Lindon Heritage Trail Construction Parents should advise students Walking Routes Alternate Route #1 300
Road w e i v /Lake h t r o N
Alternate Route #1: Students can walk along the west side of 800 West.
400 West
rth 10 No th 20 Sou
600 West
Attention Parents! During construction, students will not be allowed to walk on the east side of 800 West.
walking to Aspen Elementary along 800 West to observe safety precautions and walk along the west side of the construction zone in the designated pedestrian corridor. Alternately, to avoid the construction zone, children can travel east along Lakeview Rd., using the trail on the south side of the road and then turn south along 400 West until it rejoins the regular walking route at 100 South. Alternate walking route during construction
100 South
800 West
Regular walking route
200 South
400 West
200 South
N
Aspen Elementary
Alternate Route #2 300
Road w e i v /Lake h t r o N
800 West
400 West
rth 10 No th 20 Sou
600 West
Alternate Route #2: Students can walk along the trail on 300 North.