TWO COMMERCIAL ATMOSPHERIC VENT WITH STORAGE TANK & RETURN CIRCULATION SHUT OFF VALVE UNION
HOT WATER
UNION T&P RELIEF VALVE
SHUT OFF VALVE UNION SHUT OFF VALVE
FLUE DAMPER (2)
DISCHARGE TUBE
DRAIN OUTLET
T&P RELIEF VALVE
SHUT OFF VALVE
CONTROL BOX (2)
DISCHARGE TUBE (2) GAS VALVE
FLOOR DRAIN
BACK-FLOW PREVENTER
CIRCULATOR
DRAIN OUTLET (2)
THIS DRAWING SHOWS A SUGGESTED PIPING CONFIGURATION AND OTHER DEVICES; CHECK WITH LOCAL CODES AND ORDINANCES FOR ADDITIONAL REQUIREMENTS. *EXPANSION TANK RECOMMENDED TO MINIMIZE ANY PRESSURE BUILD UP IF THE WATER SUPPLY PIPING HAS A BACK-FLOW PREVENTER, CHECK VALVE OR WATER METER WITH A CHECK VALVE.