W LK INTO THE NEXT GENER TION • 100,000 SQ FT GRADE A HEADQUARTERS BUILDING • STRIKING QUADRUPLE HEIGHT RECEPTION • GENEROUS FLOORPLATES OF 24,000 SQ FT WITH FEATURE TERRACES • 353 CAR PARKING SPACES (1:278 SQ FT) • DEDICATED BIKE STORAGE, CHANGING AND SHOWER FACILITY
CGI IMAGERY IS INDICATIVE THROUGHOUT
FL
5
“
THE 4 LONGWALK DESIGN HAS REMAINED FAITHFUL TO THE ORIGINAL BUILDING BUT HAS BEEN UPGRADED TO MODERN STANDARDS WITH A DYNAMIC ENTRANCE AND ATRIUM ALONG WITH MORE EFFICIENT OFFICE SPACE BARR GAZETAS - SCHEME ARCHITECT
”
FL
6
FOUR STOREY
OFFICE HEADQUARTERS THE CENTRAL SPINE PUNCHES THROUGH THE ROOF PLANE TO MAINTAIN THE EXISTING BUILDING’S DISTINCTIVE PROFILE. THE TOP FLOOR TERRACES EXAGGERATE THE ROOF CANTILEVER AND THE ANODISED BRONZE FINISH PROVIDES A WARM COUNTERPOINT TO SLEEK GLASS AND STEEL
FL
7
353 CAR SPACES
SCHEDULE OF
CAR PARKING RATIO 1:278 SQ FT
Floor
sq ft
sq m
Third
24,474
2,274
Second
24,883
2,312
First
24,084
2,237
Ground Office
24,740
2,298
Ground Reception Total
VAILABILITY
RE S
1,602
149
99,783
9,270
Car Parking ratio of 1:278 sq ft - Total spaces 353
FL
8
GROUND FLOOR
FIRST FLOOR
24,740 SQ FT / 2,298 SQ M RECEPTION 1,602 SQ FT / 149 SQ M
24,084 SQ FT / 2,237 SQ M
RECEPTION
BICYCLE RACKS
SHOWER AND CHANGING FACILITIES
FL
9
SECOND FLOOR
THIRD FLOOR
24,883 SQ FT / 2,312 SQ M
24,474 SQ FT / 2,274 SQ M TERRACE SPACE 646 SQ FT / 60 SQ M
TERRACES
FL
10
FL
11
SUST INABILITY • Targeting BREEAM Excellent and Energy Performance Certificate B Rating • 72 cycle bays and 3 motorcycle bays • 10 car charging points included within the 353 car parking spaces • Dedicated shower and changing facilities with lockers and drying room • Recycling stores • Lighting design controls for optimum energy use • Heating, Ventilation and Air Conditioning controlled by Building Management System • Integrated cladding and glazing facade system • High performance glazing admitting daylight while minimising solar gain • Roof mounted solar panels
FL
12
DEDICATED SHOWER AND CHANGING FACILITIES • 8 00 sq ft changing facility (including the lobby and drying room) • 9 showers • 72 lockers • 72 cycle racks
FL
13
SPECIFIC TION GRADE A, HIGH QU LITY FINISHES THROUGHOUT
FL
14
1. Parking 353 parking spaces (1:278 sq ft) including 10 car charging points 72 cycle spaces and 3 motorcycle spaces
8. Reception Quadruple height reception Floors: Large format stone tiles. Service void within floor screed to facilitate introduction of security ‘turnstiles’ by tenant Ceilings: Emulsion paint on plasterboard with recessed downlighters
2. Occupancy Means of escape 1 person/7 sqm Internal climate 1 person/10 sqm Lift provision 1 person/7 sqm Sanitary provision 1 person/10 sqm (60% Male / 60% Female)
9. Atrium Open atrium at ground floor with full height glazing on upper levels Roof: Exposed aluminium structure supporting glazed panels with louvres integrated into the walls at high level
3. Air Conditioning Four pipe fan coil air conditioning Winter 20°C ± 2°C, Summer 24°C ± 2°C
10. Lifts 3 x 17 person passenger lifts in reception and 1 x 2,000 kg goods and passenger lift provided to the rear core
4. Planning Module 1.5m
11. Internal Finishes - Offices Walls: Emulsion paint on plasterboard Floors: 600 x 600mm modular fully accessible steel encapsulated raised floor Ceilings: 600 x 600mm fully demountable perforated metal tile with plasterboard margins Doors: Full-height metal framed glass doors to main core; walnut doors to secondary cores and lobbies; satin stainless steel ironmongery to all doors; service and duct doors painted Balcony Balustrades: Frameless toughened laminated glass Lighting: LED lighting Blinds: Installation of recess for tenant to install blinds
5. Structural Grid 9m 6. Floor Loadings Office floors 5.0kN/sqm + 1kN/sqm for partitions Capacity of supporting columns and foundations limited to equivalent total loading of 2.5kN/m2 + 0.8kN/m2 for partitions Roof plant areas Imposed load 5.0kN/sqm 7. Key Dimensions Office floor to floor 3,950mm (Ground 4,850mm) Raised floor 150mm (Ground 180mm) Office floor to ceiling 2,800mm (Ground floor 3,600mm) Ceiling lighting zone 100mm Services zone 760mm between the beams Structure 125mm
12. WCs Wall and Skirting Finishes: Painted plastered or plasterboard walls Floor Finishes: Floor screed with ceramic tiled floor Ceiling Finishes: Plasterboard ceilings with polyester powder coated access panels in WC cubicles
FL
15
Vanity Units: Solid surface trough basins with wall mounted water saving taps Hand Dryers: Recessed stainless steel combination paper towel dispensers and hand dryers Mirrors: Mirrors to ceiling from vanity unit level and full height mirrors 13. Showers and Cycle Changing Facilities Shower Facilities: 4 Shower units to each changing area, with 1 fully accessible shower within the rear core at ground floor (9 showers in total) Wall and Skirting Finishes: Walls to shower cubicles to be tiled with 200 x 200mm module. Painted plastered or plasterboard walls. Square edged MDF painted skirtings Floor Finishes: Floor screed with vinyl sheet flooring finish throughout Ceiling Finishes 600 x 600mm fully demountable perforated metal suspended ceiling system with plasterboard margins to the locker rooms Plasterboard ceilings with polyester powder coated access panels in the shower cubicles only 72 Lockers: Dedicated lockers and drying room within changing areas 14. External Finishes Curtain walling: Unitised system of polyester powder coated Aluminium framing with double glazed solar control glass with external shading to front elevations Cladding: Polyester powder-coated aluminium cladding panels on metal framework to concrete or block walls, aluminium louvres and panels for plant room walls Roof: Glazed atrium roof Doors: Metal framed and glazed polyester powder-coated escape doors
Ruislip
Hillingdon Uxbridge
Ruislip Manor Eastcote
Ickenham
CONNECTIONS
Ruislip Rayners Lane Gardens South Ruislip 15 Minutes
South Harrow
Sudbury Hill
Northolt
from the North West Liverpool Manchester Birmingham Rugby Northampton Milton Keynes
Sudbury Town
Greenford
from Glasgow Edinburgh Newcastle Yorkshire Derby the East Midlands Peterborough
Alperton Paddington Edgware Marylebone Road
South Greenford
19 Minutes from Swindon Bath Bristol South Wales
Reading
Maidenhead
Slough
Iver
10 Minutes
West Drayton
Castle Bar Park Drayton Green
Hanger Lane Park Royal North Ealing Ealing Broadway
Hanwell
West Acton
North Acton
Latimer Road East Acton
Acton Town
Hammersmith
Ladbroke Grove Notting Hill Gate Holland Park
Barons Court
Central Line Chiswick Park
National Rail
Ravenscourt Park
Edgware Road
Westbourne Park
Acton s Mainline White City Shepherd’ Bush Shepherd’s Bush
West Ealing Ealing Common South Ealing
West Kensington
Earl’s Court
Bayswater Marble Arch
Regent’s Park Oxford Circus
South Kensington
St James’s Park
Piccadilly Line Heathrow Terminals 1,2,3
Circle Line Hammersmith and City Line Bakerloo Line
King’s Cross St. Pancras
Euston
Farringdon
Heathrow Terminal 4
Proposed Crossrail line - Due to be completed in 2019
Victoria Line
FL
17
Warren Street
Euston Square
Holborn
Russell Square Chancery Lane
Barbican
Liverpool Street
Moorgate
St. Paul’s Lancaster Bond Tottenham Street Court Road Gate Aldgate Bank Covent Garden Green Park Hyde Park Cannon Street Leicester High Street Corner Square Kensington Piccadilly Circus Monument Tower Hill Blackfriars Knightsbridge Mansion Charing Gloucester House Cross Temple Road Victoria Westminster
Metropolitan Line District Line
Great Portland Street
Royal Oak
Southall Hayes & Harlington
Baker Street
Embankment
LONDON
CONNECTING TO STOCKLEY P RK
CONNECTIONS MADE EASY
A10
350
U5
First Western
Heathrow Connect
Uxbridge Tube Station
Hayes and Harlington Station
Uxbridge Station
Reading
Paddington
15 Minutes
10 Minutes
15 Minutes
25 Minutes
15 Minutes
West Drayton Rail Station
West Drayton Rail Station
Hayes & Harlington Rail Station
19 Minutes
10 Minutes (Taxi)
6 Minutes (Taxi)
9 Minutes
17 Minutes
Heathrow Airport Bus Station
Heathrow Terminal 5 10 Minutes
6 Minutes (Taxi)
6 Minutes (Taxi)
Hayes & Harlington Rail Station
Hayes & Harlington Rail Station
Hayes & Harlington Rail Station 6 Minutes
20 Minutes
Heathrow Airport (2 miles) Paris Dublin Amsterdam Frankfurt Madrid Dubai New York San Francisco Los Angeles Hong Kong Cape Town
1hr15 1hr15 1hr15 1hr40 2hrs15 7hrs 7hrs 11hrs 11hrs20 11hrs30 11hrs40
With connections to 185 destinations (covering 84 countries)
Crossrail (Due to be completed in 2019) Liverpool Street 7 Minutes Bond Street 3 Minutes Paddington 16 Minutes Hayes & Harlington Rail Station 6 Minutes (Taxi)
Heathrow
Paddington
10 Minutes (Taxi) West Drayton Rail Station 29 Minutes Reading
FL
18
J1 (M40) M40
J1a (M40) A4 0
J16 (M25) Uxbridge
Metropolitan and Piccadilly Lines
37
Hillingdon
A4
LOC TION
UXBRIDGE A 408
A4
A3
30 MINUTES
37
io n
A4
n d U
12
G ra n na
A 408
Ca
M 25
DRIVE TO LONDON IN ONLY
020
l
Iver
HAYES
Stockley Park
Hayes and Harlington
West Drayton
Exceptional connectivity to 4 Longwalk right in the heart of thriving Stockley Park.
WEST DRAYTON J15 (M25) CE NT
J4 (M4) J3 (M4)
A4
RAL
LON
DON ine
dilly L
A4
Picca
Heathrow 6 minutes London 30 minutes Reading 35 minutes Oxford 55 minutes Gatwick Airport 45 minutes Brighton 1hr 15 minutes Cambridge 1hr 24 minutes Bristol 1hr 36 minutes Birmingham 1hr 45 minutes Manchester 3hrs 9 minutes
M 25
R
J4b (M4)
M4
H & SLOUG E A D IN G
Heathrow Airport J14 (M25)
A3
11
3
Hatton Cross
A3
0
SAT NAV: UB11 1FE J13 (M25)
FL
19
F NCY A REFRESHING W LK? Take a stroll around the extensively landscaped park and lakes
STOCKLEY P R K THE ARENA AT STOCKLEY PARK P R O V I D E S A N E X T E N S I V E COLLECTION OF AMENITIES, INCLUDING RESTAURANTS, COFFEE SHOPS AND BARS. THERE IS ALSO A VIRGIN ACTIVE H E A LT H C L U B A N D S TO C K L E Y P A R K G O L F C L U B O N S I T E .
FL
20
M4
Heathrow Airport
J4
M25
Coats Hasbro
Grass Valley IBM
Canon Europe
Toshiba
Regus
Samsonite
IMG Productions
Aspect Software Sharp Electronics
Apple
Mitsubishi Heavy Industries
Canon Europe
A408
nu
e
Fiserv
ad
w
Marks & Spencer
e
alk Ro
nd
Av
Gilead Sciences World Vision
Lucozade Ribena Suntory
ngw
u Ro
o
od
Lo
Stockley Park Golf Course
Celgene Corporation
The Arena (Retail and Leisure)
FL
21
Glaxo Smith Kline
FL
22
For further information contact
A development by
Richard Harding
[email protected] CONT CT
Sim Khatkar
[email protected] Misrepresentation Act 1967. Unfair Contract Terms Act 1977 The Property Misdescriptions Act 1991. These particulars are issued without any responsibility on the part of the agent and are not to be construed as containing any representation or fact upon which any person is entitled to rely. Neither the agent nor any person in their employ has any authority to make or give any representation or warranty whatsoever in relation to the property. Designed by 90degrees Design and Marketing 0161 833 1890. July 2015.
Jonathan Gardiner
[email protected] Olivia Wood
[email protected] FL
23
UB11 1FE