Summary - Free State Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services
83639 Sites 5517 Households hectares 1317.69 58312 0 62895 4893 62441 1647
Number of households in formal areas with kerb-side refuse removal services (once a week)
Households Households Households Households Households Households Households
62520 583 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
1
2
3
4
5
6
15 14 555
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced
2 396 1 650 104 1 499 5 495 3 068 3 077 1 069 2 315 4 659
530 2 450 48 101 1 072 4 147 3 067 1 070 1 068 18 150
504 2 400 20 25 1 067 2 254 1 757 1 067 1 065 15 210
504 1 800 20 22 1 065 1 997 1 497 1 066 1 065 14 555
15 14 555
Number of Title deeds transferred to eligible beneficiaries 13
8 578
2 834
1 000
150
891
488 53 51 52
22 30 3 7
5 30 3 -
5 15 1 -
-
-
-
530
504
-
-
-
-
26 1 500 2 1 -
-
29 765
29 110
-
-
-
-
-
-
1 891
150
-
(504) (1 800) (35) (22) (1 065) (1 997) (1 497) (1 066) (1 065) (29 110) (150)
-
-
-
-
-
-
5
5
30
15
3
1
-
-
-
(5) (15) (1) -
-
-
-
-
-
-
-
1 -
-
-
-
2 400
1 800
35
35
25
22
1 068
1 065
2 754
1 997
1 759
1 497
1 067
1 066
1 066
1 065
-
-
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
3
-
3
-
1
-
-
-
-
-
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius
1 647
583
-
-
-
-
-
-
-
-
-
-
-
-
Number of additional households to be provided with water connections 2
2 578
583
-
-
-
-
-
-
-
-
-
-
-
-
1 647 4 013
583 -
200 -
100 -
16
-
-
-
-
-
200 16
100 -
-
(100) -
36 348 6 71 823
89 321 8 2 487
89 321 8 2 487
89 321 7 2 487
15 619 1 064
-
-
-
-
104 940
104 940
8
7
3 551
3 551
-
(104 940) (7) (3 551)
2 497 25 7 718 -
931 15 2 696 -
931 15 1 848 -
931 15 1 848 -
-
-
-
-
-
-
931
931
-
(931) (15) (1 848) -
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
4 11 95
1 3
-
-
-
-
-
-
-
(1) -
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
(180)
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
15 619 1 064
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
15
15
1 848
1 848
-
-
-
-
-
3
1
-
-
-
-
-
-
-
-
-
-
-
-
3
-
-
-
-
-
-
180
-
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
Summary
2 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3 579
180
121
-
121
-
125
-
7 -
1
1 899
4 -
1
6 012
2
1
1
3
3 946
Reason(s) for variation
Remedial action
MAN - Mangaung Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
Sites Households hectares 186258 Households 0 Households Households Households Households Households Households 218674 27783 Households
MAN - Mangaung QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Planned Planned Actual Planned Actual Planned Actual Planned Actual Actual output output output output output output output output output for output as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP 2016/17.
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Actual output for 2016/17 as per Annual Report 13
Variation
Reason(s) for variation
Remedial action
[13-12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
31 3 135 4 12 48 879
11 145
4 3 135 4 1
-
-
3 635 3
3 635 3 -
19 916
3 615
2 500
100
11 4 12 7
2 1 3 1
311
570
-
200
3 1 3 2
1 2 500 1 15 731
-
11 145 1 19 916
-
-
-
(3) (635) (3) -
-
500
-
1 200
-
2 000
311
-
(311)
-
3 1 3 2
-
3 1 3 2
-
11
-
4
-
12
-
7
-
-
-
-
-
-
-
11 145
-
-
-
-
-
4
3
3 135
635
-
-
4
3
1
-
-
-
39 832
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
100
350
350
350
-
400
-
350
-
(350)
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections
-
10
80 000
1 200
1 200
1 standpipe was requested but due to financial constraints none was installed none
2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
121 582
2 300
575
-
-
-
2 300
575
-
-
18 834
18 834
55 566
55 566
-
-
-
-
-
-
-
575
575
575
-
575
-
9 417 27 783
9 417 27 783
-
-
-
-
(575) None
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity
-
9 417 27 783
9 417 27 783
-
-
(18 834) (55 566)
p
Number of additional households living in formal areas provided with electricity connections
-
426
426
426
213
-
213
-
852
426
-
Number of additional high mast lights installed
-
30
31
31
15
-
15
-
61
31
-
Number of additional households provided with access to Free Basic Electricity
-
-
-
-
-
-
24 805
-
Number of additional street lights installed
-
-
-
-
-
-
-
-
-
-
-
-
3
1
4
1
-
-
-
(1) (1) - The implimentation of the project will not
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
24 805
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(426) of the g426 connections by 31 December g (31) lights by 31 December 2016.
connections is completed. g lights is completed.
(24 805)
Socio-Economic Amenities Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
1 4 -
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded
-
Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded
-
3 7 1
1
3 4
1
1
realise in the 2016/2017 financial year, but
Actual construction of roads will not be realised due to insufficient budget.
Increase budget
g
MAN - Mangaung Number of fire safety and emergency facilities to be developed / upgraded
2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
12
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
MAN
-
Construction of both of the fire stations are multi year projects which will not be completed at the end of the 2016/17 financial year hence no quarterly targets are reflected.
FS161 - Letsemeng Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS161
Reason(s) for variation
Remedial action
FS162 - Kopanong Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS162
Reason(s) for variation
Remedial action
FS163 - Mohokare Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS163
Reason(s) for variation
Remedial action
DC16 - Xhariep Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
100
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC16
1
190
100
Reason(s) for variation
Remedial action
FS181 - Masilonyana Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
14555
1064
Sites Households hectares
1200 14555 0 14555 1064 14555 1064 14555 0
Households Households Households Households Households Households Households Households
FS181 - Masilonyana QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual Planned Planned Actual Planned Actual Planned Actual Planned Actual output output output output output output output output output output for as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP 2016/17.
1
2
3
4
5
6
1 064 1 064 1 064 1 064 1 064 1 064 -
1 200 20 1 064 1 064 1 064 1 064 1 064 14 555 -
1 200 20 1 064 1 064 1 064 1 064 1 064 14 555 -
1 200 20 1 064 1 064 1 064 1 064 1 064 14 555 -
15 14 555 -
15 14 555 -
4
4
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Actual output for 2016/17 as per Annual Report 13
Variation
[13-12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
1 200
1 200
35
35
-
-
1 064
1 064
1 064
1 064
1 064
1 064
1 064
1 064
1 064
1 064
29 110
29 110
-
-
-
(1 200) (35) (1 064) (1 064) (1 064) (1 064) (1 064) (29 110) -
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
6
6
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 064
-
-
-
-
-
-
-
-
-
-
-
-
-
300
-
-
-
-
-
-
-
-
-
-
-
-
-
1 064 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
-
15 619 2 1 064
15 619 2 1 064
15 619 2 1 064
15 619 1 064
15 619 1 064
31 238
31 238
2
2
2 128
2 128
-
(31 238) (2) (2 128)
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
300 -
848 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4 4
1 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
100
-
-
-
-
-
-
95
100
-
(100)
Socio-Economic Amenities Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and
-
-
-
-
-
-
-
-
95
95
4
1
Reason(s) for variation
Remedial action
FS181 - Masilonyana FS181
FS182 - Tokologo Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
10611 Sites Households 583 hectares
Number of households in formal areas with access to basic electricity
11034 0 10611 583 10418 583
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households Households Households Households Households Households Households
10611 583 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
3 583 1 1 583 2 500
3 583
583 -
-
15 6
2
-
1 1
1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
200 -
100 -
-
(100) -
-
-
-
3
2
-
-
-
(2) -
-
-
931
931
-
(931) (15) (1 848) -
-
-
-
-
(35)
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
1
-
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
3
3
1
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
583 583
583 583
-
583 -
583 -
200 -
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
100
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
3
3
3
2
-
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
931 15 1 848 -
931 15 1 848
931 15 1 848
931 15 1 848
15
15
1 848
1 848
-
-
-
-
-
1
-
-
-
Socio-Economic Amenities Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
75
35
-
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS182
2
150
1
150
1
75
-
35
Reason(s) for variation
Remedial action
FS183 - Tswelopele Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS183
Reason(s) for variation
Remedial action
FS184 - Matjhabeng Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS184
Reason(s) for variation
Remedial action
FS185 - Nala Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS185
Reason(s) for variation
Remedial action
DC18 - Lejweleputswa Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC18
Reason(s) for variation
Remedial action
FS191 - Setsoto Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS191
Reason(s) for variation
Remedial action
FS192 - Dihlabeng Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
37729 Sites Households
1470
hectares 117.69 32723 0 37729 846
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services
Households Households 37468 Households 0 Households Households
Number of households in formal areas with kerb-side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
Households Households
37354 1 423
Households
QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Planned Actual output Planned Planned Actual output Planned Actual output Planned Actual output for 2016/17 for 2016/17. as per Annual output output output output output as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
Reason(s) for variation
Remedial action
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
1 296 50 4 4 1 423 4 4 1 2 315
26
500 3 2 -
50 28 1 2 500 3 2
891
500 1 -
-
-
-
-
-
-
26 1 500 2 1 -
-
26
-
-
-
-
-
-
-
-
-
-
-
-
891
-
-
-
-
-
-
-
-
-
-
-
-
-
1 1 000
500
5
-
2
1
1
-
(500) (1) -
891
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
16
16
-
-
-
-
-
-
-
16
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
95 There are no budget allocation for park
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3
-
-
-
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
223 -
2 0 -
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
-
37 354 none
37 354 none
1 423
37 354 none
1 423
1 423
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
5 870 -
Socio-Economic Amenities Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
95
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped
-
Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded
-
Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded
2
3
-
1
-
1
1
1
1
-
-
-
-
-
-
-
-
3
1
-
-
-
-
-
-
3
-
-
-
-
-
-
-
development.
2
-
12
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS192
-
489
122
121
-
121
-
125
-
489
-
-
-
Budget be availled.
Clarens Public Library and Rosendal Public Library due to be developed. The Department of Sport, Arts, Culture and Recreation is responsible for building the new Clarens Library and Rosendal Public Library.
Identification of sites for the establishment of new cemetries in the following towns: Bethlehem, Fouriesburg and Clarens. Upgrading of all cemeteries around Dihlabeng.
Apply for MIG funding for the establishment of cemeteries. Town Planner for establishment of cemeteries in all towns was appointed. Awaiting Council's approval for the proposed sites before process can unfold. No allocation of budget for upgrading the cemeteries, .
No funds for establishement of satelite fire stations
Request financial assistance from TMDM.
FS193 - Nketoana Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS193
Reason(s) for variation
Remedial action
FS194 - Maluti-a-Phofung Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites 2000 Households hectares 0
Households 0 Households Households 2000 Households Households 0 Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
0 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1st Quarter Planned output as per SDBIP
1st Quarter Actual output
1
2
3
4
2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output for 2016/17 Planned Actual output Planned Planned Planned output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
1 100 1 600 100 3 2 000 2 000 3 3 3 012 5 187
504 1 200
3 012 2 834
504 1 200 25 3 690 690 1 1 654 1 000
504 600 22 1 433 433 1 1 150
-
-
-
-
-
-
51 53 51 40
15 30 3 -
5 30 3 -
5 15 1 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
100 3 2 000 2 000 3 3
504
504
-
-
1 200
600
-
-
25
22
3
1
690
433
690
433
1
1
1
1
-
-
654
-
1 000
150
-
(504) (600) (22) (1) (433) (433) (1) (1) (150)
-
(5) (15) (1) -
-
-
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
5
5
30
15
3
1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
36 348 3 71 823
36 348 3
36 348 3
36 348 3
36 348
36 348
3
3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(36 348) (3) -
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
-
-
-
-
-
-
-
-
-
-
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS194
1 748
4 883
3 135
-
3 135
Reason(s) for variation
Remedial action
FS195 - Phumelela Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week) Number of households living in informal areas with access to refuse removal
Households
QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
1
Target for 1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of 2016/17 as Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual per the output output output output output output output output output output for SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP 2016/17.
2
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Actual output for 2016/17 as per Annual R t 13
Variation
[13-12] 14
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
KMs of new paved roads to be built
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new gravelled roads to be built
-
-
-
-
-
-
-
-
-
-
KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and
Reason(s) for variation
Remedial action
FS196 - Mantsopa Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS196
Reason(s) for variation
Remedial action
DC19 - Thabo Mofutsanyana Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC19
Reason(s) for variation
Remedial action
FS201 - Moqhaka Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS201
Reason(s) for variation
Remedial action
FS203 - Ngwathe Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS203
Reason(s) for variation
Remedial action
FS204 - Metsimaholo Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS204
Reason(s) for variation
Remedial action
FS205 - Mafube Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
20744 Sites Households 400 hectares 0
Households 0 Households Households 400 Households Households 0 Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
0 Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
425 425 2 005 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
195 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 695
-
-
-
-
-
-
-
-
-
-
-
3 997
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 266 10 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
205
-
-
-
-
-
-
52
45
-
(45)
Roads and storm water:
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
FS205
5
52
45
Reason(s) for variation
Remedial action
DC20 - Fezile Dabi Statistical indicators on service delivery as at the beginning of 2016/17 (to be completed only at the beginning of the municipal financial year) Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service and solid waste removal service Number of households living in informal settlements Number of hectares of land already acquired and suitable for human settlements development
Sites Households hectares Households Households Households Households Households Households Households
Number of households in formal areas with access to basic electricity
Number of households living in informal areas with access to basic electricity Number of households in formal areas receiving water services Number of households living in informal areas receiving water services Number of households in formal areas receiving sewerage services Number of households living in informal areas receiving sewerage services Number of households in formal areas with kerb-side refuse removal services (once a week)
Households
Number of households living in informal areas with access to refuse removal QUARTERLY PERFORMANCE REPORTS - 2016/17 Programme / Subprogramme / Performance Measures
Backlog as at beginning of 2016/17
Target for 2016/17 as per the SDBIP
1
2
1st Quarter 1st Quarter 2nd Quarter 2nd Quarter 3rd Quarter 3rd Quarter 4th Quarter 4th Quarter Summary of Summary of Actual output Actual output Actual output Actual output Actual output for 2016/17 Planned Planned Actual output Planned Planned Planned output output output output output for 2016/17. as per Annual as per SDBIP as per SDBIP as per SDBIP as per SDBIP as per SDBIP Report
3
4
5
6
7
8
9
[3 + 5 + 7 + 9] 11
10
[4+6+8+10] 12
Variation
[13-12] 14
13
QUARTERLY OUTPUTS Spatial Development and the Built Environment: -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading Number of households living in informal settlements targeted for upgrading Number of informal settlements targeted for upgrading with upgrading plans Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement Number of sites serviced Number of Title deeds transferred to eligible beneficiaries 13
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KMs of new paved roads to be built KMs of new gravelled roads to be built KMs of roads resurfaced/rehabilitated/resealed KMs of storm water drainage installed in addition to current ones
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of community halls to be developed / upgraded Number of sports fields and stadia to be developed / upgraded Number of parks / leisure facilities to be developed / upgraded
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Number of clinics to be developed / upgraded Number of pre-schools / early childhood development centres to be developed / upgraded developed Number of community swimming pools to be developed / upgraded Number of libraries to be developed / upgradeddeveloped Number of museums / theatres and art galleries to be developed / upgraded Number of cemetries to be developed / upgraded Number of abbattoirs to be developed / upgraded Number of markets to be developed / upgraded Number of fire safety and emergency facilities to be developed / upgraded 12
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Roads and storm water:
Transport: KMs of new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Number of new bus/taxi stops to be constructed 7
-
-
Access to Services: Water Number of additional water service points to be installed for informal settlement dwellers within a 200m radius Number of additional households to be provided with water connections 2
Sewerage Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers Number of additional households to be provided with sewer connections 2
Solid Waste Management Number of additional households provided with access to weekly refuse removal Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service 2
Electricity Number of additional households living in formal areas provided with electricity connections Number of additional high mast lights installed Number of additional households provided with access to Free Basic Electricity Number of additional street lights installed
Socio-Economic Amenities
Local Economic Development and Job Creation:
Number of additional jobs to be created using the Expanded Public Works Programme guidelines and other
DC20
Reason(s) for variation
Remedial action