Trak Instructions

Report 0 Downloads 39 Views
Trak Instructions

by

MOUNT TO CEILING, BEAMS, JOISTS, PARTITIONS, ETC. (FASTENERS BY INSTALLER)

ROLLER GLIDE

Use alignment steel pins in the upper portion of the extrusion. Both ends of the extrusion need to be supported when installing. 1. LOCATE, POSITION AND INSTALL FIRST SECTION OF TRAK. 2. INSERT ALIGNMENT PINS AND POSITION / INSTALL NEXT SECTION OF TRAK.

Attach wedgeto end cap with supplied screw. Slip in place and tighten.

3. IF TRAKS RUN FROM WALL TO WALL THE LAST TRAK WILL NEED TO BE CUT 4” SHORT OF TOTAL LENGTH TO ALLOW LAST TRAK TO BE ALIGNED ON PINS. 4. IF WALL TO WALL SLIDE SCREENS ONTO TRAK PRIOR TO LAST SECTION BEING INSTALLED.

CEILING MOUNT FASTENER (not included)

THREADED ROD MOUNT

WALL MOUNT HANGING BRACKET

THREADED ROD (not included)

CEILING MOUNTING PLATE (not included)

COUPLER NUT (not included)

10’ TRAK (SECTION)

MACHINE SCREW

SPACER

(not included)

BOLT

PRE-MOUNTED ROLLER GLIDE HANGING BLOCK SCREEN

FASTENER

ICF CABLE HANGING TERMINAL FASTENER

COPYRIGHT 2017 ALL RIGHTS RESERVED ICF IDEAS - UNIKA VAEV