Untitled - Realla

Report 6 Downloads 34 Views
W LK INTO THE NEXT GENER TION • 100,000 SQ FT GRADE A HEADQUARTERS BUILDING • STRIKING QUADRUPLE HEIGHT RECEPTION • GENEROUS FLOORPLATES OF 24,000 SQ FT WITH FEATURE TERRACES • 353 CAR PARKING SPACES (1:278 SQ FT) • DEDICATED BIKE STORAGE, CHANGING AND SHOWER FACILITY

CGI IMAGERY IS INDICATIVE THROUGHOUT

FL

5



THE 4 LONGWALK DESIGN HAS REMAINED FAITHFUL TO THE ORIGINAL BUILDING BUT HAS BEEN UPGRADED TO MODERN STANDARDS WITH A DYNAMIC ENTRANCE AND ATRIUM ALONG WITH MORE EFFICIENT OFFICE SPACE BARR GAZETAS - SCHEME ARCHITECT



FL

6

FOUR STOREY

OFFICE HEADQUARTERS THE CENTRAL SPINE PUNCHES THROUGH THE ROOF PLANE TO MAINTAIN THE EXISTING BUILDING’S DISTINCTIVE PROFILE. THE TOP FLOOR TERRACES EXAGGERATE THE ROOF CANTILEVER AND THE ANODISED BRONZE FINISH PROVIDES A WARM COUNTERPOINT TO SLEEK GLASS AND STEEL

FL

7

353 CAR SPACES

SCHEDULE OF

CAR PARKING RATIO 1:278 SQ FT

Floor

sq ft

sq m

Third

24,474

2,274

Second

24,883

2,312

First

24,084

2,237

Ground Office

24,740

2,298

Ground Reception Total

VAILABILITY

RE S

1,602

149

99,783

9,270

Car Parking ratio of 1:278 sq ft - Total spaces 353

FL

8

GROUND FLOOR

FIRST FLOOR

24,740 SQ FT / 2,298 SQ M RECEPTION 1,602 SQ FT / 149 SQ M

24,084 SQ FT / 2,237 SQ M

RECEPTION

BICYCLE RACKS

SHOWER AND CHANGING FACILITIES

FL

9

SECOND FLOOR

THIRD FLOOR

24,883 SQ FT / 2,312 SQ M

24,474 SQ FT / 2,274 SQ M TERRACE SPACE 646 SQ FT / 60 SQ M

TERRACES

FL

10

FL

11

SUST INABILITY • Targeting BREEAM Excellent and Energy Performance Certificate B Rating • 72 cycle bays and 3 motorcycle bays • 10 car charging points included within the 353 car parking spaces • Dedicated shower and changing facilities with lockers and drying room • Recycling stores • Lighting design controls for optimum energy use • Heating, Ventilation and Air Conditioning controlled by Building Management System • Integrated cladding and glazing facade system • High performance glazing admitting daylight while minimising solar gain • Roof mounted solar panels

FL

12

DEDICATED SHOWER AND CHANGING FACILITIES • 8  00 sq ft changing facility (including the lobby and drying room) • 9 showers • 72 lockers • 72 cycle racks

FL

13

SPECIFIC TION GRADE A, HIGH QU LITY FINISHES THROUGHOUT

FL

14

1. Parking 353 parking spaces (1:278 sq ft) including 10 car charging points 72 cycle spaces and 3 motorcycle spaces

8. Reception Quadruple height reception Floors: Large format stone tiles. Service void within floor screed to facilitate introduction of security ‘turnstiles’ by tenant Ceilings: Emulsion paint on plasterboard with recessed downlighters

2. Occupancy Means of escape 1 person/7 sqm Internal climate 1 person/10 sqm Lift provision 1 person/7 sqm Sanitary provision 1 person/10 sqm (60% Male / 60% Female)

9. Atrium Open atrium at ground floor with full height glazing on upper levels Roof: Exposed aluminium structure supporting glazed panels with louvres integrated into the walls at high level

3. Air Conditioning Four pipe fan coil air conditioning Winter 20°C ± 2°C, Summer 24°C ± 2°C

10. Lifts 3 x 17 person passenger lifts in reception and 1 x 2,000 kg goods and passenger lift provided to the rear core

4. Planning Module 1.5m

11. Internal Finishes - Offices Walls: Emulsion paint on plasterboard Floors: 600 x 600mm modular fully accessible steel encapsulated raised floor Ceilings: 600 x 600mm fully demountable perforated metal tile with plasterboard margins Doors: Full-height metal framed glass doors to main core; walnut doors to secondary cores and lobbies; satin stainless steel ironmongery to all doors; service and duct doors painted Balcony Balustrades: Frameless toughened laminated glass Lighting: LED lighting Blinds: Installation of recess for tenant to install blinds

5. Structural Grid 9m 6. Floor Loadings Office floors 5.0kN/sqm + 1kN/sqm for partitions Capacity of supporting columns and foundations limited to equivalent total loading of 2.5kN/m2 + 0.8kN/m2 for partitions Roof plant areas Imposed load 5.0kN/sqm 7. Key Dimensions Office floor to floor 3,950mm (Ground 4,850mm) Raised floor 150mm (Ground 180mm) Office floor to ceiling 2,800mm (Ground floor 3,600mm) Ceiling lighting zone 100mm Services zone 760mm between the beams Structure 125mm

12. WCs Wall and Skirting Finishes: Painted plastered or plasterboard walls Floor Finishes: Floor screed with ceramic tiled floor Ceiling Finishes: Plasterboard ceilings with polyester powder coated access panels in WC cubicles

FL

15

Vanity Units: Solid surface trough basins with wall mounted water saving taps Hand Dryers: Recessed stainless steel combination paper towel dispensers and hand dryers Mirrors: Mirrors to ceiling from vanity unit level and full height mirrors 13. Showers and Cycle Changing Facilities Shower Facilities: 4 Shower units to each changing area, with 1 fully accessible shower within the rear core at ground floor (9 showers in total) Wall and Skirting Finishes: Walls to shower cubicles to be tiled with 200 x 200mm module. Painted plastered or plasterboard walls. Square edged MDF painted skirtings Floor Finishes: Floor screed with vinyl sheet flooring finish throughout Ceiling Finishes 600  x 600mm fully demountable perforated metal suspended ceiling system with plasterboard margins to the locker rooms Plasterboard ceilings with polyester powder coated access panels in the shower cubicles only 72 Lockers: Dedicated lockers and drying room within changing areas 14. External Finishes Curtain walling: Unitised system of polyester powder coated Aluminium framing with double glazed solar control glass with external shading to front elevations Cladding: Polyester powder-coated aluminium cladding panels on metal framework to concrete or block walls, aluminium louvres and panels for plant room walls Roof: Glazed atrium roof Doors: Metal framed and glazed polyester powder-coated escape doors

Ruislip

Hillingdon Uxbridge

Ruislip Manor Eastcote

Ickenham

CONNECTIONS

Ruislip Rayners Lane Gardens South Ruislip 15 Minutes

South Harrow

Sudbury Hill

Northolt

from the North West Liverpool Manchester Birmingham Rugby Northampton Milton Keynes

Sudbury Town

Greenford

from Glasgow Edinburgh Newcastle Yorkshire Derby the East Midlands Peterborough

Alperton Paddington Edgware Marylebone Road

South Greenford

19 Minutes from Swindon Bath Bristol South Wales

Reading

Maidenhead

Slough

Iver

10 Minutes

West Drayton

Castle Bar Park Drayton Green

Hanger Lane Park Royal North Ealing Ealing Broadway

Hanwell

West Acton

North Acton

Latimer Road East Acton

Acton Town

Hammersmith

Ladbroke Grove Notting Hill Gate Holland Park

Barons Court

Central Line Chiswick Park

National Rail

Ravenscourt Park

Edgware Road

Westbourne Park

Acton s Mainline White City Shepherd’ Bush Shepherd’s Bush

West Ealing Ealing Common South Ealing

West Kensington

Earl’s Court

Bayswater Marble Arch

Regent’s Park Oxford Circus

South Kensington

St James’s Park

Piccadilly Line Heathrow Terminals 1,2,3

Circle Line Hammersmith and City Line Bakerloo Line

King’s Cross St. Pancras

Euston

Farringdon

Heathrow Terminal 4

Proposed Crossrail line - Due to be completed in 2019

Victoria Line

FL

17

Warren Street

Euston Square

Holborn

Russell Square Chancery Lane

Barbican

Liverpool Street

Moorgate

St. Paul’s Lancaster Bond Tottenham Street Court Road Gate Aldgate Bank Covent Garden Green Park Hyde Park Cannon Street Leicester High Street Corner Square Kensington Piccadilly Circus Monument Tower Hill Blackfriars Knightsbridge Mansion Charing Gloucester House Cross Temple Road Victoria Westminster

Metropolitan Line District Line

Great Portland Street

Royal Oak

Southall Hayes & Harlington

Baker Street

Embankment

LONDON

CONNECTING TO STOCKLEY P RK

CONNECTIONS MADE EASY

A10

350

U5

First Western

Heathrow Connect

Uxbridge Tube Station

Hayes and Harlington Station

Uxbridge Station

Reading

Paddington

15 Minutes

10 Minutes

15 Minutes

25 Minutes

15 Minutes

West Drayton Rail Station

West Drayton Rail Station

Hayes & Harlington Rail Station

19 Minutes

10 Minutes (Taxi)

6 Minutes (Taxi)

9 Minutes

17 Minutes

Heathrow Airport Bus Station

Heathrow Terminal 5 10 Minutes

6 Minutes (Taxi)

6 Minutes (Taxi)

Hayes & Harlington Rail Station

Hayes & Harlington Rail Station

Hayes & Harlington Rail Station 6 Minutes

20 Minutes

Heathrow Airport (2 miles) Paris Dublin Amsterdam Frankfurt Madrid Dubai New York San Francisco Los Angeles Hong Kong Cape Town

1hr15 1hr15 1hr15 1hr40 2hrs15 7hrs 7hrs 11hrs 11hrs20 11hrs30 11hrs40

With connections to 185 destinations (covering 84 countries)

Crossrail (Due to be completed in 2019) Liverpool Street 7 Minutes Bond Street 3 Minutes Paddington 16 Minutes Hayes & Harlington Rail Station 6 Minutes (Taxi)

Heathrow

Paddington

10 Minutes (Taxi) West Drayton Rail Station 29 Minutes Reading

FL

18

J1 (M40) M40

J1a (M40) A4 0

J16 (M25) Uxbridge

Metropolitan and Piccadilly Lines

37

Hillingdon

A4

LOC TION

UXBRIDGE A 408

A4

A3

30 MINUTES

37

io n

A4

n d U

12

G ra n na

A 408

Ca

M 25

DRIVE TO LONDON IN ONLY

020

l

Iver

HAYES

Stockley Park

Hayes and Harlington

West Drayton

Exceptional connectivity to 4 Longwalk right in the heart of thriving Stockley Park.

WEST DRAYTON J15 (M25) CE NT

J4 (M4) J3 (M4)

A4

RAL

LON

DON ine

dilly L

A4

Picca

Heathrow 6 minutes London 30 minutes Reading 35 minutes Oxford 55 minutes Gatwick Airport 45 minutes Brighton 1hr 15 minutes Cambridge 1hr 24 minutes Bristol 1hr 36 minutes Birmingham 1hr 45 minutes Manchester 3hrs 9 minutes

M 25

R

J4b (M4)

M4

H & SLOUG E A D IN G

Heathrow Airport J14 (M25)

A3

11

3

Hatton Cross

A3

0

SAT NAV: UB11 1FE J13 (M25)

FL

19

F NCY A REFRESHING W LK? Take a stroll around the extensively landscaped park and lakes

STOCKLEY P R K THE ARENA AT STOCKLEY PARK P R O V I D E S A N E X T E N S I V E COLLECTION OF AMENITIES, INCLUDING RESTAURANTS, COFFEE SHOPS AND BARS. THERE IS ALSO A VIRGIN ACTIVE H E A LT H C L U B A N D S TO C K L E Y P A R K G O L F C L U B O N S I T E .

FL

20

M4

Heathrow Airport

J4

M25

Coats Hasbro

Grass Valley IBM

Canon Europe

Toshiba

Regus

Samsonite

IMG Productions

Aspect Software Sharp Electronics

Apple

Mitsubishi Heavy Industries

Canon Europe

A408

nu

e

Fiserv

ad

w

Marks & Spencer

e

alk Ro

nd

Av

Gilead Sciences World Vision

Lucozade Ribena Suntory

ngw

u Ro

o

od

Lo

Stockley Park Golf Course

Celgene Corporation

The Arena (Retail and Leisure)

FL

21

Glaxo Smith Kline

FL

22

For further information contact

A development by

Richard Harding [email protected]

CONT CT

Sim Khatkar [email protected]

Misrepresentation Act 1967. Unfair Contract Terms Act 1977 The Property Misdescriptions Act 1991. These particulars are issued without any responsibility on the part of the agent and are not to be construed as containing any representation or fact upon which any person is entitled to rely. Neither the agent nor any person in their employ has any authority to make or give any representation or warranty whatsoever in relation to the property. Designed by 90degrees Design and Marketing 0161 833 1890. July 2015.

Jonathan Gardiner [email protected] Olivia Wood [email protected]

FL

23

UB11 1FE