Work Activity FEB FEB FEB MAR MAR MAR MAR MAR APR APR

Report 2 Downloads 208 Views
Work Activity

FEB FEB FEB MAR MAR MAR MAR MAR APR APR APR APR MAY MAY MAY MAY JUN JUN JUN JUN JUN JUL JUL WK2 WK3 WK4 WK1 WK2 WK3 WK4 WK5 WK2 WK3 WK4 WK5 WK1 WK2 WK3 WK4 WK1 WK2 WK3 WK4 WK5 WK1 WK2 8 to 14 15 to 21 22 to 28 29 to 6 7 to 13 14 to 20 21 to 27 28 to 3 4 to 10 11 to 17 18 to 24 25 to 1 2 to 8 9 to 15 16 to 22 22 to 29 30 to 5 6 to 12 13 to 19 20 to 26 27 to 3 4 to 10 11 to 17

Excavation Site utilities Paving Termite control Fencing Demolition Pavement marking Building concrete Masonry Structural steel Steel erection Millwork Roofing and sheetmetal Exterior sealant Frames doors hardware Glass and glazing overehead doors Drywall and acoustical Ceramic tile Floor covering Paint tape and bed Plaster/EIFS Wood floor Building specialties Visual display boards Metal lockers canopies Food service equipment Stage equipment Labotatory equipment bleachers Sidewalks gallagher punch Punch BWA final clean punch Electrical trim out Set plumbing fixtures HVAC Start up Set Roof top units

THIS SCHEDULE IS PROVIDED FOR GENERAL INFORMATION AND THE DATES CONTAINED HEREIN ARE INTENDED AS MILESTONES. IF IT IS POSSIBLE FOR THE CONSTRUCTION MANAGER TO COORDINATE THE WORK FOR SUBSTANTIAL COMPLETION PRIOR TO THE DURATION SPECIFIED, THEN IT SHALL BE COMPULSORY FOR THE TRADE CONTRACTOR/SUPPLIER, WITHOUT ADDITIONAL COST TO THE OWNER, TO PROVIDE ITS FULLEST EFFORT AND COOPERATION AS MAY BE REQUIRED TO LESSEN THE DURATION OF THE OVERALL SCHEDULE TO THE MAXIMUM EXTENT POSSIBLE

Dilley high school

THIS SCHEDULE IS PROVIDED FOR GENERAL INFORMATION AND THE DATES CONTAINED HEREIN ARE INTENDED AS MILESTONES. IF IT IS POSSIBLE FOR THE CONSTRUCTION MANAGER TO COORDINATE THE WORK FOR SUBSTANTIAL COMPLETION PRIOR TO THE DURATION SPECIFIED, THEN IT SHALL BE COMPULSORY FOR THE TRADE CONTRACTOR/SUPPLIER, WITHOUT ADDITIONAL COST TO THE OWNER, TO PROVIDE ITS FULLEST EFFORT AND COOPERATION AS MAY BE REQUIRED TO LESSEN THE DURATION OF THE OVERALL SCHEDULE TO THE MAXIMUM EXTENT POSSIBLE

AUG AUG AUG AUG AUG WK1 WK2 WK3 WK4 WK3 18 to 24 25 to 31 1 to 7 8 to 14 15 to 21 22 to 28 29 to 4 JUL WK3

JUL WK4