Uniondale Public Schools AWS

Report 5 Downloads 151 Views
Uniondale Public Schools Building our Capacity. Preserving our Schools. Maintaining our Excellence. UNIONDALE UNION FREE SCHOOL DISTRICT

1

March 2018 Building Bond Planning

REVISED BUILDING BOND OBJECTIVES Address increasing enrollment Enrollment has increased over 900 students in the past 5 years and is projected to increase by more than another 700 over the next decade  Address building infrastructure and systems needs (repairs and renovations) UNIONDALE UNION FREE SCHOOL DISTRICT

2

March 2018 Building Bond Planning

REVISED BUILDING BOND OBJECTIVES  Address instructional-driven needs (ie: small class size, updated science labs)  Address athletic playing fields needs AND ALSO…

UNIONDALE UNION FREE SCHOOL DISTRICT

3

March 2018 Building Bond Planning

REVISED BUILDING BOND OBJECTIVES  LOWER OVERALL BOND COSTS  LOWER COST TO INDIVIDUAL TAXPAYER

UNIONDALE UNION FREE SCHOOL DISTRICT

4

March 2018 Building Bond Planning

WHY IS THIS STILL A GOOD TIME FOR A BUILDING BOND?  Interest rates are at HISTORIC LOWS  The District’s state aid rate for capital expenditures is at an HISTORIC HIGH (67.4%)

UNIONDALE UNION FREE SCHOOL DISTRICT

5

March 2018 Building Bond Planning

WHAT ARE WE CONSIDERING CHANGING IN A REVISED PLAN?  Reducing the number of new classrooms District-wide by 19  Limiting air conditioning to new construction and common spaces such as general purpose rooms, cafeterias and libraries UNIONDALE UNION FREE SCHOOL DISTRICT

6

March 2018 Building Bond Planning

WHAT ARE WE CONSIDERING CHANGING IN A REVISED PLAN?  Limiting installation of new synthetic turf fields to the high school  Reducing the number of proposed auxiliary gyms

UNIONDALE UNION FREE SCHOOL DISTRICT

7

March 2018 Building Bond Planning

HOW MUCH WILL THESE CHANGES SAVE?

$41,795,717 UNIONDALE UNION FREE SCHOOL DISTRICT

8

March 2018 Building Bond Planning

WHAT WOULD BE UNIONDALE RESIDENTS’ PORTION OF THE NEW PLAN BEING CONSIDERED?

$26,383,538 UNIONDALE UNION FREE SCHOOL DISTRICT

9

March 2018 Building Bond Planning

WHAT PERCENTAGE OF THE NEW PLAN WOULD BE UNIONDALE RESIDENTS’ PORTION?

$26,383,538 =16.7% RESIDENTS WOULD PAY LESS THAN 17 CENTS OF EVERY DOLLAR IN THE NEW BUILDING BOND PLAN UNIONDALE UNION FREE SCHOOL DISTRICT

10

March 2018 Building Bond Planning

HOW MUCH OF THE NEW BUILDING BOND PLAN WILL BE FUNDED BY THE STATE?

$89,970,378 of a total proposed bond of $158,134,456 UNIONDALE UNION FREE SCHOOL DISTRICT

11

March 2018 Building Bond Planning

HOW MUCH OF THE NEW BUILDING BOND PLAN WILL BE PAID FOR BY COMMERCIAL PROPERTIES IN THE DISTRICT?

$ 37,966,555 UNIONDALE UNION FREE SCHOOL DISTRICT

12

March 2018 Building Bond Planning

WHAT PERCENTAGE OF THE NEW PLAN WOULD BE PAID FOR BY THE COMMERCIAL PROPERTIES IN THE DISTRICT?

$ 37,966,555 = 24% UNIONDALE UNION FREE SCHOOL DISTRICT

13

March 2018 Building Bond Planning

PROPOSED BUILDING BOND FUNDING Funding Source Residential Sector Funding from the State Commercial Sector Smart School Grant

TOTAL UNIONDALE UNION FREE SCHOOL DISTRICT

Dollar Amount $ 26,383,538 $ 89,970,378 $ 37,966,555 $ 3,813,985 -----------------$158,134,456

Percent 16.7% 56.9% 24.0% 2.4% --------100% 14

March 2018 Building Bond Planning

HOW MUCH WILL THE REVISED BUILDNG BOND COST THE AVERAGE UNIONDALE HOMEOWNER? $ 19.81 per month for a home assessed at $300,000 $23.11 per month for a home assessed at $350,000 Residential portion is LESS than $1 DOLLAR per day for the average Uniondale homeowner UNIONDALE UNION FREE SCHOOL DISTRICT

15

March 2018 Building Bond Planning

UNIONDALE UNION FREE SCHOOL DISTRICT

16

March 2018 Building Bond Planning

Thank you, Uniondale. IT’S UP TO YOU! UNIONDALE UNION FREE SCHOOL DISTRICT

17

Proposed PlanBond Referendum 2017 March 2018 Building Bond Planning March 2018 Bond Referendum Planning

REMEMBER TO VOTE Thursday, March 15, 2018 6:00 am to 9:00 pm at your local elementary school

UNIONDALE UNION FREE SCHOOL DISTRICT

18

Proposed Bond Plan Revisions – California Ave. California Avenue School PreK – 5 Estimated Pupil Capacity 918 Scholars (2017/18 - 872 Scholars) • • • • • • • • •

16-classroom addition • Site/playground/parking upgrades • Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations General Purpose room renovations • Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium

UNIONDALE UNION FREE SCHOOL DISTRICT

Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Exterior wall repairs • Chimney/soffit repairs • Flooring renovations

19

Proposed Bond Plan Revisions – Grand Ave. Grand Avenue School PreK – 5 Estimated Pupil Capacity 392 Scholars (2017/18 - 315 Scholars) • • • • • • • • • •

• 9-classroom addition • Site/playground/parking upgrades Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations • General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium Kitchen service line upgrades

UNIONDALE UNION FREE SCHOOL DISTRICT

Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Electric panel replacement • Public address system replacement

20

Proposed Bond Plan Revisions – Northern Pkwy. Northern Parkway School PreK – 5 Estimated Pupil Capacity 870 Scholars (2017/18 - 821 Scholars) • • • • • • • • •

• 22-classroom addition • Site/playground/parking upgrades Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations • General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium

UNIONDALE UNION FREE SCHOOL DISTRICT

Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Exterior wall repairs • Chimney repairs • Roofing replacement • Flooring renovations • ADA access upgrades • New windows 21

Proposed Bond Plan Revisions – Smith Street Smith Street School PreK – 5 Estimated Pupil Capacity 574 scholars (2017/18 - 492 scholars) • • • • • • • • •

6-classroom addition Site/playground/parking • upgrades • Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations • General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium Kitchen serving line upgrades

UNIONDALE UNION FREE SCHOOL DISTRICT

Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Boiler, burner, and controls replacement • Flooring renovations

22

Proposed Bond Plan Revisions – Walnut Street Walnut Street School PreK – 5 Estimated Pupil Capacity 656 scholars (2017/18 - 593 scholars) • • • • • • • • • •

• 13-classroom addition • Site/playground/parking upgrades Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations • General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium Kitchen serving line upgrades

UNIONDALE UNION FREE SCHOOL DISTRICT

Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Boiler, burner, and controls replacement • New gas service upgrade

23

Proposed Bond Plan Revisions – Cornelius Court Cornelius Court School 10 classrooms* • • •



4-classroom addition New gymnasium Relocation of offices currently located at Cornelius Court to lower levels of California Avenue and Northern Parkway to create 3 classrooms Renovation of 3 existing classrooms

UNIONDALE UNION FREE SCHOOL DISTRICT

• •



Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Boiler, burner, and control upgrades • Electrical panel upgrades

24

Proposed Bond Plan Revisions – Lawrence Road Lawrence Road School Grades 6-8 Estimated Pupil Capacity 919 scholars (2017/18 - 823 scholars) • • • • • • • • •

11-classroom addition 9-classroom addition New testing rooms and language labs Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium, locker and chorus rooms

UNIONDALE UNION FREE SCHOOL DISTRICT

• • • • • •



Band room expansion Kitchen ventilation upgrades Parking/site renovations Multi-purpose synthetic field Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Replace existing boilers, burners and controls

25

Proposed Bond Plan Revisions – Turtle Hook Turtle Hook School Grades 6-8 Estimated Pupil Capacity 897 scholars (2017/18 - 753 scholars) • • • • • • • • •

9-classroom addition 7-classroom addition New testing rooms and language labs Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium, locker and chorus rooms

UNIONDALE UNION FREE SCHOOL DISTRICT

• • • • • •



Band room expansion Kitchen ventilation upgrades Parking/site renovations Multi-purpose synthetic field Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias and libraries Building condition survey (BCS) work • Remove old transformers from vault

26

Proposed Bond Plan Revisions – High School Uniondale High School Grades 9-12 Estimated Pupil Capacity 2800 scholars (2017/18 - 2389 scholars) • • • • • • • • • • • •

41-classroom addition 30-classroom addition New testing rooms and language labs Science room renovations New resource, speech, OT, and PT rooms Library Media Center renovations General Purpose room renovations Nurse’s office renovations Social Worker, psychologist, guidance upgrades New auxiliary gymnasium with locker rooms Fitness center renovations Cafeteria additions Cafeteria upgrades

UNIONDALE UNION FREE SCHOOL DISTRICT

• • • • • • • •



Parent Resource Center Additional bathrooms Kitchen ventilation upgrades Parking/site renovations Multi-purpose synthetic fields w/ lighting Concession stand w/ toilets Central air conditioning building-wide Central air conditioning only in new construction and common group spaces like general purpose rooms, cafeterias, libraries, second and third floors Building condition survey (BCS) work • New student lockers • Boiler, burner, and control upgrades 27

Board of Education and Central Administration

Emerson Mott, President James M. Sharpe III, Vice President Bruno A. Cubas, Trustee

Neville G. Georges, Trustee Terri M. Mangum, Ph.D., Trustee Anika Campbell, Student Member

UNIONDALE UNION FREE SCHOOL DISTRICT

Dr. William K. Lloyd, Superintendent of Schools Rhonda A. Taylor, Assistant Superintendent for Curriculum and Instruction Myrtle E. Dickson, Assistant Superintendent for Human Resources

Jamal Scott, Assistant Superintendent for Business Affairs

28

Recommend Documents