Summary ‐ Free State Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services
83639 Sites 5517 Households hectares 1317.69 58312 0 62895 4893 62441 1647
Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households Households Households Households Households Households Households
62520 583 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP [3 + 5 + 7 + 9] 11
[4+6+8+10] 12
Variation
13
[13‐12] 14
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
(504) ‐ (1 800) (20) (22) (1 065) (1 997) (1 497) (1 066) (1 065) ‐ (14 555) (150)
‐ ‐ ‐ ‐ ‐ ‐
(5) (15) (1) ‐
‐
‐ ‐
‐
‐
‐
1 ‐ ‐ ‐
‐
‐
1
2
3
4
5
6
7
8
9
10
2 396 ‐ 1 650 ‐ 104 1 499 5 495 3 068 3 077 1 069 2 315 4 659 8 578
530 ‐ 2 450 48 101 1 072 4 147 3 067 1 070 1 068 ‐ 18 150 2 834
504 ‐ 2 400 20 25 1 067 2 254 1 757 1 067 1 065 ‐ 15 210 1 000
504 ‐ 1 800 20 22 1 065 1 997 1 497 1 066 1 065 ‐ 14 555 150
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 891
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
26 ‐ ‐ ‐ ‐ 1 500 2 ‐ 1 ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
530 504
488 53 51 52
22 30 3 7
5 30 3 ‐
5 15 1 ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
5 5
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ 2 400 1 800 20 20 25 22 1 068 1 065 2 754 1 997 1 759 1 497 1 067 1 066 1 066 1 065 ‐ ‐ 15 210 14 555 1 891 150
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
30 15
3 1
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
‐
3
‐
3
‐
1
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius 1 647 583 ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
2 578 583 ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
1 647 583 200 100 ‐ ‐ 4 013 ‐ ‐ ‐ 16 ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
200 100 16 ‐
‐ ‐
(100) ‐
36 348 89 321 89 321 89 321 ‐ 6 8 8 7 ‐ 71 823 2 487 2 487 2 487 ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
89 321 89 321
‐ ‐ ‐
(89 321) (7) (2 487)
2 497 25 7 718 ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
931 931
‐ ‐ ‐ ‐ ‐ ‐
(931) (15) (1 848) ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
4 1 ‐ ‐ ‐ ‐ 11 3 2 1 1 ‐ 95 ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ (1) ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ 2 ‐ 7 ‐ ‐ 1
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ 3 ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
125 ‐
3 946 180
‐
(180)
Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
8 7 2 487 2 487
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
931 15 2 696 ‐
931 15 1 848 ‐
931 15 1 848 ‐
‐ ‐ ‐ ‐
15 15
1 848 1 848
Socio‐Economic Amenities
‐ ‐ ‐ ‐ ‐ 4 ‐ ‐ 1
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3 1 ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3 ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
Summary
1 899 6 012 3 579 180 121 ‐
121 ‐
Reason(s) for variation
Remedial action
MAN ‐ Mangaung Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
MAN
Reason(s) for variation
Remedial action
FS161 ‐ Letsemeng Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS161
Reason(s) for variation
Remedial action
FS162 ‐ Kopanong Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS162
Reason(s) for variation
Remedial action
FS163 ‐ Mohokare Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS163
Reason(s) for variation
Remedial action
DC16 ‐ Xhariep Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
1 190 100
‐
‐
‐
‐
‐
‐
100 ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC16
Reason(s) for variation
Remedial action
FS181 ‐ Masilonyana Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
14555
1064
Sites Households hectares
1200 14555 0 14555 1064 14555 1064 14555 0
Households Households Households Households Households Households Households Households
QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
6
7
8
9
10
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
Variation
13
[13‐12] 14
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ (1 200) (20) ‐ (1 064) (1 064) (1 064) (1 064) (1 064) ‐ (14 555) ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
1 064 1 064 1 064 1 064 1 064 1 064
‐ ‐ 1 200 1 200 1 200 ‐ 20 20 20 ‐ ‐ 1 064 1 064 1 064 ‐ 1 064 1 064 1 064 ‐ 1 064 1 064 1 064 ‐ 1 064 1 064 1 064 ‐ 1 064 1 064 1 064 ‐ ‐ 14 555 14 555 14 555 ‐ ‐
‐ ‐ 1 200 1 200 20 20 ‐ ‐ 1 064 1 064 1 064 1 064 1 064 1 064 1 064 1 064 1 064 1 064 ‐ ‐ 14 555 14 555 ‐ ‐
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
6 6
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
4 4
‐ ‐ ‐ ‐ ‐ ‐
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius 1 064
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
Number of additional households to be provided with water connections 2
300
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
1 064 ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
15 619 15 619 15 619 ‐ 2 2 2 ‐ 1 064 1 064 1 064 ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
15 619 15 619
‐ ‐ ‐
(15 619) (2) (1 064)
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
95 95 100 ‐
‐
‐
‐
‐
‐
95 100
‐
(100)
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐
2 2 1 064 1 064
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
300 ‐ 848 ‐
‐ ‐ ‐ ‐ ‐ ‐
Socio‐Economic Amenities Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
4 4 ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ 4 ‐ ‐ ‐
1 1
1
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS181
Reason(s) for variation
Remedial action
FS182 ‐ Tokologo Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
10611 Sites Households
583
hectares
Number of households in formal areas with access to basic electricity
11034 0 10611 583 10418 583
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households Households Households Households Households Households Households
10611 583 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
3
4
5
6
7
8
9
10
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ 3 583 ‐ 1 1 ‐ 583 2 500
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
15 2 ‐ ‐ ‐ 6 1 ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ 3 3 1 ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
583 583 200 100 ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ 3 3 3 2 ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
931 931 931 931 15 15 15 15 1 848 1 848 1 848 1 848 ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ 2 1 1 ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
150 150 75 35 ‐
3 583 1 1 583 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
200 100 ‐ ‐
‐ ‐
(100) ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ (2) ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
931 931
‐ ‐ ‐ ‐
(931) (15) (1 848) ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
75 35
‐
(35)
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐ ‐ ‐
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
1 ‐ ‐ ‐
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius 583 583 ‐ Number of additional households to be provided with water connections 583 583 ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
3 2 ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
15 15 1 848 1 848 ‐ ‐
Socio‐Economic Amenities 1 ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS182
Reason(s) for variation
Remedial action
FS183 ‐ Tswelopele Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS183
Reason(s) for variation
Remedial action
FS184 ‐ Matjhabeng Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS184
Reason(s) for variation
Remedial action
FS185 ‐ Nala Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS185
Reason(s) for variation
Remedial action
DC18 ‐ Lejweleputswa Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC18
Reason(s) for variation
Remedial action
FS191 ‐ Setsoto Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS191
Reason(s) for variation
Remedial action
FS192 ‐ Dihlabeng Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
37729 Sites Households
1470
hectares 117.69 32723 Households 0 Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services
37729 Households 846 Households 37468 Households 0 Households Households
Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
37354 Households
1 423
QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 output for 2016/17. as per Annual output output output output as per SDBIP as per SDBIP Report as per SDBIP as per SDBIP as per SDBIP
3
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
Reason(s) for variation
Remedial action
[13‐12] 14
4
5
6
7
8
9
10
‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ 1 ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
26 ‐ ‐ ‐ ‐ 1 500 2 ‐ 1 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
891 ‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
1 296 ‐ 50 ‐ 4 4 1 423 4 4 1 2 315
26 ‐ ‐ 50 ‐ 28 ‐ 1 ‐ 2 ‐ 500 500 3 3 2 2 ‐ ‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
223 2 ‐ ‐ 0 ‐ ‐
891
‐
26 ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ (500) ‐ (1) ‐ ‐
‐ ‐ 891 ‐ ‐
‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 ‐ ‐ 1 000 500
‐
5 ‐ ‐ 2 1 ‐ 1 ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐ ‐
‐
‐ 16
‐ ‐ 16 ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
16 ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 1 1 1 95 ‐ ‐
‐
‐
‐
‐
‐ ‐ ‐
‐
‐
‐
‐
‐
‐ ‐ ‐
95 There are no budget allocation for park
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped
‐ ‐ ‐ ‐ 2 ‐
‐ ‐
‐ ‐ ‐ 2
Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded
‐ ‐ ‐ 3 3 ‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
‐ ‐
‐
‐ ‐
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐
37 354 37 354 37 354 none none none 1 423 1 423 1 423
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ 5 870 ‐
‐ ‐ ‐ ‐ ‐ ‐
Socio‐Economic Amenities
development.
Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded
‐ ‐ 1 1 ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ 3 ‐
‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
3 ‐ ‐
‐ ‐ ‐ ‐ ‐
‐
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
‐
489 122
121 ‐
121 ‐
125 ‐
489 ‐ ‐
Identification of sites for the establishment of new cemetries in the following towns: Bethlehem, Fouriesburg and Clarens. Upgrading of all cemeteries around Dihlabeng.
Apply for MIG funding for the establishment of cemeteries. Town Planner for establishment of cemeteries in all towns was appointed. Awaiting Council's approval for the proposed sites before process can unfold. No allocation of budget for upgrading the cemeteries, .
No funds for establishement of satelite fire stations
Request financial assistance from TMDM.
‐ ‐
12
FS192
Clarens Public Library and Rosendal Public Library due to be developed. The Department of Sport, Arts, Culture and Recreation is responsible for building the new Clarens Library and Rosendal Public Library.
‐ ‐
‐
Local Economic Development and Job Creation:
Budget be availled.
‐
FS193 ‐ Nketoana Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS193
Reason(s) for variation
Remedial action
FS194 ‐ Maluti‐a‐Phofung Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites
2000 Households hectares 0 Households
Number of households in formal areas with access to basic electricity
0 Households Households 2000 Households Households 0 Households Households
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
0 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output output output output for 2016/17. as per Annual output as per SDBIP as per SDBIP Report as per SDBIP as per SDBIP
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1st Quarter Planned output as per SDBIP
1st Quarter Actual output
1
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
Variation
13
[13‐12] 14
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
(504) ‐ (600) ‐ (22) (1) (433) (433) (1) (1) ‐ ‐ (150)
‐ ‐ ‐ ‐
(5) (15) (1) ‐
‐ ‐ ‐
‐ ‐ ‐
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
1 100 ‐ 1 600 ‐ 100 3 2 000 2 000 3 3 ‐ 3 012 5 187
504 ‐ 600 ‐ 22 1 433 433 1 1 ‐ ‐ 150
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
504 504
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
51 15 5 5 53 30 30 15 51 3 3 1 40 ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
5 5
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
36 348 36 348 36 348 36 348 ‐ 3 3 3 3 ‐ 71 823 ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
36 348 36 348
‐ ‐ ‐
(36 348) (3) ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
1 748 4 883 3 135 ‐
‐
‐
‐
‐
‐
‐
3 135 ‐
‐
‐
504 504 ‐ ‐ 1 200 1 200 ‐ 100 25 3 3 2 000 690 2 000 690 3 1 3 1 ‐ 3 012 654 2 834 1 000
‐ ‐ 1 200 600 ‐ ‐ 25 22 3 1 690 433 690 433 1 1 1 1 ‐ ‐ 654 ‐ 1 000 150
Roads and storm water:
30 15 3 1 ‐ ‐
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
‐ ‐ ‐
‐ ‐ ‐ ‐
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius ‐ Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
‐ ‐
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
3 3 ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS194
Reason(s) for variation
Remedial action
FS195 ‐ Phumelela Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
Households
QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Actual Backlog as at Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Planned Actual Planned Actual Planned output for Actual Actual Planned Planned Actual beginning of 2016/17 as output output output output output 2016/17 output output for output output per the output 2016/17 as per SDBIP as per SDBIP as per as per SDBIP as per SDBIP 2016/17. SDBIP as per SDBIP Annual R t [3 + 5 + 7 + 9] [4+6+8+10] 1
2
3
4
5
6
7
8
9
10
11
12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
KMs of new paved roads to be built
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new gravelled roads to be built
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
Access to Services: Water ‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
Number of additional water service points to be installed for informal settlement dwellers within a 200m ‐ radius ‐ Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and
Reason(s) for variation
Remedial action
FS196 ‐ Mantsopa Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS196
Reason(s) for variation
Remedial action
DC19 ‐ Thabo Mofutsanyana Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC19
Reason(s) for variation
Remedial action
FS201 ‐ Moqhaka Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS201
Reason(s) for variation
Remedial action
FS203 ‐ Ngwathe Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS203
Reason(s) for variation
Remedial action
FS204 ‐ Metsimaholo Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS204
Reason(s) for variation
Remedial action
FS205 ‐ Mafube Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
20744 Sites Households
400
hectares 0 Households
Number of households in formal areas with access to basic electricity
0 Households Households 400 Households Households 0 Households Households
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
0 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP [3 + 5 + 7 + 9] 11
[4+6+8+10] 12
1
2
3
4
5
6
7
8
9
10
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ 425 425 ‐ 2 005 ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
195 ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ 3 997 ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
1 266 10 ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ 5 ‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐
‐ ‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
205 52 45 ‐
‐
‐
‐
‐
‐
52 45
‐
(45)
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 1 695 ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS205
Reason(s) for variation
Remedial action
DC20 ‐ Fezile Dabi Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb‐side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS ‐ 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Planned Actual output Planned Actual output Planned Actual output for 2016/17 Planned Actual output Planned Actual output 2016/17 as output output output output for 2016/17. as per Annual per the output as per SDBIP as per SDBIP Report as per SDBIP SDBIP as per SDBIP as per SDBIP
2
3
4
5
6
7
8
9
10
[3 + 5 + 7 + 9] 11
[4+6+8+10] 12
13
Variation
[13‐12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: ‐ ‐
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Roads and storm water:
‐ ‐ ‐ ‐
Transport: ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐ ‐ ‐
‐
‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐ ‐
‐ ‐
‐ ‐ ‐
‐ ‐ ‐
Number of clinics to be developed / upgraded Number of pre‐schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐
‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐
‐
‐
‐
‐
‐
‐
‐ ‐
‐
‐
KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections ‐ 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
‐ ‐ ‐ ‐
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
‐ ‐ ‐ ‐
Socio‐Economic Amenities ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Local Economic Development and Job Creation: Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC20
Reason(s) for variation
Remedial action