Arterial Road Potential Bus Route Crossing (Pedestrian and Cyclist) 400m Walkable catchment (From open space) On Road Bike Lane (1.7-2m both sides) Off Road Shared Trail (3m) Off Road Shared Trail Network (Within Open Space)
Medium Density Housing
School
Street
Level 2
Morris Road
Access
Fors yth ReseDrainage rve
Traffic Signals
Connector Str
eet
Trails, walkways and paths along waterways must be above the 1:10 year flood level. Crossings over waterways must be above the 1:100 year flood level.
Medium Density Housing
Trails, walkways and paths along waterways must be above the 1:10 year flood level. Crossings over waterways must be above the 1:100 year flood level.
onal Regi
Ra
e il Lin
This plan is produced without prejudice to any land acquisition and compensation matters for this property
Leakes Pty Ltd | Wyndham North Client
Leakes Pty Ltd
Drawing No
136 345 LMP06
Revision
AL
Checked by
Drawn By
N
0
50
100
150
6 MB 200
Date
07.06.13
Approved by
FS
250
Scale 1:5000 @ A3
Northern Application - Pedestrian and Cycle Network Plan
Cross Section - N2 & N3 - Connector Street & Feature Connector Street (School & Active Open Space Interface) File location G:\13\136345\SDD\136345_LMP Sections.indd