TUVALU - NZAID PROJECTS IPWEA WELLINGTON - TARANAKI BRANCH MEETING

20 FEBRUARY 2015

Simple civil engineering task

How to fill some holes, and how much will it cost?

TUVALU – 1000 KM NORTH OF FIJI

FUNAFUTI ATOLL

FUNAFUTI IN OCTOBER 1943.

Image sourced from Strategic Atolls by Peter McQuarrie. The original is a Marine Corps Photo, National Archives, Washington

FUNAFUTI TODAY

10 BORROW PITS

BORROW PITS

PIG PENS

BORROW PITS

CRAMPED LIVING CONDITIONS

BORROW PIT USED FOR LANDFILL

LANDFILL

WHY FILL THEM? • • • • • • •

Increased land area, access and versatility Environmental Improvement Improved Sanitation & Public Health Climate resilience Water & Food Security Other Development Opportunities Making things right

CHALLENGES • Detailed survey of BPs including houses & pigpens • Environmental and Social Impact Assessments • Assessing impacts of tides and sea-level rise •

• • • • • • • •

3.29 + 0.35 = 3.64m above sea-level at turn of century

Using ECI contract during design Bathymetry & jet-probing to confirm sand depths Sonar scanning to find UXO Specialist UXO risk analysis Repairs to houses Consultation with landowners and Government Safe implementation during filling process Remote location

COMPLETED REPORTS

WHAT HAPPENS TO PIGS?

LINING OF PITS

SAND LOCATION & VOLUMES

DEAD CORALS & EUTROPHICATION AREA

DREDGING & FILLING

CUTTER SUCTION DREDGE

DREDGING & FILLING

DREDGE LOCATIONS

SEA-LEVEL

FINISHED LEVELS

HOUSES & FOUNDATIONS

SAND SAMPLING

SAND SAMPLES Robert Smith, SPC & Sid Wade, Calibre

MAGNETIC SIGNALS

SUNKEN BARGE

UXO INVESTIGATION

UXO PRECAUTIONS

TYPICAL DESIGN - BP7

BP7 - DESIGN DETAIL (1)

BP7 - DESIGN DETAIL (2)

BP4 TEALAPAE

BP6 TEONE NORTH

BP7 TCS & TEONE

BP10 FAKAIFOU

FEEDBACK FROM LANDOWNERS

QUALITY CONSTRUCTION

QUALITY CONSTRUCTION

SITE MEETINGS CAN BE FUN

HIGH TIDES ARE SERIOUS

VARIABLE INTERNET CONNECTIONS

FUNAFUTI CBD

FISHERIES BUILDING

FISHERIES BUILDING • Part of 5 year fisheries strengthening • Build one new building to co-locate whole department • Design includes • • • • • •

Solar power Roof water supply Pumped sea outfall for sewage Accessibility Cyclone resistance Durability and low maintenance

SITE LOCATION

Site for building

SITE INSPECTION

THANK YOU [email protected]