Update on the LTBP Program AWS

Report 1 Downloads 50 Views
Southeast Bridge Preservation Partnership Charleston, WV Charleston Civic Center April 10, 2017

Update on the Federal Highway Administration’s (FHWA) Long Term Bridge Performance Program (LTBP) Robert Zobel, Ph.D., P.E. LTBP Program Coordinator Federal Highway Administration

Long-Term Bridge Performance Program

Quick Refresher LTBP Program

Program Focus

Implementation

Questions

Long-Term Bridge Performance Program

LTBP Program

Quick Refresher

A Quick Refresher • • • • •

6 High Priority Areas 14 Bridge Clusters 10 Bridge Corridors Reference Bridge Cluster Bridge

Untreated Concrete Decks Treated Concrete Decks

Prestressing/Post Tensioning Strands Steel Coatings Joints

Bearings

LTBP Program

Quick Refresher

Long-Term Bridge Performance Program

A Quick Refresher • • • • •

6 High Priority Areas 14 Bridge Clusters 10 Bridge Corridors Reference Bridge Cluster Bridge

Long-Term Bridge Performance Program

LTBP Program

Quick Refresher

A Quick Refresher • • • • •

6 High Priority Areas 14 Bridge Clusters 10 Bridge Corridors Reference Bridge Cluster Bridge

Visual Inspection Non-standard Arms length Segment-based Conventional Tools

Global Testing Load Testing Modal Testing Continuous Monitoring

NDE Impact Echo GPR Ultrasonic Imaging Resistivity

Cluster of Bridge Type A

Comparison: Cluster vs. Cluster Influences of Inputs: Climate, Maintenance Practices, etc.

Mat’l Testing Material Sampling Stiffness Strength Porosity Chloride Content

Long-Term Bridge Performance Program

Field Data Collection

LTBP Program

Quick Refresher

NDE, Visual Inspection, Material Sampling Mid-Atlantic Clusters (2)

 Third round – 2 Mid-Atlantic Clusters (Spring 2017)  First round – 4 clusters NW, SW, Gulf (2) – Complete  Initiate Data Collection in Clusters/Corridors Nationally – (Late 2017 – Early 2018)

NW and SW Clusters (2)

Gulf Clusters (2)

Long-Term Bridge Performance Program

Quick Refresher

Field Data Collection Legacy Data Mining

Untreated Decks

4 clusters in NE region

> 400 Bridges - Data Collection/Extraction Complete

10 Corridors, 10 Clusters

LTBP Program

> 1200 Bridges - Data Collection/Extraction 85 % Complete Summer 2017

Treated Decks

Legacy Data Mining for Treated Decks Initiate Late 2017

Long-Term Bridge Performance Program

Quick Refresher LTBP Program

Program Focus

Implementation

Questions

Long-Term Bridge Performance Program

LTBP Program Focus Areas – Near Term

LTBP Program

Program Focus

• Data Collection

Untreated Bridge Decks Treated Bridge Decks

• Data Access

Provide data access via LTBP Bridge Portal

• Programmatic Support

Coordination, meetings, website, bridge portal, gap analyses, etc.

Long-Term Bridge Performance Program

LTBP Program Focus Areas – Near Term

LTBP Program

Program Focus

• Data Collection

Untreated Bridge Decks Treated Bridge Decks

• Data Access

Provide data access via LTBP Bridge Portal

• Programmatic Support

Coordination, meetings, website, bridge portal, gap analyses, etc.

Long-Term Bridge Performance Program

Program Focus Areas – Data Collection

LTBP Program

Program Focus

LTBP Bridge Breakdown Untreated Decks

Treated Decks

Concrete Steel Multigirder

Steel Coatings

Bearings

Joints

Prestressed Concrete Multigirder

Concrete Steel Multigirder

Prestressed Concrete Box

Prestressing Strands

Bearings

Joints

Steel Coatings

Bearings

Joints

Near Term Data Collection Focus

Prestressed Concrete Multigirder

Prestressed Concrete Box

Prestressing Strands

Bearings

Joints

Long-Term Bridge Performance Program

Program Focus Areas – Data Collection

LTBP Program

Program Focus

LTBP Bridge Breakdown Untreated Decks

Treated Decks

Concrete Steel Multigirder

Steel Coatings

Bearings

Joints

Prestressed Concrete Multigirder

Concrete Steel Multigirder

Prestressed Concrete Box

Prestressing Strands

Bearings

Joints

Steel Coatings

Bearings

Joints

Prestressed Concrete Multigirder

Prestressed Concrete Box

Prestressing Strands

Bearings

Preparation for Data Collection for Treated Bridge Decks

Joints

Long-Term Bridge Performance Program

LTBP Program Focus Areas – Near Term

LTBP Program

Program Focus

• Data Collection

Untreated Bridge Decks Treated Bridge Decks

• Data Access

Provide data access via LTBP Bridge Portal

• Programmatic Support

Coordination, meetings, website, bridge portal, gap analyses, etc.

Long-Term Bridge Performance Program

LTBP Program

Program Focus

Program Focus Areas – Data Access – LTBP Bridge Portal

• Standardize Updates NBI/NBE/Environmental LTBP Field Data

• Improve Accessibility • Maintain Functionality

Long-Term Bridge Performance Program

LTBP Program Focus Areas – Near Term

LTBP Program

Program Focus

• Data Collection

Untreated Bridge Decks Treated Bridge Decks

• Data Access

Provide data access via LTBP Bridge Portal

• Programmatic Support

Coordination, meetings, website, bridge portal, gap analyses, etc.

Long-Term Bridge Performance Program

Program Focus Areas – Programmatic Support Program Focus

Quality Assurance of Raw and Analyzed Data

Bridge Deck Performance Analysis and Modeling

LTBP Program

Strategic Research Matrices

Development/Refinement of Protocols (Treated Decks, LT Monitoring)

Long-Term Bridge Performance Program

Quick Refresher LTBP Program

Program Focus

Implementation

Questions

Long-Term Bridge Performance Program

LTBP Program

Implmentation

Proposed Data Collection Approach 3 Regions for Clusters – (1) Western, (2) Central, (3) Eastern Western Region – Clusters - NW, SW, Rocky Mountains (2) Central Region – Clusters - East Central (2), Mid-West (2), and Gulf Coast (2) Eastern Region – NE, Mid Atlantic (2)

2 Directions for Corridors

East-West Corridors

I-40, I-70, I-80, I-90, I-94

North-South Corridors I-95, I-35, I-29, I-15, I-5

Long-Term Bridge Performance Program

Proposed Data Collection Approach

LTBP Program

Implmentation

Proposed Data Collection Activities – Untreated Bridge Decks, Joints, and Bearings • Reference Bridges Detailed Visual Inspection, NDE (RABIT™), Material Sampling, and Long-Term Instrumentation • • • • •

Western Region Cluster Bridges Central Region Cluster Bridges Eastern Region Cluster Bridges Corridors (East-West) Corridors (North-South)

Cursory NDE and Imaging using RABIT ™

Long-Term Bridge Performance Program

LTBP Program

Implmentation

Automated Data Collection RABIT™-CE Bridge Deck Assessment Tool Robotic platform and operations center for in-situ assessment of bridge decks using imaging and nde technologies.

Technologies Deployed • • • • •

Impact Echo Ground Penetrating Radar Ultrasonic Surfaces Waves Electrical Resistivity Composite Imaging and Crack Mapping

System Operations

• Deployment, Control, QC • Onsite data and image processing

LTBP Program

Implmentation

Long-Term Bridge Performance Program Proposed Data Collection Approach: Increasing Cluster Bridge Sample Size

Cycle # 5 (12 Bridges) Round 1 Cycle # 4 Cycle # 5 (12 Bridges) (12 Bridges) Round 1 Point Round–2Add Decision

Cycle # N (12 Bridges) Round i-4 Cycle # N (12 Bridges) Round i-3

Cycle # 3 (12 Bridges) Round 1

bridges orCycle steady Cycle #4 #5 (12 Bridges) Bridges) state data(12 collection Round 2 Round 3

Cycle # N (12 Bridges) Round i-2

Cycle # 2 (12 Bridges) Round 1

Cycle # 3 (12 Bridges) Round 2

Cycle # 4 (12 Bridges) Round 3

Cycle # 5 (12 Bridges) Round 4

Cycle # N (12 Bridges) Round i-1

Cycle # 1 (12 Bridges) Round 1

Cycle # 2 (12 Bridges) Round 2

Cycle # 3 (12 Bridges) Round 3

Cycle # 4 (12 Bridges) Round 4

Cycle # 5 (12 Bridges) Round 5

Cycle # N (12 Bridges) Round i

12 Bridges

+ 12

+ 12

+ 12

Up to 60 Bridges

Long-Term Bridge Performance Program

LTBP Program

Implmentation

Implementation ……… Two New Contracts: Programmatic Support Technical Support Services Contract (TSSC) – recently awarded Field Data Collection Support

Data Collection Contract – Synopsis recently posted on FedBizOps – expected to be awarded Summer 2017

Long-Term Bridge Performance Program

LTBP Program

Implmentation

Proposed Phased Data Collection Approach UNTREATED Bridge Decks, Joints, and Bearings 2017

Data Collection Activity Q1 Reference Bridges

Q2

Q3

2018 Q4

Q1

Q2

Q3

2019 Q4

Q1

Q2

Q3

2020 Q4

Q1

Q2

Q3

2021 Q4

Q1

Q2

Q3

2022 Q4

Q1

Q2

Western Region Cluster Bridges Central Region Cluster Bridges

Eastern Region Cluster Bridges

Corridor Bridges (1-5)

Corridor Bridges (6-10) Designates Reference Bridge Schedule Designates First Data Collection Cycle Designates Second Data Collection Cycle (Additional Bridges) Designates Third Data Collection Cycle (Additional Bridges)

Phase in Treated Bridge Decks

Q3

Q4

Long-Term Bridge Performance Program

Quick Refresher LTBP Program

Program Focus

Implementation

Questions