a conventional radiator. Bleed the radiator as normal. 2. New Installation with ThermaSkirt® Only. On installation, in a convenient place at the highest point of the system, ‘T’ off into a vertical leg 600mm high and install an automatic/manual air vent. Following the procedure above, close and open each ThermaSkirt® system in turn. Any air forced round the system will be expelled through the boiler or through the air vent. Air can also be bled from the bleed screw on top of the return manifold (A).

CLOSE

TRV Unit Trapped air expelled through boiler

Auto vent recommended to ease bleeding

AV

600mm (min)

Trapped air expelled through boiler

Tel: 0845 1238367

A

Fax: 01942 665104 e-mail: [email protected] web: www.discreteheat.co.uk

Cut/fold along here (Place on end of wall or doorway architrave)

6

12

3

35mm

95mm

75mm

65mm

Relieve plaster/ surface finish to a depth of 5mm in this hatched area to allow for Tectite fittings

Fax: 01942 892836

e-mail: [email protected] web: www.discreteheat.co.uk

Tel: 0845 1238367

100mm (LT)

130mm (OG)

45mm

100mm

RETURN (LOCKSHIELD VALVE)

Relieve plaster/surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting

Relieve plaster/ surface finish to a depth of 5mm in this shaded area to allow for Tectite fittings

FEED (TRV VALVE)

95mm

60mm

130mm

WALL FLOOR

WALL FLOOR Drill 2 x 18mm holes (See sheet 2 for location)

Cut/fold along here for Regency OG template

120mm

FEED (TRV VALVE)

90mm

RETURN (LOCKSHIELD VALVE)

Cut/fold along here for Urban LT template

65mm

STICK TO WALL TO USE

75mm

130mm

DOUBLE TRV INSTALLATION TEMPLATE (Sheet 1 of 2) Through floor pipework (Left and right feed) DO NOT SCALE DRG WHEN PRINTING 65mm 0 20 40 mm

35mm

35mm

20mm

RH END anti-clockwise installation

65mm

3

Drill 2 x 18mm holes touching wall surface WALL FINISHED FLOOR LEVEL Plan view for drilling feed and return pipe holes in floor

Fold along here for Regency OG template

Drill 2 x 18mm holes touching wall surface

6

90mm (PR)

9

DO NOT SCALE DWG WHEN PRINTING 0 20 40 mm 12

SINGLE TRV INSTALLATION TEMPLATE) (Through floor pipework)

FEED (TRV VALVE)

Cut along dotted line

RETURN (LOCKSHIELD VALVE) 35mm 75mm (PR) (OG) 45mm (LT) Fold along here for Deco PR template WALL FINISHED FLOOR LEVEL Fold along here for Urban LT / Classic TS template WALL FINISHED FLOOR LEVEL

100mm

120mm

LH END clockwise installation

LH END

9

Cut/fold along here (Place on end of wall or doorway architrave)

LH and RH installation

100mm

FEED (TRV VALVE) Relieve plaster/ surface finish to a depth of 5mm in this shaded area to allow for Tectite fittings

Relieve plaster/surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting

60mm

130mm

95mm

65mm

Cut/fold along here for Urban LT template

Drill 2 x 18mm holes (See sheet 2 for location)

WALL FLOOR

WALL FLOOR

120mm

FEED (TRV VALVE)

90mm

RETURN (LOCKSHIELD VALVE)

Cut/fold along here for Regency OG template

Tel: 0845 1238367

Fax: 01942 892836

32mm

80mm

RH END

e-mail: [email protected] web: www.discreteheat.co.uk

80mm

100mm

50mm

NON TRV / THRESHOLD KIT PIPE INSTALLATION TEMPLATE (Through floor pipework) DO NOT SCALE DWG WHEN PRINTING 0 20 40 100mm mm 50mm Relieve plaster/surface finish to a depth of 5mm in this hatched area to allow for Tectite fittings

75mm

130mm

DOUBLE TRV INSTALLATION TEMPLATE (Sheet 1 of 2) Through floor pipework (Left and right feed) DO NOT SCALE DRG WHEN PRINTING 65mm 0 20 40 mm

WALL FINISHED FLOOR LEVEL WALL FINISHED FLOOR LEVEL

45mm (LT) 35mm (PR)

100mm (LT) 90mm (PR)

75mm (OG)

130mm (OG)

Fold along here for Deco PR template Fold along here for Urban LT / Classic TS template

45mm RETURN (LOCKSHIELD VALVE)

Drill 2 x 18mm holes touching wall surface

STICK TO WALL TO USE

WALL Fold along here for Regency OG template FINISHED FLOOR LEVEL Drill 2 x 18mm holes Plan view for drilling feed and return touching wall surface pipe holes in floor

100mm

80mm

100mm

80mm

32mm

Cut/fold along here (Place on end of wall or doorway)

LH END

Cut/fold along here (Place on end of wall or doorway)

45mm

100mm

RETURN (LOCKSHIELD VALVE)

Relieve plaster/surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting

Relieve plaster/ rface finish to a pth of 5mm in is shaded area to allow for Tectite fittings

FEED (TRV VALVE)

95mm

WALL FLOOR

Drill 2 x 18mm holes (See sheet 2 for location)

WALL FLOOR

120mm

FEED (TRV VALVE)

90mm

RETURN (LOCKSHIELD VALVE)

Cut/fold along here for Regency OG template

65mm

Cut/fold along here for Urban LT template

60mm

130mm

STICK TO WALL TO USE

75mm

130mm

DOUBLE TRV INSTALLATION TEMPLATE (Sheet 1 of 2) Through floor pipework (Left and right feed) DO NOT SCALE DRG WHEN PRINTING 65mm 0 20 40 mm

35mm (PR)

Drill 2 x 18mm holes touching wall surface

WALL FINISHED FLOOR LEVEL WALL FINISHED FLOOR LEVEL

DO NOT SCALE DRG WHEN PRINTING 0 20 40 mm

45mm (LT)

75mm (OG)

Relieve plaster/ surface finish to a depth of 5mm in this hatched area to allow for Tectite fittings

65mm

Feed

40mm

95mm

100mm

BI-DIRECTIONAL TRV INSTALLATION TEMPLATE (LH feed direction) (Through floor pipework) 150mm

Return

Fax: 01942 892836

90mm (PR)

100mm (LT)

130mm (OG)

e-mail: [email protected] web: www.discreteheat.co.uk

Tel: 0845 1238367

WALL FINISHED FLOOR LEVEL Plan view for drilling feed and return pipe holes in floor

Fit separate isolation valve

Fold along here for Deco PR Fold along here for Urban LT

45mm

Cut along dotted line

100mm

45mm

FEED (TRV VALVE)

Relieve plaster/surface finish to a depth of 25mm in this dark shaded area to allow feed pipe to go behind Tectite fitting

Relieve plaster/ rface finish to a pth of 5mm in is shaded area to allow for Tectite fittings

RETURN (LOCKSHIELD VALVE)

95mm

Drill 2 x 18mm holes (See sheet 2 for location)

90mm

RETURN (LOCKSHIELD VALVE)

WALL FLOOR

WALL FLOOR

120mm

FEED (TRV VALVE)

45mm

Return

Fold along here for Deco PR Fold along here for Urban LT

DO NOT SCALE DRG WHEN PRINTING 0 20 40 mm

Fit separate isolation valve

90mm (PR)

100mm (LT)

130mm (OG)

65mm

Cut/fold along here for Urban LT template

Cut/fold along here for Regency OG template

60mm

130mm

95mm

150mm

100mm

40mm

Feed

BI-DIRECTIONAL TRV INSTALLATION TEMPLATE (RH feed direction) (Through floor pipework)

130mm

DOUBLE TRV INSTALLATION TEMPLATE (Sheet 1 of 2) Through floor pipework (Left and right feed) DO NOT SCALE DRG WHEN PRINTING 65mm 0 20 40 mm

75mm

STICK TO WALL TO USE

65mm

WALL FINISHED FLOOR LEVEL WALL FINISHED FLOOR LEVEL

Drill 2 x 18mm holes touching wall surface

Tel: 0845 1238367

Fax: 01942 892836

e-mail: [email protected] web: www.discreteheat.co.uk

35mm (PR)

Relieve plaster/ surface finish to a depth of 5mm in this hatched area to allow for Tectite fittings

75mm (OG)

45mm (LT)

WALL FINISHED FLOOR LEVEL Plan view for drilling feed and return pipe holes in floor