40.0m 40.0m 4 0 .0 m 40.0m 60.0m H Plan Profile

Report 7 Downloads 22 Views
railway realignments

DR

3+0 00 3+0 00

TDPP 170 591 202

2+000

Station operational boundary

1+000

HS2 viaduct over River Erewash floodplain

Indicative location of maintenance loops

0+000

C32 1MM ef ert o Dr awi ng

m 0 . 0 4

EAST MIDLANDS HUB STATION

4 0 . 0 m

H

40. 0m

For Con t i nua t i on R

m 0 . 0 4 Indicative extent of A52 realignment to cross over HS2

6 0 . 0 m

590903 110DPPRTM M Dng C321awi o Dr t r e f Re n o i t a u n i ForCont

Indicative extent of

Plan Scale 1:5,000 @ A1 HSL09B

HSL12

70

70

HS2 viaduct over River Erewash floodplain - 4700m 60

60

A52

HS2 Platforms - 415m

Existing railway

B5010

40

40

Platform loop

TP.33. 8

CH. 2197. 3

30

TP.37. 5

50

CH. 2844. 7

50

30

20

20

River Erewash

50

100

3+000

2+950

2+900

2+850

2+800

2+750

2+700

2+650

40. 0 +4. 5

35. 5

39. 2 +3. 9

35. 3

38. 4 +2. 9

35. 5

37. 6 +1. 9

35. 7

36. 8 +0. 5

36. 3

36. 2 0. 1

36. 3

35. 5 0. 7

36. 2

35. 0 1. 2

36. 2

34. 6 1. 6

36. 2

34. 2

36. 2

8 . 6 9 =5 L % 2 0 6 . 1 G=

2. 0

36. 2 33. 9 2. 3

36. 1 33. 7 2. 4

36. 1 33. 5 2. 6

36. 0 33. 5 2. 5

35. 9 33. 5 2. 4

35. 9 33. 6 2. 3

35. 8 33. 8 2. 0

35. 8 34. 0 1. 8

35. 6 34. 3 1. 3

35. 6 34. 5 1. 1

35. 5 34. 7 0. 8

35. 5 34. 9 0. 6

35. 4 35. 2 0. 2

35. 4 35. 4 0. 0

35. 3 35. 6 +0. 3

35. 2 35. 8 +0. 6

35. 2 36. 1 +0. 9

35. 2 36. 3

35. 0

34. 9

34. 8

+1. 1

37. 2 +2. 5

36. 5

37. 4 +2. 8

+1. 5

37. 7 +3. 2

36. 7

37. 9 +3. 7

+1. 8

38. 1 +4. 1

37. 0

38. 3 +4. 4

+2. 2

38. 6 +4. 9

34. 7

34. 6

38. 8 +5. 0

34. 5

34. 2

39. 0 +5. 4

34. 0

39. 2 +5. 7

33. 9

39. 5 +6. 0

2+600

2+550

2+500

2+450

2+400

2+350

2+300

2+250

2+200

2+150

2+100

2+050

2+000

1+950

1+900

1+850 1837. 9

1+800

1+750

1+700

1+650

1+600 1617. 9

1+550

1+500

1+450

1+400

1+350

1+300

1+250

1+200

1+150

39. 7 +6. 4

33. 7

39. 9 +6. 7

33. 8

40. 2 +7. 0

33. 6

40. 4 +7. 4

33. 5

40. 6 +7. 8

33. 5

40. 8 +8. 1

33. 3

41. 1 +8. 6

33. 2

33. 2

41. 3 +8. 8

33. 0

41. 5 +9. 4

32. 8

41. 7 +8. 8

32. 7

42. 0 +9. 1

32. 5

42. 2 +8. 9

32. 5

32. 1

42. 4 +9. 2

32. 9

42. 6 +7. 1

32. 9

33. 3

33. 2

42. 9 +10. 9

35. 5

43. 1 +11. 3

32. 0

43. 3 +11. 2

31. 8

43. 6

32. 1

R=-31500.0

+11. 5

32. 1

L=2323.5

G= 0 . 4 5 4 %

43. 8

0

R=4500.0

L=647.4

275km/h

Design Speed:

0

0 . 0 2 2 = L

L = 2 1 9 7 . 3

+12. 3

Cut and Fill

31. 5

Vertical Alignment

Proposed Level

1+100

L=1617.9

Horizontal Alignment

Existing Level

1+050

1+000

0+950

0+900

0+850

0+800

0+750

0+700

0+650

0+600

0+550

0+500

0+450

0+400

0+350

0+300

0+250

0+200

0+150

0+100

0. 0

Chainage

0+050

0

10

0+000

10

200

500

METRES @ 1:5000

0

5

10

20

50

Profile

METRES @ 1:500

Scale H:1:5,000 V:1:500 @ A1

Client's Comments Addressed

JV

AR

MM

HS2 accepts no responsibility for any circumstances which arise from

P02

the reproduction of this document after alteration, amendment or abbreviation 11/07/17

First Issue

JV

11/07/17

AR

11/07/17

MM © Crown Copyright and database right 2017. All rights reserved.

28/06/17

28/06/17

Ordnance Survey Licence number 100049190

© Crown Copyright material is reproduced with the permission of Land Registry under delegated authority from the Controller of HMSO.

Key Environmental Features Legend World Heritage Site

Scheduled Monuments

Track Centrelines

Registered Parks and Gardens

Viaduct

Special Areas of Conservation

Historical Battlefields

Tunnel

Special Protection Areas

Active and/or Authorised Landfill

Existing Railway Connection

SSSI

Historical Landfill

HS2 Connection

Flood Zones

Fully Retained Cutting/Fill Major Contour

Area of Outstanding Natural

This material was last updated on 2017 and may not be copied, distributed,

Beauty

sold or published without the formal permission of Land Registry.

National Park

Only an official copy of a title plan or register obtained from the Land Registry may be used for legal or other official purposes.

Major Development Sites Additional Development Sites

Scale with caution as distortion can occur. Rev

Description

Drawn

Checked

Con App

Legend

Ramsar

National Nature Reserves

HS2 App

Project/Contract

Zone

East Midlands Station

or if it is issued in part or issued incompletely in any way.

P01 28/06/17

Legends/Notes:

10

Listed Building Grade I

West Midlands to Leeds Route

Registered in England

Engineering Earthworks

Registration No. 06791686

Design Stage

Discipline/Function

Registered office: 2 Snow Hill,

Railway Cutting

Post-Consultation

Queensway,

Railway Track

Birmingham, B4 6GA Drawing Title

Drawn

Checked

JV

Railway Embankment

Date

Track Profile

Listed Building Grade II

Minor Contour

HS2 Depot/Station

Node

Operational Boundary

AR

MM

HSL12

Ground Profile

Listed Building Grade II*

Approved

2017 Preferred Route Creator/Originator

Sheet 1 of 2 Mott MacDonald

Scale

07/06/2017

Size

1:5000

Drawing No.

C321-MMD-RT-DPP-170-591201

A1 Rev.

P02